Senior Design Project Spring 2005 K. Davis and M.Cahay.

Slides:



Advertisements
Similar presentations
Status Report Presentation. Is this initiative ahead of schedule (why – explain)? Is this initiative on schedule (why – explain)? Is this initiative.
Advertisements

MIGRATION MIGR-09. How to Run Your Next Implementation... Don't Let It Run You! Patricia Johnson Senior Systems Consultant Strategic Systems Group, Inc.
So… You want to do a Senior Search project?. Senior Search is a great opportunity. Beachwood students have produced plays, painted pictures, assisted.
7 Chapter 7 The University Lab: Conceptual Design Database Systems: Design, Implementation, and Management, Fifth Edition, Rob and Coronel.
ECE 4334: Capstone Design Fall 2009 Welcome ! Facilitator: Dr. Len Trombetta.
Congratulations on being awarded a grant! NOW WHAT?
Project Status Chemical Engineering Lab Scheduler Team 5 This presentation will probably involve audience discussion, which will create action items. Use.
Assessing and Grading Pamela Dexter, EPICS High Tammy Watson, Agawam High School.
Engineering H193 - Team Project Gateway Engineering Education Coalition Spring Quarter 2006 P. 1 Today and the Week Ahead Week 3 Day 1.
© Nintendo Game Document Game Development - Spring
1 Samples The following slides are provided as samples and references for the Quarterly Reviews Additional slides will be added.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter 2007 Competition Week Week 9 Day 1.
Schedule. Team Notebook Grading Contents: meeting logs (date, time, duration, who is present, topics discussed, action items) graded assignments expenses.
Fundamentals of Engineering for Honors - Team Project P. 1 Spring Quarter 2003 Engineering H193 Project Notebook & Brainstorming Sketches Week 1 Day 2.
Team Name Critical Design Review Team Members Date Fall 2011 Rev A
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
Engineering H193 - Team Project Spring Quarter 2003 P. 1 Performance Test 2 Week 4 Day 3.
Intro to Master Budget AGEC 489/689 Spring 2009 Slide Show #4.
EDGE™ Project Overview P09503 – Electrophotographic Development and Transfer Station David Schwartz – ISE (Team Lead) Ruth Gay – ME Phillip Lopez – ME.
Chapter 3: The Project Management Process Groups
CS & ECE Senior Design Project Winter 2008 Karen Davis Chia Han Altan Ferendeci.
SAC FUNDING. HOW ASUU WORKS Student Fees $1.67 million collected to allocate throughout the year ASUU uses this to help enhance student experiences on.
Spring 2009 ME 481 Laboratory Week #1 Final Design Presentations Mechanical Engineering California Polytechnic State University San Luis Obispo ME481 Senior.
Procurement Analyst Position Update Procurement Training Forum August 24, 2010.
PMP® Exam Preparation Course
Assignment 6 Using Tools to Modify Existing Graphics Jessica Foley (Hingle) November 24, 2007.
IENG 471 Facilities Planning
Announcement – Career Fair Who: Everyone should plan to go… What: Meet / network with companies Meet hiring managers Get information first hand Where:3.
10/10/2015 IENG 471 Facilities Planning 1 IENG Lecture END Project Report Requirements & Project Presentation Information.
CD FY10 Budget and Tactical Plan Review FY10 Tactical Plans for Financial Management Valena Sibley October 8, 2009 Tactical plan nameDocDB# FY10 Tactical.
Boston University Project Management Association Website Development Group 3 Team3 CS632 Dr. Vijay Kanabar Team Members Mario Soto Emily Ziegler Kevin.
1 Introduction to Engineering Second Semester Overview Agenda Team Assignments and Information Exchange Course Overview.
Wind Turbine Design and Implementation Phase III Senior Design May Team Andrew Nigro (EE) Chad Hand (EE) Luke Rupiper (EE) Ryan Semler (EE) Shonda.
CS Tutorial 4 Frid. Oct 16 th, 2009 Prototype Tutorial.
Fall CS-EE 480 Lillevik 480f06-l12 University of Portland School of Engineering Senior Design Lecture 12 Change control, Funding Design Review Milestone.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter Work Day Check Robot Against Budget Work on Oral Report Work.
1 SPSRB Decision Brief on Retiring “Product Name” Date Presenter: V4 July 22, 2015 Guidance can be found on the note pages. Delete this banner when submitting.
Conversion Presentation. Overview T. Rowe Price Conversion Team Flowserve Team Flowserve Participant May 2010 June 2010July 2010August 2010September 2010October.
Expert System Job Offer Evaluation Software May Abstract The project’s focus is to decide what criteria should be used to determine which job offer.
Garside: SNC2D. The following schedule is for Period 2 Class:
HOMEWORK THINGS TO HAVE OUT
EE/CS 480 Fall /29/2015 6:24:03 AM University of Portland School of Engineering Project Burnside Programmable Logic Solar Radiant Heating System.
Welcome to Open House Mrs. Singh Biology ga.us.
FTA Research Program Requirements Bruce Robinson Office of Research, Demonstration and Innovation April 17, 2007.
11/7/07 ABET constraints essay due today timeline/effort matrix due on Friday –read the requirements! –use real dates system requirements due a week from.
Abstract Due to a change in demand, high voltage transmission circuits can become overloaded. Overloads are resolved by the dispatch of power based on.
1 ERCOT Retail Release Overview. 2 How Are Changes Managed? Retail Testing Business Teams Development Teams Release Management Management of: Migration.
ECE 477 DESIGN REVIEW TEAM 14  SPRING Project Overview  Target Audience: Amateur Musicians  Obtain a “Guitar Tab” format of music  View Tabs.
CREATING A LOCAL SYSTEM OF ASSESSMENTS WCPS ACTION PLAN.
CSE Senior Design II Day 1: Getting Organized Spring 2016 Instructor: Mike O’Dell.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1Spring Quarter Lab Day – Controller Lab 1 Brief Follow-up from Wednesday Grading.
Fall CS-EE 480 Lillevik 480f06-l4 University of Portland School of Engineering Senior Design Lecture 4 Definition phase Design phase.
SCHEDULE MANAGEMENT MODULE 8. Required by Specification City/Caltrans Level 1 schedule – simple Less than $1 million, less than 100 working days Advanced.
Preparation of the Self-Study and Documentation
Sample Fit-Gap Kick-off
Executive Committee Meeting [DATE]
Lab-On-A-Chip Overview
Executive Committee Meeting [DATE]
TOPICS: Project Expenditures Project Accounting Project Budgeting
Spring Semester 2015 Lecture 7 Needs vs. Wants
Software Development Process
مدل زنجیره ای در برنامه های سلامت
Team Name Conceptual Design Review
Overview of Course Assessment National 3
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
<Project Name> Milestone Summary Report
Administrator Roundtable Classes & Events October 24, 2008
Session 4: Finalize Project Working Arrangements
Joint Application Development (JAD)
Presentation transcript:

Senior Design Project Spring 2005 K. Davis and M.Cahay

Spring 2005 Schedule (subject to change)

Interface Specifications resubmit: Wednesday 4/6/05 give (informal) drawings of the portions of the project that users (both administrative and end-users), will interact with. The goal of this assignment is to define capabilities of the project from a user’s point of view. –What will a user see and do with your project? – What end result will the user see or obtain? The goal is not to define all possible inputs and their outputs, but rather to give a general overview of the kinds of interaction a user will have with the project.

Team Notebook due Wednesday 4/27/2005 include –meeting logs and notes, including meetings with advisor –expense receipts and budget for supplies –action items and who is assigned to do them –preliminary work on assignments

Interface, Test Plan, and Status 1.Project Goals 2.Interface 3.Test Plan Overview 4.Status of Implementation and Testing 5.Spring Milestones and Dates

Spring Quarter Design Report and Team Assessment new stuff –Test Plan and Results –User Manual –Statement of Goals vs. Accomplishments –Presentation Slides –Self-Assessments Initial Self-Assessment (fall quarter) Final Self-Assessment (spring quarter) [what did you learn?] team/individual assessment form [impact on grading?]

ECECS Senior Design Presentation and Demonstration off-campus: 5/16-5/20 (notify me by 4/8/05) on-campus: 5/23/-5/26 earlier by request is OK

ECECS Senior Design Poster Forum Thursday June 2 nd 10-noon 8 th floor Rhodes