UCSB Silicon Workshop: Shutdown Review Ankush Mitra Academia Sinica.

Slides:



Advertisements
Similar presentations
Phrasal Verb Test 1 21 st September Answer Key #1 1. broke in 2. broken off 3. blow off 4. to back down 5. acting up 6. asked Susan out 7. blew.
Advertisements

Posting Journal Entries to General Ledger Accounts
Results of the ASIC Test New Developments Next Steps Project Meeting.
How to use the Student / Temporary Employee Online Time Sheet Q: When will online time sheets be used? A: Go live is September 16, Online time sheets.
Steve Hahn, CDF Meeting - October 7, CDF Operations Summary Shutdown progress  Work finishing up in west and east bores COT  Loose cables SVX 
IAQ Building 6 Basement. Initial Request To January 3, 2012
Bagby L0 Workshop L0 Infrastructure  Mapping  Installations u Horseshoe Area s Adapter Card u Cathedral s Low Voltage Fuse Panel u Platform s.
CDF CDF Operations Steve Hahn February 7, 2005 All Experimenters ’ Meeting.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
CAEN power supplies The neverending story Jennifer Pursley Johns Hopkins University Silicon Workshop II, May 10-12, 2006 University of California, Santa.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO May 5, 2009.
Slide 1 Anthony Affolder US Silicon Meeting, March 9, 2004 Equipment Status ARCS equipment status à Single module and 4 hybrid DAQ equipment status à Vienna.
CMS Tracker Week – Module Test Meeting – April 2003 – Patrick Gartung 1 Status of US long term module testing Patrick Gartung University of California,
05/11/06Sasha Pronko, Silicon Workshop II, UCSB1 PORTCARDs & DOIMs Sasha Pronko Fermilab.
UCSB Silicon Workshop: SVX3D Ankush Mitra Academia Sinica SVX3D Introduction Initialisation Front-End / Acquisition Digitisation Readout Using the chip.
How to create a WordPress Blog Step 1 Go to Click on the orange button: Sign up now.
Customer Service Roundtable Discussion. Quality Control  What type of evaluations do you perform?  Ride along with the service representative?  Actual.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
October 11 th 2007 Ken Schultz
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 17, 2013.
Faculty of Physics, University of Belgrade General meeting 19 th of August, ToF-LR HV Upgrade Jovan Puzović, Faculty of Physics, Belgrade.
Dec 7, 1999D0 Dir Review Inst/Com DØ Silicon Hookup and Commissioning p Goals and timeline p Overview of Silicon Read out p “Stand alone” commissioning.
Ladder QA manual. Check items 1 Interlock - Temperature of NOVEC. ✓ Check the difference from the value where the QA in RIKEN was performed is less than.
Posting Journal Entries to General Ledger Accounts Making Accounting Relevant Every business completes business transactions daily. Think about the various.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
1/24/01TDC Review1 Report to the TDC Review Committee Presented by Myron Campbell.
Turning forces and Centre of Gravity
UCLA Group Meeting May 01, 2014 Andrew Peck Shayan Rastegari 1 Updates from Lab Andrew Peck & Shayan Rastegari May 01, 2014.
Basic Input/Output System
Joel Goldstein, RAL 4th ECFA/DESY LC Workshop, 1/4/ Vertex Readout Joel Goldstein PPd, RAL 4 th ECFA/DESY LC Workshop DAQ Session 1 st April 2003.
Matthew Gardner, 8/20/14.  Replace old water based AC system with conventional rooftop AC system. Drain and abandon old water lines.  Remove old air.
ISEG HV power supplies for NA62 R. Fantechi 6/4/2011.
Mod 0273: Governance of Feasibility Study Requests to Support Changes to Network Exit Agreements – National Grid NTS Response.
GEM tests at BNL Zvi, Sasha, Ilia and others. Triple GEM detector tests Last Tuesday after HBD meeting we exchanged CF4 by Ar/CO2 but still there were.
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
Main Injector Beam Position Monitor Upgrade: Status and Plans Rob Kutschke All Experimenters’ Meeting April 3, 2006 Beams-doc-2217-v3.
LOGO. Company Logo Contents Click to add Title.
Identify Customers & Specify Value Create Flow by Eliminating Waste
CDF Silicon Operations Workshop Lake Geneva Dec 18 th -19 th Venue of the Meeting: 327 Wrigley Drive Lake Geneva, WI Phone:
All Experimenters MeetingDmitri Denisov Week of July 22 to July 29 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.1pb -1 u Live:
1 Run IIb Event Builder upgrade Director’s Review Jan Steve TetherRon RechenmacherMarkus KluteBruce Knuteson MITFNAL/CDMITMIT RonSteve Motivation.
 94 LVPS Packages mounted 4’-25’ from the front-end electronics.  4 modules per package. u +5V& -5V “Digital”, +5V & -5V “Analog” 18 A 1A 18A 18Amps.
How to download games from the internet to your computer Tim Blades FVP 12.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
親愛的吉姆舅舅: 今天吃完晚餐後,奶奶說,在家 裡情況變好以前,您要我搬到城裡跟 您住。奶奶有沒有跟您說,爸爸已經 好久沒有工作,也好久沒有人請媽媽 做衣服了? 我們聽完都哭了,連爸爸也哭了, 但是媽媽說了一個故事讓我們又笑了。 她說:您們小的時候,她曾經被您追 得爬到樹上去,真的嗎? 雖然我個子小,但是我很強壯,
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep14, 2015.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
SVD Slow Control Markus Friedl (HEPHY Vienna) DAQ/SC Kickoff Meeting, 8 November 2012.
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
Status of the CDF II silicon tracking system
Memory Caches & TLB Virtual Memory
AM system Status & Racks/crates issues
AFE II Status First board under test!!.
ITS Cooling: Xmas Plan Claudio Bortolin.
Call to Fix Lexmark Firmware Error
FNAL Production Experience
ROD assembly and test in US
UCSB Testing Status Anthony Affolder
Unexpected Failures of Modules on Rods
First Assembled Rod in US
PREPOSITION.
دورة حياة تطوير النظم system development life cycle
CARRYING TOTALS FORWARD ON THE LEFT PAGE
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
Fred’s Input to Rice Workshop
Commodity Flow Management
US Rod Burn-in Readiness DAQ Hardware/Power Supplies
Equipment Status ARCS equipment status DAQ equipment status
Presentation transcript:

UCSB Silicon Workshop: Shutdown Review Ankush Mitra Academia Sinica

11 May 06UCSB Silicon Workshop: SVX3D2 PDB Review Went through EVERY ladder PDB Entry Checked they were up to date and relevant Did any chips recover ? Can we fix any old problem Some ladders appeared to have recovered Did we do any good ? Waiting for the verdict

11 May 06UCSB Silicon Workshop: SVX3D3 April: Month of Bore Both plugs pulled out New challenge: Keep SVX < 0C throughout Diamond Installation Very tricky installation…but did a good job See Peter Dong’s talk New dew-point sensors installed at Sili-Baggy Replaced dead SVX & ISL RH sensor It appears we had no problems: A successful plug pull

11 May 06UCSB Silicon Workshop: SVX3D4 Sili-Baggy Humidity during installation Diamond Install COT Baggy Opened Slight change in Sili-Baggy

11 May 06UCSB Silicon Workshop: SVX3D5 …what else ? VRB Load Balancing Looks it worked: See Mark’s talk CCC Installation A buffer for the Clock to the SRC: See Shulamit’s Talk CAEN Work Fixed a CAEN Backplane Swapped out 3 CAEN PS Making more L00 crowbars Making a replica of Jen’s PS Test stand at FCC Avoid the need to bring CAEN supplies back and forth One worry: Now need to send a bunch of PS back to CAEN What will be the turn around time ??? Chiller work Both chillers overhauled Filters replaced The ISL “Hit me baby one more time” flow meter replaced PS-GUI: Introduced power by crate option Brought back two spare ladders from SciDet for FCC This workshop!!!!