The Quality Improvement Model

Slides:



Advertisements
Similar presentations
Chapter 2. Customer service The group of utilities or benefits the customer expects from the supplier.
Advertisements

Presentation Prepared For:. Secure user Login provides access to specific ship-to addresses, customer catalog, order processing rules, and other account-based.
METODOLOGI SIX SIGMA PERTEMUAN 5 MEASURE PHASE OLEH: EMELIA SARI.
ISO 9001:2000 Certified Next Steps? Where do we go from here?
Process Mapping. Why Flow Chart? To understand a process or system To (visually) depict all key steps in a process or system To compare existing and ‘ideal’
Flow Charts including Process Mapping
Project Bidding Procedures Enhancing Data and Presentation Skills for Engineers EDASPE Writing the RFP Training Courses – July 2004.
Supplier Development Kaizen Implementation Kit
Presented By The University of Texas-School of Public Health
Six Sigma Foundations Continuous Improvement Training
Your Catapult Team Do the following:
PRESENTED BY NASIR ABBAS. FLOW CHART CONTENTS What is a flow chart? Flow chart symbols.
11-1 Quality Improvement Model Purpose: To provide a sequence of steps to improve any process so that the customers will realize the highest quality and.
Statistical Process Control
The Quality Improvement Model
7.2 System Development Life Cycle (SDLC)
Total Quality Management BUS 3 – 142 Statistics for Variables Week of Mar 14, 2011.
The Quality Improvement Model
3-1 Select Measures Use SPC to Maintain Current Process Collect & Interpret Data Select Measures Define Process Is Process Capable ? Improve Process Capability.
Paul Prunty The 7 Basic Quality Tools ~ The DMAIC Process Continuous Improvement and … To a hammer, everything’s a nail … How many tools do you have in.
The Quality Improvement Model
ESC/EN Engineering Process Compliance Procedures August 2002.
12 Steps to Useful Software Metrics
Overview of DMAIC A Systematic Framework for Problem Solving
DATE: 28/11/2012 INSTRUCTOR: HANIF ULLAH Tutorial 7.
1. 2 What is Six Sigma? What: Data driven method of identifying and resolving variations in processes. How: Driven by close understanding of customer.
Fundamentals of ISO.
The BIM Project Execution Planning Procedure
Workshop A Performance Boosting Tools Reality Check: Are you a Lean, Mean Manufacturing Machine ? The Matrix: Performance Measurement System.
Quality in Manufacturing and Service Systems
Tools and Techniques for Performance Excellence
Six Sigma at Boston Scientific Tuesday 12 September 2006 Steve Czarniak BSC Six Sigma: ASQ Meeting – 12 September 2006.
Statistical Process Control Chapters A B C D E F G H.
Value Analysis/ Flow Analysis
Purchasing Director’s Meeting MFMP 2.0 Upgrade Status February 15, 2007.
Simple Process Mapping Techniques
Supplier Overview of Johnson & Johnson MD&D Supplier Quality Standard Operating Procedures (SOPs) Supplier Process Control.
5-1 Collect & Interpret Data Use SPC to Maintain Current Process Collect & Interpret Data Select Measures Define Process Is Process Capable ? Improve Process.
High Level Process Mapping
ENGM 620: Quality Management
Process Walk & SIPOC Define Kaizen Facilitation. Objectives Understand the process as a “system” Describe the concept of an entity and how it relates.
Practical Assessment Project Template
1-1 1 Chapter 7 Manufacturing Processes Process Flow Structures Job shop (ex. Copy center making a single copy of a student term paper) Batch shop.
ORDER ENTRY ORDER ENTRY SYSTEM O/E DAILY PROCESSING MENU ORDER ENTRY.
Project Review Questions Ops Review Project Facilitation Process Excellence.
1 Presentation Template: Instructor Comments u The following template presents a guideline for preparing a Six Sigma presentation. An effective presentation.
Flowcharting A Quality Improvement Tool. Quality = Inspection Statistical methods assisted in prevention of defects – The need for inspection declined.
First Steps in Modularization. Simple Program Design, Fourth Edition Chapter 8 2 Objectives In this chapter you will be able to: Introduce modularization.
WHY DO WE DO THIS? WHY DO WE DO THIS? WHAT WILL WE DO? WHAT WILL WE DO? WHAT WILL WE ACHIEVE? WHAT WILL WE ACHIEVE? Quality Consultants NAME OWNER AND.
2-1 Define Process The Quality Improvement Model Use SPC to Maintain Current Process Collect & Interpret Data Select Measures Define Process Is Process.
First Steps in Modularization. Simple Program Design, Fourth Edition Chapter 8 2 Objectives In this chapter you will be able to: Introduce modularization.
What is a DOE? Design of Experiment Adapted from experiments.cfm#preparation.
Sponsor: Carrier Corporation Advisor: Dr. H. El-Mounayri May 3, 2007 Design Team: Mike Abel Braden Duffin Simon Marin Joe McGuire.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Operations Management - 5 th Edition Chapter 3 Roberta Russell.
Outline An Introduction to Market Advantage Basic Information Ordering Customized Marketing Collateral Ordering Promotional and other Material Question.
COSTING AND THE VALUE CHAIN CHAPTER 18 PAGE# 794 Faisal
Section 5 Control Charts. 4 Control Chart Applications Establish state of statistical control Monitor a process and signal when it goes out of control.
Key Performance Indicators will: Provide performance measurements for all core processes. Add value for our customers and the company. Support company.
METODOLOGI SIX SIGMA PERTEMUAN 11 ANALYZE PHASE OLEH: EMELIA SARI.
“Supply Chain Management Handbook” Supplier Selection and Capability Assessment Model IAQG Leader: Christian Buck – Safran Updated: June 2008.
Practical Assessment Project Template

