Doc.: IEEE 802.11-12-0165r0 SubmissionBruce Kraemer, MarvellSlide 1 Smart Grid SC Closing Report– January 2012 Date: 19 January 2012 Discussion topics.

Slides:



Advertisements
Similar presentations
Doc.: IEEE r2 Submission November 2009 Bruce Kraemer, MarvellSlide 1 Wireless Characterization for NIST PAP#2 Date: Authors:
Advertisements

May SG Communications Overview Matt Gillmore 02/27/2012.
Submission May 2010 Don Sturek, PG&ESlide 1 Submission Title: [OpenSG Washington DC Opening Report] Date Submitted: [May 4th, 2010] Source: [Don Sturek]
Doc.: IEEE r0 SubmissionBruce Kraemer, MarvellSlide 1 Smart Grid SC– January 2012 Date: 18 Janaury 2012 Discussion topics during November.
Doc.: IEEE /1210r1 Submission October 2010 Bruce Kraemer, MarvellSlide 1 Smart Grid Technology Discussions 2010 Date: 2010-October-18 Abstract:
Doc.: IEEE /1514r0 Submission November 2014 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG November 2014 Closing Report Date: Authors:
Doc.: IEEE /0173r0 Submission January 2015 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG January 2015 Closing Report Date: Authors:
Doc.: IEEE r0 SubmissionSlide 1 Smart Grid SC– March 2012 Date: 15 March 2012 Discussion topics during March Waikoloa Session NameCompanyAddressPhone .
Doc.: IEEE r0 SubmissionBruce Kraemer, MarvellSlide 1 Smart Grid SC– March 2012 Date: 18 March 2012 Discussion topics during March Waikoloa.
Doc.: IEEE /1268r0 Submission September 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid SC– September 2011 Date: 22 September 2011 Discussion topics.
DOCUMENT #:GSC15-PLEN-xx FOR:Presentation SOURCE:TIA TR45.5 AGENDA ITEM:X.YY CONTACT(S): David Su Steve Whitesell.
Doc.: IEEE r1 SubmissionBruce Kraemer, MarvellSlide 1 Smart Grid SC– March 2012 Date: 18 March 2012 Discussion topics during March Waikoloa.
Summary of SGIP PAP2 Activities since April 2012 Mingxi Fan, Alex Gogic, Jing Sun TR-45.5 Liaison to SGIP PAP June 11 th,
SMART GRID INTEROPERABILITY PANEL PRIORITY ACTION PLAN 2 WIRELESS COMMUNICATIONS DEC 6, :00 AM MOUNTAIN FACE-TO-FACE PHOENIX, AZ ROOM 162 WEBINAR.
Doc.: IEEE /1542r0 Submission November 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid SC– November 2011 Date: 08 November 2011 Discussion topics.
Doc.: IEEE /1112r0 Submission August 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid ad hoc – August 2011 Date: 10 August 2011 Discussions during.
Doc.: IEEE /0955r0 Submission July 2010 Bruce Kraemer, MarvellSlide 1 Smart Grid Technology Summer 2010 Plans Date: 2010-July-28 Abstract: Discussion.
Doc.: IEEE /0955r2 Submission August 2010 Bruce Kraemer, MarvellSlide 1 Smart Grid Technology Summer 2010 Plans Date: 2010-August-11 Abstract:
Doc.: IEEE /1180r2 Submission October 2010 Bruce Kraemer, MarvellSlide 1 Smart Grid Activity Report 2010 Date: 2010-October-13 Abstract: Discussion.
Doc.: IEEE /1340r0 Submission September 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid SC–Closing Report- September 2011 Date: 22 September 2011.
Doc.: IEEE /0720r1 Submission Doc.: IEEE /720r0 May 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid ad hoc – May 2011 Date: 09 May 2011.
Doc.: IEEE /0028r1 Submission January 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid Update – January 2011 Date: 2011-January-10 Abstract: NIST.
Doc.: IEEE /0174r0 Submission January 2010 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
Doc.: IEEE /0203r1 Submission March 2012 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
Doc.: IEEE /1112r2 Submission August 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid ad hoc – August 2011 Date: 17 August 2011 Discussions during.
