BL007, BL039 and BL040 PL01-PL02 Scanning Result K. Narita Nagoya University Dec PEANUT meeting
PL01-PL02 Scanning Scanned sample : BL007, BL039, BL040 Scanning area size : 10cm x 8cm (8cm x 8cm for BL007) Scanning time : 4.5h x 4 layer = 18 hour / 2 plates Scanning with S-UTS hardware (Camera + Pre-Processor) Track recognition unit : UTS Current performance 20 cm 2 / hour tan(theta_X) < 0.15 and tan(theta_Y) < 0.15 P.H. > 9 or 10 ( eff. ~ 75% / plate )
BL007 Transportation Jul Brick Assembling? minute ( log book error ) Beam exposure Sep. 8-15, 2005 Development Sep. 15, 2005 PL01 PL02 PL03 beam Transportation Pb
Tracks while transportation. BL007 PL-01 base track : 20,131/64cm 2 PL-02 base track : 22,952/64cm 2 dX= micron dY= micron X Y 4,097 tracks/64cm 2 Brick assembling accuracy dY [micron] dX [micron] Position difference ( Refresh facility )
Tracks while beam exposure. BL007 PL-01 base track : 20,131 – 4097(tracks while transportation) PL-02 base track : 22, dX= - 7 micron dY= micron X Y 90 tracks /64cm 2 Brick assembling accuracy dX [micron] Position difference ( BAM ) Should be <100 micron
Tracks while beam exposure. BL tracks. Position distribution OPERA film Y [cm] X [cm]
Tracks while beam exposure. BL tracks. Slope distribution NuMI beam tan(thetaX) ~ tan(thetaY) ~ tan(thetaX) tan(thetaY)
BL039 Transportation Jul Brick Assembling23 minute Beam exposure Oct. 21-Nov. 3, 2005 Development Nov. 3, 2005 PL01 PL02 PL03 beam Transportation Pb
Tracks while beam exposure. BL tracks. Position distribution OPERA film Y [cm] X [cm] dX= 25 micron dY= 7 micron Brick assembling accuracy ( BAM ) Marvelous !
Tracks while beam exposure. BL tracks. Slope distribution NuMI beam tan(thetaX) ~ tan(thetaY) ~ tan(thetaX) tan(thetaY)
BL040 Transportation Jul Brick Assembling25 minute Beam exposure Oct. 21-Nov. 3, 2005 Development Nov. 3, 2005 PL01 PL02 PL03 beam Transportation Pb
Tracks while beam exposure. BL tracks. Position distribution OPERA film Y [cm] X [cm] dX= -14 micron dY= 15 micron Brick assembling accuracy ( BAM ) Marvelous !
Tracks while beam exposure. BL tracks. Slope distribution NuMI beam tan(thetaX) ~ tan(thetaY) ~ tan(thetaX) tan(thetaY)
Scanning Result. Summary BrickBeam days tracks. beamtracks /cm 2 beam tracks transittracks /cm 2 transit BL / 64cm /64cm 2 64 BL / 80cm /80cm 2 61 BL / 80cm /80cm 2 54
Summary S-UTS version-0 works well for large area scanning. ~ 100 tracks / brick found as beam-related tracks without SFT information. Scanning of other bricks are on progress. Track follow procedure is now starting. PEANUT shift members work well ! Brick assembling accuracy is good.
131 tracks/80cm 2
Outlook Also BL039 PL01+PL02 has done Track scanback for these tracks –BL007,BL039,BL040 –Narita work on this subject SFT to Brick matching –Nonoyama MINOS to SFT matching –Gina
Coordinate Z X Y BL040 Beam
Z direction Z PL01PL02 Beam face2 face1