Stephanie Allison Integration with the SLC Control Oct 27, 2005 1 Introduction Demo SLC-Aware IOC Plans for Next 12 Months.

Slides:



Advertisements
Similar presentations
Stephanie Allison LCLS Event System 14 June LCLS Event System Outline HW Block Diagram Timing Requirements Time Lines EVG.
Advertisements

SPEAR Upgrade – EPICS Status
Dayle Kotturi and Stephanie Allison Facility Advisory Committee Meeting April 20-21,
Stephanie Allison/John Dusatko EPICS Collaboration Meeting May 1, Timing and Event System for the LCLS Electron Accelerator*
Stephanie Allison Integration with the SLC Control April 7, 2005 Introduction PNET Receiver VME Module SLC-Aware IOC Existing.
1 ITC242 – Introduction to Data Communications Week 12 Topic 18 Chapter 19 Network Management.
Tom Himel Linac Controls Upgrade Nov SLAC National Accelerator Laboratory 1 Linac Controls Upgrade Status Tom Himel.
Ernest L. Williams Jr. Controls Commissioning October 2007 Controls Commissioning Facility Advisory Committee.
Stephanie Allison Facility Advisory Committee Meeting Apr 16, 2007 Timing and Event System S. Allison, M. Browne, B. Dalesio, J.
Hamid Shoaee High Level Physics 20 April 2006 High Level Physics Applications Update on Plans, New Directions Fairley,
LCLS Control Group FAC - Controls October 27&28, Controls Overview October 27, 2005 Outline ES&H Goals Commissioning.
Stephanie Allison LCLS Integration with SLC October 12, 2004 Integration with SLC LCLS Facility Advisory Committee Oct 12, 2004 Introduction.
Diane Fairley High Level October 24-28, 2005 High Level Physics Applications LCLS Week / FAC October 24-28, 2005.
Terri Lahey LCLS Facility Advisory Committee 20 April 2006 LCLS Network Security Terri Lahey.
Dayle Kotturi Controls April 29, 2004 Controls Overview LCLS Facility Advisory Committee April 29-30, 2004 Outline Status.
Dayle Kotturi LCLS Diagnostics and Commissioning Workshop September 23, 2004 LCLS Controls and Data Acquisition September 23, 2004.
Dayle Kotturi Controls April 29, 2004 Injector Controls LCLS Facility Advisory Committee April 29-30, 2004 Outline Description.
Debbie Rogind & Greg White High Level Applications October High Level Applications.
1 Tom Himel 1 Status of the Linac Controls Upgrade LCLS FAC review Status of the Linac Controls Upgrade Tom Himel June 8, 2009.
LCLS Control Group FAC - Controls April 7, 2005 Controls Overview April 7, 2005 Outline ES&H Goals FAC Responses.
Hamid Shoaee LCLS Facility Advisory Committee 20 April Controls Overview April 20, 2006 LCLS Controls Group Outline Goals.
V4 – Executive Summary 1.Provide online add/delete of I/O to support continuous operation. 2.Provide redundant control of remote I/O to support improved.
Dayle Kotturi Facility Advisory Committee Meeting October 12, 2004 Injector/Linac Controls An overview of the status of each of.
Dayle Kotturi SLC April 29, 2004 Outline Motivation Key Components Status Update SLC / EPICS Timing Software Tasks Hardware.
November 12, 2008 Controls Software D. Fairley LCLS Feedback.
Diane Fairley High Level October High Level Applications FAC Review October 12, 2006 High Level Applications.
Terri Lahey EPICS Collaboration Meeting June June 2006 LCLS Network & Support Planning Terri Lahey.
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
Bob Dalesio EPICS Collaboration Meeting Tokai December 8-10, 2004 LCLS Control System Status EPICS Collaboration Meeting December.
Pohang Accelerator Laboratory POSTECH EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN The status of PLS EPICS application EPICS collaboration.
LCLS Timing Software and Plan 1 Controls Timing Workshop EPICS Collaboration Meeting SLAC LCLS Timing Software and Plan April Kukhee Kim.
