PALM-3000 1 Project 1640 31 Jan. 2008 COO All-Hands Mtg. Project 1640 is an infrared, coronographic integral-field spectrograph for high-contrast companion.

Slides:



Advertisements
Similar presentations
University College London, Optical Science Laboratory bHROS Progress bench-mounted High Resolution Optical Spectrograph bHROS bHROS Progress General.
Advertisements

MMIRS 1 MMIRS MMT and Magellan Infrared Spectrograph Brian McLeod.
Return to Hubble: Servicing Mission 4 Dr. Frank Summers Space Telescope Science Institute April 2, 2009.
PALM-3000 Management Update A. Bouchez, J. Roberts Team Meeting #15 10/29/09.
NGAO Instrumentation Overview September 2008 Updated Sean Adkins.
1. Common Optics Assembly (COA) Main optics housing riveted on channel housing (with rod) QM delivered
PALM-3000 PALM-3000 Management Update Antonin Bouchez, Jenny Roberts Team Meeting #7 27 February, 2008.
PALM PALM-3000 project status 31 Jan COO All-Hands Mtg. Recent Milestones Requirements review on 12 Nov AO system offline for maintenance.
AURA New Initiatives Office S.C. Barden, M. Liang, K.H. Hinkle, C.F.W. Harmer, R.R. Joyce (NOAO/NIO) September 17, 2001 Instrumentation Concepts for the.
PALM-3000 Management Update A. Bouchez Team Meeting #9 10/22/2008.
PALM-3000 PALM-3000 Instrument Architecture Antonin Bouchez PALM-3000 Requirements Review November 12, 2007.
PALM-3000 PALM-3000 Status A.H. Bouchez, J.E. Roberts Project 1640 Las Vegas Summit 1/28/2010.
PALM-3000 Instruments update A. Bouchez Team Meeting #9 22 Oct
Manosque, 25 February 2003 University of Durham Astronomical Instrumentation Group IFU Progress Meeting 2 Slit/Pupil Mirror Development NGST IFU Prototype.
PALM-3000 High-order Wavefront Sensor Update Christoph Baranec Team Meeting #9 10/22/2008.
SWIFT Team University of Oxford 12 th November 2007O-SWIFT Progress Report Fraser Clarke.
PALM-3000 Team Meeting #15 – Wavefront Sensor(s) C. Baranec October 29 th 2009.
PALM-3000 Instrument commissioning schedule Antonin Bouchez Team Meeting #7 27 February, 2008.
PalSpec Status Review1 PalSpec Status Review WITH NOTES RE KECK APPLICATION Terry Herter, Chuck Henderson (Cornell) John Wilson, Mike Skrutskie.
PALM-3000 PALM3000 Realignment Winter Jenny Roberts Optical Bench Team: C. Baranec, A. Bouchez, K. Bui, R. Burruss, R. Dekany, M. Troy Layout.
MMT Magellan Infrared Spectrograph ( MMIRS ) P.I. Brian McLeod Warren R. Brown SAO/CfA.
SDW2005, juin, Taormina The Corot Space instrument.
KMOS Instrument Science Team Review Instrument overview.
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
Berkeley workshop summary Redundancy : dual detector Field of view : 3”x6” Spectrograph length goal: < 400 mm Isostatic mount on the base plate with control.
Astronomical Instrumentation Often, astronomers use additional optics between the telescope optics and their detectors. This is called the instrumentation.
W. M. Keck Observatory Subaru Users’ Meeting
Masahiro Konishi (IoA, UTokyo), SWIMS Team S W I M S.
Dae-Sik Moon Department of Astronomy & Astrophysics University of Toronto Wide Field, High Resolution Integral-Field Near-Infrared Spectroscopy of Extended.
3rd Integral Bart Work Shop Chocerady - November 1-3, Patrizia Ferrero GRB Too observations in Loiano Patrizia Ferrero (IASF-BO, OACT & Universita’
Nov 6, 2005SSWG1 Robert Stobie Prime Focus Imaging Spectrograph Status Reassembly and retesting in Cape Town Estimated CTC $343,000 (7.3%) over PDR cap.
Presentation EddiCam consortium, FF, Madrid 13/06/2002 Eddington programmatic status Fully approved by SPC as part of ESA’s science program as project.
The Mid-Infrared Instrument (MIRI) Medium Resolution Spectrometer for JWST Martyn Wells MIRI EC & UKATC.
1 FRIDA Engineering Status 17/05/07 Engineering Status May 17, 2007 F.J. Fuentes InFraRed Imager and Dissector for Adaptive Optics.
17/18 May 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan,
Integral Field Spectrograph Eric PRIETO CNRS,INSU,France,Project Manager 11 November 2003.