Submission February 2010 Don Sturek, PG&ESlide 1 Submission Title: [OpenSG San Francisco Opening Report] Date Submitted: [February 1st, 2010] Source: [Don.
Summary of SGIP PAP Activities since October 2011 Mingxi Fan, Jing Sun TR-45.5 Liaison to SGIP PAP April 16 th, 2012.
Summary of SGIP PAP Activities since October 2011 Mingxi Fan TR-45.5 Liaison to SGIP PAP December 5 th, 2011 ©2011.
Doc.: IEEE /0210r2 Submission February 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid Teleconferences – Jan-Mar 2011 Date: 2 February 2011 Abstract:
Doc.: IEEE /0506r2 Submission Doc.: IEEE /720r0 May 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid ad hoc – May 2011 Date: 09 May 2011.
Doc.: IEEE /1304r0 Submission January 2010 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
Doc.: IEEE /0775r0 Submission July 2009 Bruce Kraemer, MarvellSlide 1 TGn Closing Report - July 16 ‘09 Date: 2009-July-09 Authors: 5488 Marvell.
Doc.: IEEE /0420r0 Submission March 2008 Bruce Kraemer, MarvellSlide Marvell Lane, Santa Clara, CA, TGn Closing Report Orlando, FL,
Doc.: IEEE /0393r1 Submission March 2008 Eldad Perahia (Intel)Slide 1 Orlando Liaison Report Date: Authors:
Doc.: IEEE /0203r0 Submission March 2012 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
Doc.: IEEE /0186r3 Submission March 2010 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
Doc.: IEEE /1180r0 Submission September 2010 Bruce Kraemer, MarvellSlide 1 Smart Grid Closing Report 2010 Date: 2010-September-13 Abstract: Discussion.
Doc.: IEEE /1597r0 SubmissionBruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company Address Phone.
Doc.: IEEE /0982r1 SubmissionBruce Kraemer, MarvellSlide 1 WG11 Plenary - Supplementary Information - September 2012 Date: Authors:
May 2010 Slide 1 SG Communications Boot Camp Matt Gillmore 11/1/2010.
Doc.: IEEE /1180r1 Submission October 2010 Bruce Kraemer, MarvellSlide 1 Smart Grid Activity Report 2010 Date: 2010-October-06 Abstract: Discussion.
Doc.: IEEE /0943r3 Submission September 2010 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
Summary of SGIP PAP2 Activities Update as of August 2012 Alex Gogic, Mingxi Fan, Jing Sun TR-45.5 Liaison to SGIP PAP
DOCUMENT #:GSC15-PLEN-xx FOR:Presentation SOURCE:TIA TR45.5 AGENDA ITEM:X.YY CONTACT(S): Smart Grid Standardization Activities TIA TR-45.5 Input Smart.
Smart Grid ad hoc – August 2011
2018/7/ /7/29 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4i May 2011 Closing report Date.
RR-TAG (802.18) Liaison Report
Smart Grid ad hoc Meeting Information - January 2010
Smart Grid SC– May 2012 NIST PAP2 activities of interest to 802 Name
Smart Grid ad hoc Meeting Information - January 2010
IMT-Advanced Opening Report
Wireless Characterization for NIST PAP#2
Smart Grid SC– January – NIST PAP2 Name Company Address Phone
Smart Grid ad hoc Closing Report – May 2011
Smart Grid Closing Report – November 2010
Smart Grid Teleconferences – Jan-Mar 2011
Supplementary Plenary Information - September 2010
Wireless Characterization for NIST PAP#2
Smart Grid ad hoc Closing Report - March 2010
Smart Grid SC–Closing Report- September 2011
Smart Grid ad hoc Closing Report - May 2010
Smart Grid ad hoc – July – SGIP 2 - NIST PAP2 3- ITU Liaison
doc.: IEEE <doc#>
Smart Grid Update – January 2011
Supplementary Plenary Information - March 2010
TGn Draft Redline Notice
Smart Grid ad hoc Closing Report – January 2011
Smart Grid Closing Report – November 2010
Smart Grid ad hoc-Closing Report - July 2010
Task Group AY May 2016 Closing Report
Presentation transcript:

doc.: IEEE r0 SubmissionBruce Kraemer, MarvellSlide 1 Smart Grid SC Closing Report– January 2012 Date: 19 January 2012 Discussion topics during January Session NameCompanyAddressPhone Bruce KraemerMarvell5488 Marvell Lane, Santa Clara, CA, Thursday Abstract: 1 – NIST PAP2 Janaury 2012

doc.: IEEE r0 Submission Jacksonville Agenda Reviewed Progress toward revising Guidelines for Assessing Wireless Standards for Smart Grid Applications –NISTIR 7761: NIST Priority Action Plan 2NISTIR 7761 Bruce Kraemer, MarvellSlide 2 Janaury 2012 AttributeStandard Information Identifier of the standardNIST IR 7761 Title of the standardGuidelines for Assessing Wireless Standards for Smart Grid Applications Name of owner organizationNIST Latest versions, stages, dates1 URL(s) for the standardhttp://collaborate.nist.gov/twiki- sggrid/pub/SmartGrid/PAP02Objective3/NIST_PAP2_Guidelines_for_A ssessing_Wireless_Standards_for_Smart_Grid_Applications_1.0.pdf

doc.: IEEE r0 Submission Major 802 Support Elements in SGIP Bruce Kraemer, MarvellSlide 3 NIST SGIP PAP#2 OpenSG SDOs Smart Grid Strategy Program management Document Publication Utility Requirements Technology Capabilities January 2012

doc.: IEEE r0 Submission Guideline Sections Sect 2 Acronyms and Definitions Sect 3 SG Conceptual Model & Business Requirements Sect 4 Wireless Technology Sect 5 Modeling & Evaluation Approach Sect 6 Factors to Consider Sect 7 Conclusions Sect 8 References Sect 9 Bibliography Annex (e.g. A, B, C, D, E) Bruce Kraemer, MarvellSlide 4 January 2012 Re-write focus

doc.: IEEE r0 Submission Annexes ANNEX A IEEE ANNEX B 3GPP LONG TERM EVOLUTION (LTE) ANNEX C 3GPP HIGH SPEED PACKET ACCESS (HSPA) ANNEX D CDMA2000 1X AND HIGH RATE PACKET DATA (HRPD) ANNEX E IEEE /WIMAX NETWORK January 2012 Slide 5Bruce Kraemer, MarvellSlide 5

doc.: IEEE r0 Submission SDO Sub group SDO Sub-group Purpose: Sub-group open to anyone with technical knowledge interested in contributing to clarifying SDO terms and generating estimates for covered equipment When: Occurs every Monday from 9:00 AM to 10:30 AM (UTC-08:00) Pacific Time (US & Canada). Conference Bridge: Conference ID: Passcode: 0681 Bruce Kraemer, MarvellSlide 6 January 2012

doc.: IEEE r0 Submission doc.: IEEE r0 Bruce Kraemer, MarvellSlide 7 G-NET%20PAP%20work-in-progress/Database- wip/database/SGNet-2010mod29Aug zip Latest data descriptions Actors Flows Data size Security levels Open SG Utility Data Flow information January 2012

doc.: IEEE r0 Submission doc.: IEEE r0 802 Smart Grid Teleconference Plans Bruce Kraemer, MarvellSlide 8 Calls have been scheduled at 2pm ET on Wednesdays Agreed on one call between January and March meetings Feb 08 – Telecon to discuss recommended parameters from 11ah and 15.4g to use in the propagation model January 2012