Dean R Walters Chamber and Bellows Jan. 5, 2006 1 Summary Chamber The plan is to construct a chamber made of 316LN stainless steel with.

Slides:



Advertisements
Similar presentations
Previous Conclusions Concrete will continue to be a dominant construction material Reinforced concrete must crack in order for reinforcing to work lower.
Advertisements

HISTORY, EVOLUTION AND DESIGN OF THIN SEPTUM MAGNETS AT BNL Michael Mapes The 14 th ICFA mini-workshop on septa devices.
NEW DESIGN FOR RF FINGERS C. Garion 5 June, 2012TE-VSC1 Acknowledgements to A. Lacroix and H. Rambeau for materials and help.
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
SSRF1 ALUMINUM ALLOY VACUUM CHAMBERS FOR SSRF L.X. Yin, D.K. Jiang, H.W. Du, X.L. Jiang SSRF Vacuum Group Shanghai National Synchrotron Radiation Center.
Vacuum System Presented by Dong Haiyi Accelerator Center,IHEP,China April 27, 2006.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Jan. 6, 2006 Chamber & Bellows IDR 1 LCLS Undulator Bellows Module Soon-Hong Lee Internal Design Review.
A. Bross Imperial College – 9/04 Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
Apr. 16, 2007 Undulator Breakout Dean R. Walters 1 Vacuum System Undulator Vacuum System Dean R. Walters Soon-Hong Lee, James Bailey, James.
9/26/2003E.L.B. MICE Meeting 9/26/2003 Absorber design update Edgar L. Black IIT.
Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
October 30, 2007 Undulator Breakout Dean R. Walters 1 Vacuum System Undulator Vacuum System Geoff Pile, Dean R. Walters, Soon-Hong Lee,
Dean R Walters Undulator Vacuum October 12-13, 2004 Facility Advisory Committee Undulator Vacuum System/Mechanical By Dean R Walters.
Dean R. Walters April 20, 2006 Vacuum Chamber Review 1 LCLS Undulator Vacuum Chamber Dean R. Walters.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
Dean R Walters November 15, 2004 Integration of the Vacuum and Diagnostics with the Undulator By Dean R Walters APS.
D Walters Undulator System June 17, Undulator System Components Status Dean Walters.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Status of the MuCool Cavity Prototype Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 21, 2005.
1 RF-Structures Mock-Up FEA Assembly Tooling V. Soldatov, F. Rossi, R. Raatikainen
Non-Arc Welding Processes Resistive heating, chemical reactions, focused light and electrons, sound waves, and friction can also be used to join materials.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
Allan DeMello Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008 RFCC Module and Subcomponents Mechanical Design.
Aluminum bellows for experiments
Vacuum system in the main Linacs C. Garion CERN/TE/VSC CLIC09 workshop, October.
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
Dec. 4, 2001 CERN-1 Hans de Vries VELO Mechanics  RF/vacuum foil  Rectangular bellow  Wake field suppressors  Cabling Summary & Outlook VELO mechanical.
Ernie Ihloff 21 May 08 Preliminary Heat Shield Design for nEDM.
Electrostatic Septum For AGS C. Pai Brookhaven National Laboratory Collider-Accelerator Department
Cavity support scheme options Thomas Jones 25/06/15.
Summary of Working Group II – Chamber Coating and Treatment Participants: Michel ChanelCERN Ping HeBNL Dick Hseuh BNL Roberto KersevanESRF Yulin LiCornell.
1 COMPTON POLARIMETER PRELIMINARY MAGNET DESIGN 06/03/08 Christopher Vidal, Senior Mechanical Designer Ernie Ihloff, P.E., Engineering Group Leader EE.
Milano A. Basti, INFN-Pisa 1 T4CM Design and R&D Status at Pisa A.Basti INFN-PISA.
Oct. 12, 2006 Undulator Breakout Dean R. Walters 1 Vacuum System Undulator Vacuum System Dean R. Walters Soon-Hong Lee, James Bailey, James.
2009/1/16-18 ILD09 Seoul 1 Notes for ILD Beam Pipe (Technical Aspect) Y. Suetsugu, KEK Parasitic loss Vacuum pressure profile Some comments for beam pipe.
ANSYS Calculations: DC Distortions Sense Wires with Varying Tension Shortest wire (m)0.3 Longest wire (m)4 Difference between short and long wires3.7 Division.
1.3GHz Input Coupler for ILC
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
1 Vacuum chambers for LHC LSS TS Workshop 2004 Pedro Costa Pinto TS department, MME group Surface Characterization & Coatings Section.
Other Aluminum Welding Processes
Cavity support scheme options Thomas Jones 25/06/15 1.
Further tests on thin steel and composite fabricated stubs Dr. Jahid Zeghiche Univesity of Al-Baha K.S.A.
Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 1 LCLS Undulator Diagnostics and Vacuum System Overview Dean R. Walters.
TOTEM Roman Pot Upgrade Project Pots design, tests and timeline production CERN 11 July 2013 D.Druzhkin (NIKIET, Moscow, Russia) 1 & 20th LTEX Meeting.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM25 at RAL, UK November 6, 2009.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
Problems 1. A large plate is fabricated from a steel alloy that has a plane strain fracture toughness of 82.4MPa√m. If, during service use, the plate is.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 1 /13 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
High Energy Dump of the Super Proton Synchrotron at CERN – Present and Future designs A. Perillo-Marcone (EN-STI) Contributions from several colleagues.
Engineering of the power prototype of the ESRF HOM damped cavity* V. Serrière, J. Jacob, A. Triantafyllou, A.K. Bandyopadhyay, L. Goirand, B. Ogier * This.
1 Long QXF Mirror Fabrication (MQXFPM1) Rodger Bossert HiLumi-LARP Collaboration Meeting May 18-20, 2016 SLAC R. Bossert - HiLumi Collaboration Meeting.
SPS High Energy LSS5 Thermal contact & cooling aspects
Jan , 2008 LCLS Undulator Week Dean R. Walters 1 Vacuum Components Undulator System SH Lee, J Morgan, and D Walters.
704 MHz cavity design based on 704MHZ_v7.stp C. Pai
Chiara Di Paolo EN-STI-TCD Material Choice for the Vacuum Window at the Exit of BTM.
Material alternatives to limit activation of ZS
Status of design and production of LEP connection cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Wideband kickers Mechanical design and Fabrication
Challenges of vacuum chambers with adjustable gap for SC undulators
LARP Phase II Secondary Collimator RC1
LARP Phase II Secondary Collimator RC-1
Undulator System Components Status Dean Walters
CEPC Vacuum Systems Design Consideration
LCLS Vacuum System Plans (July 07)
Chamber & Vacuum System
Aluminum Clamshell Vacuum Chamber Development Plan
LCLS Undulator Vacuum Chamber
Presentation transcript:

Dean R Walters Chamber and Bellows Jan. 5, Summary Chamber The plan is to construct a chamber made of 316LN stainless steel with an interior coating of aluminum. The switch from copper to aluminum supported be the work on AC Conductivity where Al has slightly higher conductivity than Cu. U Profile vacuum chamber has a deflection <6  m and stresses lower than 42 MPa. The support has the adjustability and the strength, 4.8 MPa, to bear the load of the chamber Vendor samples have been measured with surface finishes smoother than 25 nm. Samples have been formed into a U shape and the surfaces of some of the samples are smoother than 400 nm. A series of Laser weld tests have been completed and a set of welding parameters have been determined that can yield penetrations up to 1.5 mm. Aluminum has been sputtered onto stainless steel and the strength of the adhesion passed the ‘scotch tape’ test after baking. To work within the tight space restrictions of the Short (and Long) Break the EVAC Cefix flange has been selected as the vacuum seal. Bellows Bellows assembly is designed for transverse displacement of  2 mm Spring fingers of thickness of 0.15 mm has a stress <226 MPa in the case of displacement of 2 mm Selected spring fingers to be made of BeCu, stub of OFE Cu, and the bellows of 347 SST Plating on the fingers and the stub are Ag and Rd, a lab test will be performed to determine the plating thickness

Dean R Walters Chamber and Bellows Jan. 5, Conclusions Chamber Chamber and support designs are completed FE analysis is completed A plan for chamber construction has been made Samples have been made of the fabrication processes: polishing, coating, bending, and welding. Test plan and schedule have been presented The prototype is ready to start construction Bellows Bellows design is completed FE analysis is completed Test plan and schedule have been presented The prototype bellows is ready to start construction

Dean R Walters Chamber and Bellows Jan. 5, Any Questions?