Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.

Slides:



Advertisements
Similar presentations
ISO Task Controller Lecture 9 Task Controller – Part 3
Advertisements

Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Molly, Gwyn, Sam, and Eric.  Sam will have soldered all parts onto our PCB so that we can test it at the meeting  Eric finished MUX code in PIC C and.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
I-heliostat 6/30 update Amy Whitcombe, Kendall Pletcher, Eric Kolker, Kiefer Hicks.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
I-heliostat 6/15 update Amy Whitcombe, Kendall Pletcher, Eric Kolker, Kiefer Hicks.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Chronos Final Presentation What 2 Do? Michael Murphy, Gwynneth Davidoff, Jing Li, Michael Sullivan.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Raphael Finished and ordered the MCA PCB!. Dan Working on the UV PCB Determined an appropriate resistor value Read over Chen’s python code Estimated wavelength:
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
I-heliostat 6/16 update Amy Whitcombe, Kendall Pletcher, Eric Kolker, Kiefer Hicks.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Olin Student Projects 2008 Keith Gendreau Code 662 NASA/GSFC
Thermo-Cooler Controller Kiefer, Mary, Molly, Sam.
Molly, Gwyn, Sam, and Eric.  Fixed temperature sensor circuit- it works!  Successfully soldered a surface mount current sensor and tested it on a breadboard.
I-heliostat 6/23 update Amy Whitcombe, Kendall Pletcher, Eric Kolker, Kiefer Hicks.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
I-heliostat 6/18 update Amy Whitcombe, Kendall Pletcher, Eric Kolker, Kiefer Hicks.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
I-heliostat 6/21 update Amy Whitcombe, Kendall Pletcher, Eric Kolker, Kiefer Hicks.
Molly, Gwyn, Sam, and Eric.  Tested and analyzed enough of our system to make sure that it will work  Finished thermal testing of one of our converters.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
I-heliostat 6/7 update Amy Whitcombe, Kendall Pletcher, Eric Kolker, Kiefer Hicks.
Interface 1: Knobs GUI: link the buttons/knobs to “an action”; prompt MCA.py USB Client: do bit-masking and packet formation; send data as a control transfer.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
I-heliostat 6/29 update Amy Whitcombe, Kendall Pletcher, Eric Kolker, Kiefer Hicks.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
I-heliostat 6/17 update Amy Whitcombe, Kendall Pletcher, Eric Kolker, Kiefer Hicks.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Molly, Gwyn, Sam, and Eric.  We got the Reflow oven to work- time to test it  Eric wrote MUX code- it compiles  Sam started on little PCB (PIC, connector,
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Electron Optics Lillian Tseng Andrew Carmedelle Sarah StrohKorb Kevin McClure 6/6/11.
I-heliostat 6/25 update Amy Whitcombe, Kendall Pletcher, Eric Kolker, Kiefer Hicks.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
I-heliostat 6/28 update Amy Whitcombe, Kendall Pletcher, Eric Kolker, Kiefer Hicks.
I-heliostat 6/14 update Amy Whitcombe, Kendall Pletcher, Eric Kolker, Kiefer Hicks.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
I-heliostat 6/8 update Amy Whitcombe, Kendall Pletcher, Eric Kolker, Kiefer Hicks.
Multichannel Analyzer (MCA) Raphael Cherney Dan Elg Sam Sun Chen Wang.
Molly, Gwyn, Sam, and Eric.  We ed Fred asking about connectors and EAGLE  Sam is set up to conduct a thermal test of a converter in a vacuum 
Smart Home Current Progress Summary. Main Processor – Stellaris.
Items -Latch/comparator issue is ok -ExpressPCB -ADC acquisition time.
 Project overview  Project-specific success criteria  Block diagram  Component selection rationale  Packaging design  Schematic and theory of operation.
Welcome to English 98 in the Communication Learning Center.
Introduction Characteristics of USB System Model What needs to be done Platform Issues Conceptual Issues Timeline USB Monitoring 2 nd Update – 7 th February.
CSE 560aa08. Team Members Kermit Stearns: Project Leader Oscar Flores: Test and Validation Leader Dan Burnett: Documentation Leader Bobby Molique Schmidt:
WEEK 1 You have 10 seconds to name…
CSE 560aa08. Team Members Kermit Stearns: Project Leader Oscar Flores: Test and Validation Leader Dan Burnett: Documentation Leader Bobby Molique Schmidt:
Drilling Down to Individual Students: Using Academic Intervention Plans to Make AYP Attainment Personalized Jennifer D. Morrison, SDT Baker Middle School.
Weekly Progress 14 Dec Tasks Undertaken  In the VRVS meeting with SLAC I was given the following tasks : To evaluate the project’s current functionality.
Pink Elephant Showcase Brief What have we done last week? o Deliverables o Milestone Progress o Estimations What are we going to do this.
Status Report 6 CAPS Cynthia Reyna David Rodriguez Cynthia Salas 10/13/08 Child Abuse Prevention System is a device that will monitor and log abusive hits.
全面推开营业税改征 增值税试点政策培训. 什么是营改增? “营改增”中的“营”指的是营业税,“ 增”指的是增值税。对大多数企业来说,增 值税所带来的税负远低于营业税。 减税本身就是积极的财政政策。营改增所 实现的减税,不仅规模大、范围广,它本质 上是一种“结构性减税”,从而构成“结构 性改革”攻坚战中的实招。
Status Report 7 CAPS Cynthia Reyna David Rodriguez Cynthia Salas
UK Link Technology Refresh
UK Link Technology Refresh
ECE4006 Group 6 – Presentation 5
ECE4006 Group 6 – Presentation 9
Individual Direct Time
Comparing Strings – How to
Capstone Design Update
PLANNED WORK for week #10 (week of Oct. 28 – Nov. 3) PROGRESS
Group 5 – ECE 4006: Week 6 Nihar Patel 7/17/2019.
Presentation transcript:

Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe

Progress  Waiting for MXS  Looking into better ASCII communication method  Talked to Sam (Sun) Recommended sources to look at for USB transfer information Suggested using bulk transfers Offered to help with MCA

Next steps  Input from Keith  Improve ASCII file controls  Testing with MXS, detector/MCA

Revised PERT chart  Goal: Test with MXS, improve system for finalized working GUI/PIC code this week Finish with MXS testing, final physical layout & PCB by middle of next week For the rest of next week, decide what we want to improve upon & how Week after that: implement changes