How to use SPC Before implementing SPC or any new quality system, the manufacturing process should be evaluated to determine the main areas of waste. Some.
SYSPRO Business Model Flows
Value Stream Mapping (VSM) Training
DMAIC STANDARD WORK TEMPLATE
Chapter 11 Quality Control.
IENG 475: Computer-Controlled Manufacturing Systems Process Planning
DMAIC STANDARD WORK TEMPLATE
Scatter Diagrams Slide 1 of 4
Presentation transcript:

The Quality Improvement Model Define Process The Quality Improvement Model Select Measures Collect & Interpret Data Define Process Is Process Stable ? Entering first step of the model This module explains this step No Investigate & Fix Special Causes Purpose: Communicate to an individual or team a clear understanding of the process under study. Establish improved and consistent process operations. Yes Is Process Capable ? No Improve Process Capability Yes Use SPC to Maintain Current Process

Process Components Processes are where the work actually gets done Suppliers Inputs Processes Outputs Customers Processes are where the work actually gets done Transforming inputs into outputs A process is any activity that converts All processes involve Suppliers, Inputs, Outputs, and Customers

Defining Processes Why Communicate to an individual or a team a clear understanding of the process under study. Standardize process operations. These are the activities involved in defining processes How Identify and list Suppliers, Inputs, Outputs, and Customers. Develop flow chart of the process steps. Assure a common understanding of related procedures. Verify practice vs. procedure.

Process Standardization STANDARDIZATION is everyone following the procedures the same way. These Procedures: Why might standardization be good? What if you have 4 operators and 1 has a new way to do something? Do you want that person to do it their own way, or do you want them to keep doing it the same way as everyone else even if they think it is better? Imai Quote - Talk about some of the operations that should and shouldn’t be standardized. Examples. Don’t want standardization to rob people of their creativity. Don’t overdo it. Have class discuss personal experience. Are not the optimum perfection. Are not necessarily the current best known methods. Are the agreed-upon methods. “It is neither possible nor necessary to standardize all the operations. However, crucial elements...should be measurable and standardized.” —Misaaki Imai KAIZEN

Process Flow Charts Purchasing Process Manufacturing Submits Purchase Order A Graphical display of the steps in a process. Purchasing Contacts Vendors for Pricing Vendor Submits Bids Discuss Quality vs. Price and Select Vendor Standard Symbols Can Vendor Meet Schedule? Process Steps No Yes Decisions Vendor Delivers Goods Manufacturing Inspects Goods Beginning or End Points, or Connectors between pages Purchasing Pays Vendor End

Process Mapping Pumping Filtration Extrusion String Up Quench Cutting Outputs Chip weight Chip viscosity Chip defects Gels Dirt Shutdown/rate

Detailed Process Maps What is the tool? Graphical illustration of the process What will the tool identify? All value-added and non-value-added process steps Input variables (X’s) Output variables (Y’s) Data collection points When do you apply process mapping? Always

Process Mapping Steps Identify the process, its external inputs and customer outputs Identify all steps in the process graphically List output variables at each step List input variables and classify process inputs as controlled or uncontrolled Add process specifications for input variables

Step 1: Identify the Process and Inputs/Outputs We need to get a 50,000 ft. view of the process first First identify the process in simple terms Secondly we identify external inputs Incoming information Raw materials Personnel Energy requirements Finally we identify the customer requirements (outputs) Identify the attributes of a correctly functioning product or service

Step 1: Examples Manufacturing Fluid Bed Dryer Non- Manufacturing Rate Temperature Air Flow Residence Time Appearance (Color ) Physical Chem Properties Cycle Time (plugging) Zone 3 Temp Inputs Outputs Order Entry Phone FAX Email Price Availability Confirmation of Order Promise Date Order number Non- Manufacturing