DL – IFU (Prieto/Taylor) Slicer: –25mas sampling … 0.9mm slices ~f/250 (assuming no anamorphism) Detector = 2k array of 18um pixels –Slit subtends 1-pixel.
The KiDS survey. VISTA 4m telescope 0.6 sq.deg. InfraRed camera 16 2kx2k detectors 0.35” pixels VST 2.6m telescope 1 sq.deg. optical camera (OmegaCAM)
Integral Field Spectrograph Anne EALET CNRS (IN2P3) FRANCE, Instrument Scientist Eric PRIETO CNRS,INSU,France,Project Manager 11 November 2003.
イメージスライサー型可視光 面分光ユニットの開発 Development of an integral field unit (IFU) with an image slicer Shinobu Ozaki, Satoshi Miyazaki, Takuya Yamashita, Takashi Hattori,
The Prime Focus Imaging Spectrograph Design and Capabilities
Test Readiness Review 23 October 2003 CRAL - LYON.
1 Space Telescope Science Institute JWST S&OC JWST S&OC Contract Peter Stockman TIPS March 20, 2003.
PACS IHDR MPE, 12/13 Nov 2003 Overall Schedule1 Otto H. Bauer MPE Garching.
NIRSpec IFU Eric Prieto Final Presentation Definition Phase May, 11th – ESTEC.
SunSatFriThursWedTuesMon January
Science with Giant Telescopes - Jun 15-18, Instrument Concepts InstrumentFunction range (microns) ResolutionFOV GMACSOptical Multi-Object Spectrometer.
The INS NIRCam Team.
Status Report for E391a (Continuation of the previous PAC on April) G.Y.Lim IPNS, KEK Group Meeting at the JINR 26 th – 29 th July 2003 Dzhelepov Laboratory.
This is an example text TIMELINE PROJECT PLANNING DecOctSepAugJulyJuneAprilMarchFebJanMayNov 12 Months Example text Go ahead and replace it with your own.
MMIRS Status A.Szentgyorgyi/SAO 30 April Imaging 7 x 7 arcmin FOV 0.2 arcsec pixels Y,J,H & K wavelength coverage Spectroscopy Multislit (4’ x 7’)
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
1 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/04 MMIRS Status Report Brian McLeod.
RPC Electronics Link system RPC Annual Review, CERN, June 13, 2006 Maciek Kudla for Lappeenranta and Warsaw University.
Role of FOCAS Takashi Hattori (as FOCAS SA) 12/9/2014.
MMIRS 1 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/05 MMIRS Status Upate Presented by A. Szentgyorgyi P.I. B. McLeod.
IFU Management Meeting LAM – 15/10/04. Introduction (olf)
NIRSpec - the JWST Multi-Object Spectrograph P. Ferruit (ESA), S. Arribas (CSIS), S. Birkmann (ESA), T. Böker (ESA), A. Bunker (Oxford), S. Charlot (IAP),
Hobby-Eberly Telescope Dark Energy Experiment The upgraded HET.
MagIC Upgrade for High-Speed Photometry Jim Elliot, MIT Magellan SAC
Integral Field Spectrograph Opto-mechanical concepts PIERRE KARST, JEAN-LUC GIMENEZ CPPM(CNRS),FRANCE.
Slicer development Eric Prieto LAM.
The SNAP Integral Field Spectrograph Overview of the project
COSMOS Status David Sprayberry, Sean Points & Jay Elias
10/month is the present production rate 2 FTE + sporadic contributions
An IFU slicer spectrometer for SNAP
13-block rotation schedule
SLAC DOE Program Review
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Presentation transcript:

PALM Project Jan COO All-Hands Mtg. Project 1640 is an infrared, coronographic integral-field spectrograph for high-contrast companion searches. PI: Ben Oppenheimer, American Museum of Natural History Schedule Pre-Ship Review: 27 March, Arrival at Palomar: 28 April, Commissioning runs: 9-12 May and 8-10 July. Status Currently assembling instrument, testing software. Original detector failed, but have found replacement. Delay possible due to difficulty acquiring coronograph optics.

PALM-3000 Project 1640 model

PALM-3000

4 SWIFT 31 Jan COO All-Hands Mtg. SWIFT is an R-I band “AO-assisted” integral field spectrograph. PI: Niranjan Thatte, University of Oxford Schedule Pre-Ship Review: April Arrival at Palomar: 21 May, Commissioning runs: June. Status Currently manufacturing components and assembling instrument, developing CCD cryostats and readout software. Delay possible due to difficulty acquiring science-grade detectors from LBNL.

PALM-3000 SWIFT model

PALM-3000 SWIFT Image Slicer Output slit image Slicer stack Pupil mirrors Lenset array