T. Matsushita 1 Station 5 as of 28 Nov 2006 All planes bundled All planes connectorised All planes glued Fibres potted Ready for cut/polishing Shift takers;

Slides:



Advertisements
Similar presentations
Takashi Matsushita Imperial College T. Matsushita 1 Station 5 status.
Advertisements

Ready. Steady Go! 40+60= x Level 1 Time
Takashi Matsushita Imperial College T. Matsushita 1 Quality Assurance 16/05/06.
Takashi Matsushita Imperial College T. Matsushita 1 Station five – assembly/QA.
MICE Tracker workshop, 06Nov Waveguides for Station5 H. Sakamoto / M. Yoshida.
Takashi Matsushita Imperial College T. Matsushita 1 Station 5.
Takashi Matsushita Imperial College T. Matsushita 1 Quality Assurance; status 18/05/06.
G.Barber Tracker Update, Berkeley 10 Feb Tracker Progress Contents:- Station Space Frame Patch Panel / Vacuum Seal Light Guide Map Position of Degrader/Support.
ADAPT is a Human Resources Community Initiative supported by the European Union through the European Social Fund (ESF) Safety in Optical Fibre Systems.
Tracker QA P. Kyberd, M. Takahashi 1 Quality Assurance for SciFi Tracker (Brunel, FNAL, IC, Osaka) A status report: A procedure for ensuring the quality.
Takashi Matsushita Imperial College T. Matsushita 1 Engineering (Mechanical) Geoff Barber.
Final Tracker Connection Map Version 1 1 Connection Mapping for the Final Mice Trackers Geoff Barber November 2005 TM – 03 Jul 06 TM – 21 Jul 06.
Takashi Matsushita Imperial College T. Matsushita 1 Full tracker station assembly/QA, schedule.
Takashi Matsushita Imperial College T. Matsushita 1 Station5 in UK.
MICE Tracker Update Alan Bross NFMCC Friday Meeting November 10, 2006.
Takashi Matsushita Imperial College T. Matsushita 1 Tracker Status.
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
$1,000,000 $500,000 $100,000 $50,000 $10,000 $5000 $1000 $500 $200 $100 Is this your Final Answer? YesNo Question 2? Correct Answer Wrong Answer.
Tracker Summary Alan Bross MICE CM October 10, 2007.
G. Barber Sci-Fi Tracker Progress Ral 28 Oct Progress On The Design Of The Full Tracker Contents:- Recap of New Station Layout Version 2.5 Version.
Takashi Matsushita On behalf of IC/Brunel team Imperial College T. Matsushita 1 Preparation for station five Construction/bundling/connectorisation.
1M. Ellis - NFMCC - 31st January 2007 MICE Tracker.
4th Station Waveguide Test Roger Hare & Aron Fish.
Takashi Matsushita Imperial College T. Matsushita 1 Station5 Assembly/QA status, schedule.
Takashi Matsushita Imperial College T. Matsushita 1 Quality Control of Station Assembly.
Tracker Summary Alan Bross MICE CM17 CERN February 25, 2007.
G.Barber/Peter Cooke: Mechanical Design Update Imperial 22 July Mechanical Update for Tracker workshop Contents:- New Station Layout Light Guide.
Final Tracker Connection Map Version 1 1 Connection Mapping for the Final Mice Trackers Geoff Barber November 2005 TM – 03 Jul 06 TM – 21 Jul 06.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
T. Matsushita 1 Scintillating fibre tracker The scintillating fibre tracker reconstructs muon tracks before and after the MICE cooling section in 4 T magnetic.
Dec
MICE Phone Meeting 26 October Status report of Waveguides for Station5 Hideyuki Sakamoto Contents Review of production process Present status Plans.
T. Matsushita 1 News Ribbons - i Inspection at IC All five ribbons have production date Two ribbons have mold ID + production ID (e.g. mold4#1) One ribbon.
T. Matsushita 1 QA: Fibre Counting Software 1. Take CCD image of comb/connector 2. Cut noise 3. Find bundles: Nearest Neighbour Clustering, merge clusters.
Preparation for Run10 RIKEN/RBRC Itaru Nakagawa. TLD badges (to be replaced every two weeks) Location of dosimeters in MuTr.S St.1 TK361 TK362 TK363 TK364.
Requirements for the Software Group (and agreed actions)
Jan 2016 Solar Lunar Data.
Aron Fish Imperial College Mice Video Conference 01/02/06
Decoding….
Scintillating Fiber/Clear Fiber QA and Ribbon Production
Bellringer 28 Aug What is the square root of 64?
Hire Toyota Innova in Delhi for Outstation Tour
Analyzing patterns in the phenomena
Milestones & Deliverables BENE III period Jan 06 - Jun07
Average Monthly Temperature and Rainfall




Figs B C D A B C D A A B Co S Ci A B X D C Y.



Who Wants to Win a Million?
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Types of Errors And Error Analysis.

Which of the following is equivalent to the fraction below? 3 8
Proposed core price & service spec L1 product milestone 31 Dec 2019
Change Management E2E Roadmap
Presentation transcript:

T. Matsushita 1 Station 5 as of 28 Nov 2006 All planes bundled All planes connectorised All planes glued Fibres potted Ready for cut/polishing Shift takers; Aron, Ash, Maiko, Maria, Sarah, Takashi, Vera

T. Matsushita 2 bundling/connectorisation o view X - mold4#X / 22 aug start: 09 sep 06, 11:40 - end: 13 sep 06, 19: fibres o view W - moldX#X / 17 aug start: 03 nov 06, 09:50 - end: 10 nov 06, 10: fibres o view V - mold4#1 / 15 aug start: 13 nov 06, 13:30 - end: 16 nov 06, 19: fibres; one extra!

T. Matsushita 3 Corrected errors Fibre swapping between bundles; x 7 Fibre swapping between connectors; x 1 Wrong mapping of channel; x 4

T. Matsushita 4 Towards full production… Received more doublet-layers from FNAL Three more carbon-fibre station frame in hand Need to order station connectors; design change? Need to prepare more vacuum-chucks to parallelise production line