Step 2: Identify All Steps in the Process Include all value-added and non value-added steps Process steps, inspection/test, rework, scrap points Manufacturing Mixing Water and Metals Preparation Extrusion Extrude through die Dryer Calciner NADM Solution Preparation Impregnation Fluid Bed Dryer Final preparation / appearance issues Metals addition Material drying, surface area issues Non-Manufacturing Answer Phone Greet customer Determine parts needed Identify need date Identify ship to address Identify price Identify shipment method Internal Information Get internal P/N Determine terms Identify lead time Complete order worksheet Order Entry Input information Print order confirmation Determine ship date Review order Order Confirmation FAX confirmation to customer Verify manufacturing receipt of order

Step 3: List Key Output Variables Include both process and product output variables Manufacturing Outputs TV of Mix -Quality Check around extrusion TV of Mix - Quality Check around extrusion Surface Area Pore Volume Appearance pH Temp Specific Gravity Clarity Appearance (Color, Wetness) Appearance (Color) Physical Chemical Properties Cycle Time (plugging) Zone 3 Temp Mixing Water and Metals Preparation Extrusion Extrude through die Dryer Calciner Material drying, surface area issues NADM Solution Preparation Impregnation Metals addition Fluid Bed Dryer Final preparation / appearance issues

Step 3: List Key Output Variables Include both process and product output variables Prompt answer Live body Part number Availability Need date Customer number Order worksheet Pricing Non-Manufacturing Outputs Answer Phone Greet customer Determine P/N Identify need date Identify ship to address Identify ship method Internal Information Get internal P/N Determine terms Identify lead time Complete order worksheet Order in computer All line items complete Correct info Promise date Order number Printed confirmation Order confirmation to customer Order to production Order Entry Input information Print order confirmation Determine ship date Review order Order Confirmation FAX confirmation to customer Verify manufacturing receipt of order

Step 4: List and Classify Key Input Variables List all key input variables and classify them as Controlled inputs Uncontrolled inputs Controlled Inputs: Input variables that can be changed to see the effect on output variables Sometimes called “knob” variables Uncontrolled Inputs: Input variables that impact the output variables but are difficult or impossible to control (may also be controllable, just not under control currently) Example: Environmental variables such as humidity Critical Inputs: Input variables that have been statistically shown to have a major impact on the variability of the output variables

Process Mapping Examples Manufacturing Outputs TV of Mix -Quality Check around extrusion TV of Mix - Quality Check around extrusion Surface Area Pore Volume Appearance pH Temp Specific Gravity Clarity Appearance (Color, Wetness) Appearance (Color) Physical Chemical Properties Cycle Time (plugging) Zone 3 Temp Mixing Water and Metals Preparation Extrusion Extrude through die Dryer Calciner Material drying, surface area issues NADM Solution Preparation Impregnation Metals addition Fluid Bed Dryer Final preparation / appearance issues Total Rate C Mixer Speed C Al2O3 Qual U Rec Comp U Ext Rate C Die Wear U Ext RPMs C Die Change U Temperature C Rot speed C Draft C Feed Rate C Drying air U Inputs Types Inputs Types Nitric Acid C H2O2 C Water C ADM C Hold Time U Agitation C Phos Acid C Nozzle Type C Spray Time C Moly C Nickel C Base C Rate C Air Flow C Res Time C

Process Mapping Examples Non-Manufacturing Inputs Type Information from customer Greeting script Answering procedure Telephone system Cross reference for P/N’s Order information Plant loading information Order worksheet form Pricing algorithm C U Outputs Answer Phone Greet customer Determine P/N Identify need date Identify ship to address Identify ship method Internal Information Get internal P/N Determine terms Identify lead time Complete order worksheet Inputs Type Order worksheet Computer entry screens Lead time information from mfg Shipment method Printed confirmation sheet Production schedule Customer contact info Production contact info Confirmation procedure U C Outputs Order Entry Input information Print order confirmation Determine ship date Review order Order in computer All line items complete Correct info Promise date Order number Printed confirmation Prompt answer Live body Part number Availability Need date Order Confirmation FAX confirmation to customer Verify manufacturing receipt of order Customer number Order worksheet Pricing Order confirmation to customer Order to production

Step 5: Add Specifications for Inputs For input variables identified as Controlled and Critical Inputs, we can add the operational specifications and targets for these variables This information is the beginnings of the Control Plan!

Using Process Maps to Evaluate Processes Understand customer/supplier relationships Discover unnecessary steps Achieve agreement on process Everyone understands their role Provides inputs to Cause and Effects Matrix Provides inputs to Control Plan Summary Provides inputs to Capability Summary Excel template: Process Map Master.XLS Mostly a review slide Flow charts lead to formal procedures These procedures should then be standardized, or at least certain steps within them Don’t drive this into the ground! Move on!