Ethernet Based Embedded IOC for FEL Control Systems J. Yan, D. Sexton, Al Grippo, W. Moore, and K. Jordan ICALEPCS 2007 October 19, 2007 Knoxville Convention.
Dayle Kotturi Lehman Review May 10-12, 2005 LCLS Timing Outline Scope SLC Master Pattern Generator Introducing the PNET VME receiver.
EPICS Collaboration Meeting Fall PAL October 22 ~ 26, 2012 LCLS-I/LCLS-II Timing System Low Level Kukhee Kim for LCLS Timing Team ICD Software,
ATF Control System and Interface to sub-systems Nobuhiro Terunuma, KEK 21/Nov/2007.
K. Luchini LCLS Controls, July 1, 2005 SLAC Aware IOC EPICS Magnet Functional Requirements Introduction Magnet Functions.
K. Luchini LCLS Week, October 26, 2005 Magnet Controls K. Luchini Overview Hardware Software SLC Aware IOC Database Modeling.
FECC/SAIOC/RTEMS Making Lemonade. FECC “Slow” Code (in PC) –Ported iRMX code –By Bob Sass and Tony –As little hand work as possible –EPICS OSI layer –Dual.
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
LCLS Control Group EPICS Collaboration April 27, 2005 Controls Overview April 27, 2005 Outline Goals Status update.
Stephanie Allison LCLS Controls Software Meeting Dec 6, 2007 How To Set Up for the Event System on an IOC with an EVR(s) Assumes.
The recent history and current state of the linac control system Tom Himel Dec 1,
Stephanie Allison SLC-Aware April 5, 2005 Introduction Description Issues Progress Plans for 2005 SLC-Aware IOC LCLS Collaboration,
Connecting LabVIEW to EPICS network
Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg May 21-23, SLAC EPICS Projects Yesteryear, Today, and Tomorrow.
LCLS Control Group FAC – 06 Installation October 27/28, Plans for 2006 Installation October 27, 2005 Installation.
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
Robert C. Sass Sheng Peng LCLS Upgrade Review June IOC Requirements 1 LCLS Phase I Upgrade; IOC CAMAC Support Requirements Robert C. Sass Sheng.
Controls Test Stand Test stand proposal document review - Dayle. The activities can be prioritized according to which measurements we need to do first.
Debbie Rogind LCLS Magnet June 15, 2006 LCLS Magnet Control Challenging Design Issues “How to integrate the legacy system.
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 SLC Aware IOC BSAC* Facility Requirements Review *Beam Synchronous.
Debbie Rogind LCLS Magnet June 15, 2006 LCLS Magnet Control Challenging Design Issues Subsystem architecture, or… “How.
S. Smith LCLS Facility Advisory October 12, Beam Position Monitors Facility Advisory Committee October 12, 2006.
Fermilab Control System Jim Patrick - AD/Controls MaRIE Meeting March 9, 2016.
Stephanie Allison LCLS IOC Meeting Jul 18, 2008, Jan 21, 2011 Beam Synchronous Acquisition for IOC Engineers Definition/Requirements.
SLC-Aware IOC LCLS Collaboration Jan 26, 2005
Introduction Functional Requirements (Stephanie) SLC Executive (Diane)
ATF/ATF2 Control System
Timing and Event System S. Allison, M. Browne, B. Dalesio, J
LLRF Controls Outline Requirements External Interfaces Schedule Design
LLRF and feedback Outline Scope LLRF Requirements
LLRF and Beam-based Longitudinal Feedback Readiness
SLC-Aware IOC Review 2 Cluster Status and Test Service Feb 23, 2005
EPICS at SLAC EPICS/SLC Controls Co-existence LCLS Injector Support
LCLS Control System Design, Management & Organization August 10, 2004
Timing and Event System S. Allison, M. Browne, B. Dalesio, J
LCLS Global Controls Overview August 10, 2004
Breakout Session: Controls
Timing and Event System Status DOE Review of the LCLS Project SC5 - Controls Systems Breakout Session S. Allison, M. Browne, B. Dalesio, J. Dusatko,
High Level Physics Applications Lehman Review February 7 - 9, 2006
Presentation transcript:

Stephanie Allison Integration with the SLC Control Oct 27, Introduction Demo SLC-Aware IOC Plans for Next 12 Months SLC Apps have a separate presentation Integration with the SLC Control System LCLS Facility Advisory Committee Oct 27, 2005

Stephanie Allison Integration with the SLC Control Oct 27, SLC Alpha All High Level Apps PNet (Pulse ID / User ID) MPG SLC Net over Ethernet (Data Transfer) micro CAMAC I/O RF reference clock Xterm EPICS W/S Distributed Applications EPICS W/S Distributed Applications EPICS W/S Distributed Applications EPICS W/S Distributed Applications EPICS WS Distributed High Level Applications CA over Ethernet (EPICS Protocol) I/OC (SLC-aware) EVGEVG Micro emulator PNETPNET CAS I/OC (SLC-aware) Micro emulator Fast Feedback CA Gateway Integration with the SLC Control System

Stephanie Allison Integration with the SLC Control Oct 27,

Stephanie Allison Integration with the SLC Control Oct 27, Receive SLC messages and act on them in the same way as existing SLC micros for: BPM-Like Data Acquisition (Gated ADCs) – beam synchronous Magnet-Like Control and Readback (All Controlled Devices) Maintain its part of the VMS SLC database: Receive the entire SLC database at initialization time Receive new setpoints at any time from the Alpha Send readbacks back to the Alpha on request and periodically Send setpoint changes made by external EPICS applications to the Alpha Goal – same amount of network traffic as SLC micros SLC IOC – What It Will Do

Stephanie Allison Integration with the SLC Control Oct 27, MPS BITBUS Power Supply Control KISNET Communication Micro-to-Micro Communication via Alpha SLC-style Analog Signal Monitoring SLC-style Digital Input/Output SLC-style Error Logging (use CMLOG instead) SLC-style Klystron Interface SLC-style Video Interface SLC-style Timing Interface Direct Hardware Access (and no support for “virtual CAMAC” commands) Debugging from VMS SLC-Style Fast Feedback Interface Keep static data in the EPICS and SLC database up-to-date SLC IOC – What It Won’t Do

Stephanie Allison Integration with the SLC Control Oct 27, Endian – VMS to/from any possible EPICS platform (no 64 bit) Memory – CPUs that support SLC-aware IOC need memory Keeping the EPICS and SLC database in-sync – 2 master problem (Magnet Control) Will need to increase max # of “micros” in the SLC control system Decision to use the PEP proxy so LCLS SLC traffic will go through the PEP network and be routed to the LCLS network SLC-Aware IOC Issues

Stephanie Allison Integration with the SLC Control Oct 27, Team: LCLS Controls: Stephanie Allison, Kristi Luchini, Consultants ESD Software: Diane Farley, Debbie Rogind, Consultants Weekly meetings and working web pages Basic Services: Executive, Message, Database, CMLOG – Done except for message passing from RTEMS IOCs to CMLOG and thread priorities Async Utilities and Periodic “Micro” Health Update – Done Tested on Production Network and Proxy, RTEMS testing done Application Services: Device Control and Readback (Magnet) – Reqts and design done, implementation in progress PNET Timing Diagnostics – Removed Gated ADC Acquisition (BPM) – Done Changes to VMS Programs – not needed Record Naming Conventions – Done PNET VME Module Implementation done, testing in-progress SLC IOC Progress Since Apr 2005

Stephanie Allison Integration with the SLC Control Oct 27, Implementation: Device Control and Readback – Nov 2005 (Debbie) Finish CMLOG interface – Jan 2006 (Stephanie) Integration testing when the following are ready: With BPMs and other GADCs (Till Straumann, Doug Murray) With MPG/PNET/EVG/EVR (Dayle Kotturi) With Power Supplies (Kristi Luchini) Add router between PEP and LCLS network – Aug 2006 Ready for first beam in Injector – Nov 2006 Update specifications Some of the EPICS interface developed for the SLC-aware IOC will also be used for fast feedback SLC-aware basic services being used for another project (micro upgrade to RTEMS or Linux PCs) SLC-Aware IOC Plans for 2006