LIGO-G010242-00-D partial ADVANCED LIGO1 Development Plan R&D including Design through Final Design Review »for all long lead or high risk subsystems »LIGO.

Slides:



Advertisements
Similar presentations
LIGO-G M May 17, 2006 Installation (INS) Requirements and Design Breakout Presentation NSF Review of Advanced LIGO Project Dennis Coyne, Caltech.
Advertisements

LIGO-G D Comments: Staged implementation of Advanced LIGO Adv LIGO Systems 17 may02 dhs Nifty idea: a way to soften the shock, spread cost, allow.
LIGO-G M Advanced LIGO Construction Proposal Submission Gary Sanders LIGO Laboratory PAC 12 June 2002, Cambridge.
G R LIGO Laboratory1 Advanced LIGO Research and Development David Shoemaker LHO LSC 11 November 2003.
LIGO-G D Detector Installation and Commissioning Stan Whitcomb NSF Annual Review 30 April 2001 Caltech.
LIGO- G M State of the LIGO Lab Stan Whitcomb LSC meeting Hanford 17 August 2004.
LIGO-G W Status of LIGO Installation and Commissioning Frederick J. Raab, LIGO Hanford Observatory.
LIGO-G0200XX-00-M LIGO Laboratory1 Pre-Isolation Dennis Coyne LIGO Laboratory NSF LIGO Annual Review, at MIT 23 October 2002.
LIGO-G M LIGO Laboratory1 Adv. LIGO Installation (INS) Plans, Schedule, Costs, Team Plan, Schedule Costs Team.
Laser Interferometer Gravitational-Wave Observatory Who? Presented By: Bonnie Wooley.
LIGO-G M Advanced LIGO Cost, Schedule and Management Gary H Sanders NSF Review of Advanced LIGO Caltech, June 11, 2003.
LIGO-G M LIGO Status and Plans Barry Barish LSC Meeting 19-Aug-02.
LIGO-G M Overview of LIGO R&D and Planning for Advanced LIGO Detectors David Shoemaker NSF Operations Review Hanford, 26 February 2001.
LIGO-G M LIGO Laboratory1 Adv. LIGO Facilities Modifications (FAC) Plans, Schedule, Costs, Team Plan, Schedule Costs Team.
LIGO-G M Status of LIGO Barry Barish PAC Meeting Caltech 3-June-04 Upper limits on known pulsar ellipticities.
LIGO-G M April 5, 2006 Interferometer Sensing and Control (ISC) Cost and Schedule Breakout Presentation NSF Review of Advanced LIGO Project Richard.
LIGO-G W Status of LIGO Installation and Commissioning Frederick J. Raab, LIGO Hanford Observatory.
LIGO-G D Installation and Commissioning Status Stan Whitcomb Program Advisory Committee 14 June 2001 Caltech.
4/25/11 G v3 1 Facility Modifications and Preparations (FMP) Technical Status Annual NSF Review of Advanced LIGO Project April , 2011 John.
LSC General Meeting LIGO Scientific Collaboration - University of Wisconsin - Milwaukee 1 UWM Data Analysis Facility LSC General Meeting, August.
LIGO-G M May 31-June 2, 2006 Input Optics (IO) Cost and Schedule Breakout Presentation NSF Review of Advanced LIGO Project David Reitze UF.
LIGO-G M Status of LIGO Gary Sanders LIGO Laboratory PAC-12 Meeting, June 2002 Cambridge.
LSC Meeting, Livingston Observatory, 3/18/03 Proposal for Trinity University Participation in the LSC Dennis Ugolini, Trinity University Wednesday Plenary.
LIGO-G M Management of the LIGO Project Gary Sanders California Institute of Technology Presented to the Committee on Programs and Plans of the.
LIGO-G M 1 Conceptual Design Review: Initial LIGO Seismic Isolation System Upgrade Development, Implementation Plan & Schedule Dennis Coyne April.
G M 1 Advanced LIGO Update David Shoemaker LSC/Virgo MIT July 2007.
LIGO- G D Status of LIGO Stan Whitcomb ACIGA Workshop 21 April 2004.
LIGO-G D The LIGO-I Gravitational-wave Detectors Stan Whitcomb CaJAGWR Seminar February 16, 2001.
LIGO-G D Advanced LIGO Systems Requirements Review 3 July 2001.
LIGO-G M Major International Collaboration in Advanced LIGO R&D Gary Sanders NSF Operations Review Hanford February, 2001.
G Z LIGO R&D1 Input Optics Definition, Function The input optics (IO) conditions light from the pre- stabilized laser (PSL) for injection into.
LIGO-G M Planning and Implementation Strategy for Advanced LIGO Gary Sanders LSC Meeting Hanford, August 14, 2001.
1 Feedback from the executive committee meeting Benno Willke GEO meeting, Glasgow October 2006.
LIGO-G M Summary Remarks: Management of LIGO Gary Sanders California Institute of Technology NRC Committee on Organization and Management of Research.
G R LIGO Laboratory1 Advanced LIGO David Shoemaker NSF LIGO Review 23 October 2002.
LIGO-G D LIGO R&D1 Advanced LIGO R&D Review The PSL Peter King & Rich Abbott October 8, 2002.
LIGO-G D What can we Expect for the “Upper Limit” Run Stan Whitcomb LSC Meeting 13 August 2001 LIGO Hanford Observatory A Personal Reading of.
LIGO-G M Organization and Budget Gary Sanders NSF Operations Review Caltech, February 26, 2001.
LIGO-G M LIGO Status Report Barry Barish LSC Meeting - Hanford 14 Aug 01.
LIGO-G D LSC Meeting Nov An Early Glimpse at the S3 Run Stan Whitcomb (LIGO–Caltech) LIGO Scientific Collaboration Meeting LIGO Hanford.
February 26, 2001LIGO-G B-P1 LIGO Future Operations (FY ) Budgets, Schedules, and Milestones NSF Review February 26, 2000 Hanford, Washington.
LIGO-G M LIGO Laboratory1 Adv. LIGO Installation (INS) Plans, Schedule, Costs, Team Plan, Schedule Costs Team.
LIGO- G D E7: An Instrument-builder’s Perspective Stan Whitcomb LIGO Caltech LSC Meeting Upper Limits Plenary Session 22 May 2002 LIGO Livingston.
LIGO-G M Advanced LIGO Cost, Schedule and Management Gary H Sanders NSF Review of Advanced LIGO Caltech, June 11, 2003.
LIGO-G M LIGO Status Gary Sanders GWIC Meeting Perth July 2001.
LIGO-G M Overview of LIGO R&D and Planning for Advanced LIGO Detectors Gary Sanders NSF R&D Review Caltech, January 29, 2001.
LIGO-G D Detector Installation and Commissioning Stan Whitcomb NSF Operations Review 26 February 2001 LIGO Hanford Observatory.
LIGO-G D Commissioning at Hanford Stan Whitcomb Program Advisory Committee 12 December 2000 LIGO Livingston Observatory.
LIGO-G M Overview of the LIGO Continuing Operations (FY FY2006) Proposal Gary Sanders LIGO PAC9 Meeting December 2000.
Advanced Towards Advanced Virgo Giovanni Losurdo – INFN Firenze Advanced Virgo Coordinator on behalf of the Virgo Collaboration.
LIGO-G M Advanced LIGO Construction Proposal Submission Gary Sanders LIGO Laboratory LSC Meeting August 2002, Hanford.
LIGO-G M State of the LIGO Laboratory Gary Sanders LIGO/Caltech LSC Meeting, LLO March 16, 2004 State of LIGO.
LIGO- G M LIGO Status Stan Whitcomb Oversight Committee 20 October 2004.
LIGO-G D Commissioning P Fritschel LIGO NSF review, 23 October 2002 M.I.T.
LIGO-G M Managing LIGO: Lessons for a Collaboratory Gary Sanders LIGO/Caltech NEES Awardees Meeting NSF, December 19, 2001.
G R 2004 Plan Update LIGO Systems meeting 22 Jan 04 dhs.
Data Acquisition, Diagnostics & Controls (DAQ)
NSF Annual Review of the LIGO Laboratory
Dawn II, July 8, 2016 GaTech Organizing the international community: issues, open questions, opportunities Dave Reitze LIGO Laboratory, Caltech LIGO Laboratory.
Prospects and plans : LIGO interferometers Michael Landry LIGO Hanford Observatory LSC meeting, MIT Nov 4-5, 2006.
Reaching the Advanced LIGO Detector Design Sensitivity
Update on the Advanced LIGO PSL Program
Nergis Mavalvala MIT IAU214, August 2002
Status of LIGO Installation and Commissioning
R&D Highlights Seismic Isolation Suspensions ISC/40m
Stan Whitcomb LSC meeting Livingston 21 March 2005
Stan Whitcomb LSC meeting Hanford 15 August 2005
LIGO Advanced System Test Interferometer
P Fritschel LSC Meeting LLO, 22 March 2005
Improving LIGO’s stability and sensitivity: commissioning examples
Presentation transcript:

LIGO-G D partial ADVANCED LIGO1 Development Plan R&D including Design through Final Design Review »for all long lead or high risk subsystems »LIGO Lab contracts and funds large R&D equipment »Subsystem development plans described at the last LSC meeting (G010082)G Construction Phase Proposal »Major Research Equipment (MRE) funding »includes ‘prosaic’ design efforts »Proposal due this fall Isolation Test Bed (LASTI) »full scale, integrated suspensions & seismic Isolation testing »in-chamber assembly & installation procedure check-out »possible first article test bed

LIGO-G D partial ADVANCED LIGO2 Development Plan (continued) Controls Test Beds (GEO 10m and LIGO 40m) High Power Test Facilities »Component level testing by UFL at LLO »Gingin High Power Interferometer Test Facility Integrated Systems Tests »Pre-Stabilized Laser (PSL), Input Mode Cleaner, Suspensions and Seismic Isolation Test at LASTI »Integrated Servo Control Electronics Testing at the LIGO 40m Lab »Possibly early End Test Mass Suspension & Seismic Isolation replacement at a LIGO Observatory

LIGO-G D partial ADVANCED LIGO3 Organization

LIGO-G D partial ADVANCED LIGO4 LASTI & Supporting Subsystem Integrated Schedule Subsystem schedules are being integrated into a project plan Requirement reviews are already late Testbeds (LASTI, 40m, Gingin) are metronomes for the subsystems NSF funding limits may defer COC long lead procurement

LIGO-G D partial ADVANCED LIGO5 Installation & Commissioning Plan Minimum of a 1 year of Integrated Science Run Before a Major Upgrade Schedule to be Coordinated with International GW Observatories to Keep  2 Detectors Operating Start Installation Only When Production & Assembly Pipeline Will Not Limit the Installation Schedule Install One Advanced LIGO Interferometer and Incorporate Lessons Leaned into the Subsequent Advanced Interferometers (time lag of ~ 18 months) Plan to start installation in early 2006