VC Sept 2005Jean-Sébastien Graulich Report on DAQ Workshop Jean-Sebastien Graulich, Univ. Genève o Introduction o Monitoring and Control o Detector DAQ.

Slides:



Advertisements
Similar presentations
SciFi Tracker DAQ M. Yoshida (Osaka Univ.) MICE meeting at LBNL 10.Feb.2005 DAQ system for KEK test beam Hardware Software Processes Architecture SciFi.
Advertisements

MICE CM January 2009Jean-Sébastien GraulichSlide 1 DAQ and CAM Summary o Organization o Control and Monitoring o Detector DAQ o Online Monitoring o Front-End.
Daresbury Aug 2005Jean-Sébastien Graulich Detector DAQ Overview and Needs Jean-Sebastien Graulich, Univ. Genève o Introduction o Detector Systems Overview.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Wrap Up o Control and Monitoring o DDAQ o Interface between DDAQ and MCM o Infrastructure Jean-Sebastien.
KEK Test Beam Phase II Plan Makoto Yoshida (Osaka Univ.) MICE FT Daresbury 2005/8/30.
April 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Goal for BTF o Status o First results o To be done.
Workshop Goals MICE Controls and Monitoring Workshop September 25, 2006 A. Bross.
Tracker DAQ Makoto Yoshida (Osaka Univ.) MICE Frascati 2005/6/27.
DAQ WS02 Feb 2006Jean-Sébastien GraulichSlide 1 DDAQ Hardware Architecture o General Architecture o Tracker Baseline o TOF Baseline & Options o EmCal Baseline.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DAQ for BTF o BTF Overview o Hardware Overview o DAQ Software Description o What’s next o Summary Jean-Sebastien.
SciFi Tracker DAQ M. Yoshida (Osaka Univ.) MICE Tracker KEK Mar. 30, 2005.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Detector DAQ Test bench in Geneva o Preparing for Test Beam o FE electronics tests o Detector.
2005/10/22 MICE CM at RAL, Tracker Parallel, Makoto Yoshida 1 KEK test beam - introduction - M. Yoshida MICE CM tracker parallel 2005/10/ /10/22.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DDAQ Pending Issues o Detector FEE o Software framework o Trigger o Data Storage Jean-Sebastien Graulich,
Target Online Software J. Leaver 01/12/ /06/2015Imperial College 2 Target Controller Software Software for Stage 1 upgrade nearing completion –Hardware.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Interface between Control & Monitoring and DDAQ o Introduction o Some background on DATE o Control Interface.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 DDAQ Trigger o Reminder: DAQ Trigger vs Particle Trigger o DAQ Trigger o Particle Trigger 1) Possible.
MICE Tracker Readout and Data Acquisition; Solenoid Magnetic Field Measurement Terry Hart for the MICE Collaboration, Illinois Institute of Technology,
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Online Summary o Detector DAQ o Controls And Monitoring o Online Data Base o Bottom Lines Jean-Sebastien.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
VC MICO Report July 07Jean-Sébastien GraulichSlide 1 Main news  DAQ test bench running in Geneva 2 LDCs connected to 2 different PCs, 1 GDCs DAQ trigger.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
DAQ System at the 2002 ATLAS Muon Test Beam G. Avolio – Univ. della Calabria E. Pasqualucci - INFN Roma.
MICE CM18 June 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM17 o Detector DAQ software o Front End Electronics o Schedule Milestones.
Normal text - click to edit RCU – DCS system in ALICE RCU design, prototyping and test results (TPC & PHOS) Johan Alme.
MICE VC June 2009Jean-Sébastien GraulichSlide 1 Feed back from the DAQ review o Facts o Detector DAQ o Important Comments o Bottom line Jean-Sebastien.
Boosting Event Building Performance Using Infiniband FDR for CMS Upgrade Andrew Forrest – CERN (PH/CMD) Technology and Instrumentation in Particle Physics.
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
Control & Monitoring System Update Contributors: Brian Martlew - Daresbury Laboratory - STFC James Leaver - Imperial College Pierrick Hanlet - Fermilab.
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.
ATCA based LLRF system design review DESY Control servers for ATCA based LLRF system Piotr Pucyk - DESY, Warsaw University of Technology Jaroslaw.
MICE CM16 Oct 2006Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM15 o Detector DAQ software o Interface DDAQ / Mice Control & Monitoring.
Online Calibration of the D0 Vertex Detector Initialization Procedure and Database Usage Harald Fox D0 Experiment Northwestern University.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
Review of Daresbury Workshop MICE DAQ Workshop Fermilab February 10, 2006 A. Bross.
1 Introduction to UniDAQ Makoto Yoshida (Osaka Univ.) MICE DAQ 2005/9/1.
André Augustinus 10 October 2005 ALICE Detector Control Status Report A. Augustinus, P. Chochula, G. De Cataldo, L. Jirdén, S. Popescu the DCS team, ALICE.
ALICE, ATLAS, CMS & LHCb joint workshop on
MICO July 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Overview – Hardware status o Installation at RAL o DAQ workshop o Current Activities Jean-Sebastien.
Clara Gaspar, March 2005 LHCb Online & the Conditions DB.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Control and Monitoring Summary of DAQ WS III o General Architecture o RF System C&M o D0 EPICS extensions.
Mice CM Oct 2005Jean-Sébastien GraulichSlide 1 MICE Collaboration Meeting Oct05 Review of DAQ Workshop and DAQ Issues Jean-Sebastien Graulich, Univ. Genève.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
Overview of DAQ at CERN experiments E.Radicioni, INFN MICE Daq and Controls Workshop.
FLASH Free Electron Laser in Hamburg Status of the FLASH Free Electron Laser Control System Kay Rehlich DESY Content: Introduction Architecture Future.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE JRA1 Parallel - DAQ Status, Emlyn Corrin, 8 Oct 2007 EUDET Annual Meeting, Palaiseau, Paris DAQ Status.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
News on GEM Readout with the SRS, DATE & AMORE
DØ Online16-April-1999S. Fuess Online Computing Status DØ Collaboration Meeting 16-April-1999 Stu Fuess.
IPHC - DRS Gilles CLAUS 04/04/20061/20 EUDET JRA1 Meeting, April 2006 MAPS Test & DAQ Strasbourg OUTLINE Summary of MimoStar 2 Workshop CCMOS DAQ Status.
MICE CM January 2009Jean-Sébastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM23 o Detector DAQ o Trigger o Online Software o Front End.
Controls & Monitoring Overview J. Leaver 03/06/2009.
DØ Online Workshop3-June-1999S. Fuess Online Computing Overview DØ Online Workshop 3-June-1999 Stu Fuess.
DoE Review January 1998 Online System WBS 1.5  One-page review  Accomplishments  System description  Progress  Status  Goals Outline Stu Fuess.
MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 1 Detector DAQ o Achievements Since CM27 o DAQ Upgrade o CAM/DAQ integration o Online Software o Trigger.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
DAQ Status & Plans GlueX Collaboration Meeting – Feb 21-23, 2013 Jefferson Lab Bryan Moffit/David Abbott.
The DCS Databases Peter Chochula. 31/05/2005Peter Chochula 2 Outline PVSS basics (boring topic but useful if one wants to understand the DCS data flow)
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
ch/~bdl/lepc/lepc.ppt 1 MICE Status and Plans Rikard Sandström Université de Geneve International Scoping Study CERN,
CODA Graham Heyes Computer Center Director Data Acquisition Support group leader.
MICE CM February 08Jean-Sébastien GraulichSlide 1 Report on DAQ & CAM o Detector DAQ Status Hardware Trigger Software o Controls and Monitoring (CAM) o.
M. Caprini IFIN-HH Bucharest DAQ Control and Monitoring - A Software Component Model.
VC98 March 07Jean-Sébastien GraulichSlide 1 DDAQ Status o DAQ Software o Front-End and Trigger o What will happen soon o Schedule Milestones Jean-Sebastien.
Scalable Readout System Data Acquisition using LabVIEW Riccardo de Asmundis INFN Napoli [Certified LabVIEW Developer]
L. Coney UC Riverside MICE CM32 – Glasgow – June 2012
Controlling a large CPU farm using industrial tools
Large CMS GEM with APV & SRS electronics
Tracker Software Status
Presentation transcript:

VC Sept 2005Jean-Sébastien Graulich Report on DAQ Workshop Jean-Sebastien Graulich, Univ. Genève o Introduction o Monitoring and Control o Detector DAQ o Conclusions and Afterthoughts MICE DAQ and Controls Workshop

VC Sept 2005Jean-Sébastien GraulichSlide 2 Introduction  Took place at Daresbury, Aug 31 – Sept 1  14 people registered  Workshop goals Overview MICE needs and main issues Decide general orientations for Control and Monitoring Detector DAQ

VC Sept 2005Jean-Sébastien GraulichSlide 3 On the Agenda  Talks on Control and Monitoring (CM)  Talks on Detector DAQ (DDAQ)  Talks on integration between CM and DDAQ

VC Sept 2005Jean-Sébastien GraulichSlide 4 Workshop Goals (A. Bross)  Refine “Physics” parameter List  Further develop an understanding of the D/C/M needs for Beam Line Cooling Channel Detectors  Produce Baseline Proposal for DAQ Online System Controls system Monitoring system  Produce Outline for Comprehensive MICE D/C/M specification document Start from MICE-NOTE-GEN-097 (Draft01/JSG) Goal to have draft (0/1?) ready for collaboration meeting  GIVE SERIOUS CONSIDERATION TO EXISTING SYSTEMS/SOLUTIONS

VC Sept 2005Jean-Sébastien GraulichSlide 5 Key issues  For CM Safety Guarantee the stability of Beam line, including target system RF system Absorbers  For DDAQ Guarantee stability of the DDAQ system (no data loss nor data taking time loss Guarantee the data quality (integrity and relevance)

VC Sept 2005Jean-Sébastien GraulichSlide 6 About CM  EPICS has been presented (Brian Martlew) Experimental Physics and Industrial Control System Software framework for control monitoring Free, Open Source Based on Channel Access protocol Large user community in physics : Advanced Photon Source (Argonne), PSI, DESY, LBL, LANL, Jefferson Lab, KEK B-Factory Expertise available Daresbury, D0 at FNAL  EPICS was found complying with MICE requirements

VC Sept 2005Jean-Sébastien GraulichSlide 7 About DDAQ  Detector data Readout must be performed at the end of the spill Data has to be buffered in the FEE  There is an ADC problem Conversion time for conventional ADC does not allow 600 muons/1ms spill Critical for EmCal  The Particle-trigger scheme is not well defined Particle trigger = Digitisation trigger ≠ Readout trigger Should be flexible (allow calibration, cosmic events, etc…)  Data Volume: 25 kB/μ (2 kB/μ if zero suppression in the tracker) ~10 MB/spill or 25 GB/run ~ 60 TB/year (2500 runs)

VC Sept 2005Jean-Sébastien GraulichSlide 8 DAQ Architecture Proposal Trigger distribution Optical link Online Monitoring TrackerEmCalTOF Trigger + Ckovs Ethernet Linux PCs GigaBit Switch Run Control Event Builder Online Storage VME Crates Remote Storage

VC Sept 2005Jean-Sébastien GraulichSlide 9 DAQ Software  UNIDAQ has been presented (Makoto) Would require to write an Event Builder  LHC DAQ software have been presented (Emilio) CMS design is not importable DATE from Alice has the following functionalities

VC Sept 2005Jean-Sébastien GraulichSlide 10 List of DAQ functions  Run control (state machine) with GUI Configure DAQ topology Select trigger Start/stop (by user or by DCS) Communicate status to DCS  Partitioning. Its importance is never stressed enough.  Minimal set of hardware access libraries (VME, USB, S- LINK), and ready-to-use methods to initialize interfaces.  Data flow Push (or pull …) data from FE to Storage via (one or more) layer of Event-Building  DAQ performance check with GUI  Data quality monitoring (or framework to do it) GUI most likely external  Logging (DAQ-generated messages) with GUI to select/analyze logs

VC Sept 2005Jean-Sébastien GraulichSlide 11 Emilio pointed out  Users are not experts: provide them the tools to work and to report problems effectively.  Flexible partitioning.  Event-building with accurate fragment alignment and validity checks, state reporting and reliability.  Redundancy / fault tolerance  A proper run-control with state-machine And simplifying to the users the tasks of Partition, Configure, Trigger selection, Start, Stop  A good monitoring framework, with clear-cut separation between DAQ services and monitoring clients  Extensive and informative logging  GUIs

VC Sept 2005Jean-Sébastien GraulichSlide 12 About CM DDAQ  Long discussion Not finalised

VC Sept 2005Jean-Sébastien GraulichSlide 13 Monitoring System

VC Sept 2005Jean-Sébastien GraulichSlide 14 About CM DDAQ MICE Beam Line MICE Cooling Channel MICE Detectors Detector DAQ Slow Control Data Storage Monitoring Data Log Run Control UI MICE User Interface Environment RF Phase

VC Sept 2005Jean-Sébastien GraulichSlide 15 Conclusions  Decisions CM will be based on Epics DAQ will be based on VME bus We’ll PC under Linux Easier if all VME have the same interface  To be done Specifications for DDAQ, including trigger system -> Choose the DAQ software Finalise discussion on DDAQ/CM interconnection Design an Ethernet Network Infrastructure Start Testing