Surgical Improvement Project Rapid Process Improvement #1: Reducing Non-Operative Time in Thoracic Surgery July 19 – 22, 2005.

Slides:



Advertisements
Similar presentations
1.
Advertisements

Implementation of a Surgical Safety Check List
Building Your SUSP Team Part II
Debra Fawcett PhD, RN Manager Infection Prevention and Control
Call 6: Testing the Checklist in the Operating Room.
ORIENTATION FOR STUDENTS PATIENT SAFETY PERFORMANCE IMPROVEMENT Quality & Risk.
PROCESS MAPPING - FLOWCHARTS OVERVIEW © 2008 – Jesse Whiddon – All rights reserved.
Understanding the Current Condition
Universal Protocol for Correct Site Surgery/Procedures and Kaleida Health’s Protocols What is it? How does it apply to you? Who is responsible? When will.
OUR NSQIP JOURNEY Drilling Down NSQIP Data Nanaimo Regional General Hospital Kelli Jennison-Gustafson RN SCR CNE.
Update on Blood Product Administration and Massive Transfusion Next Slide In the Operative Setting.
Supplier Development Kaizen Implementation Kit
The Perioperative Nursing Role January 12th, 2009.
VTPBiS REGIONAL COORDINATOR MEETING: MARCH
Title: Operating Room Runner Project Background: Specimens collected in operating rooms are sent to Pathology for several reasons, frozen section (rapid.
Reducing Delays at the Appointment Mark Murray, MD, MPA Mark Murray & Associates 2209 Capitol Avenue Sacramento, CA (fax)
Using Lean Tools to Improve On-Time First Start Cases in the Operating Room Kristin Harlan, MBA, MHA, Eric Rosenhauer, MBA, MHA, Koby Clements, MBA University.
Welcome and Questions? Day 4. Component 6: Procedures for Record Keeping & Decision Making.
Lean Training Standard Work. Agenda What is it? What’s it for? How does it work? When do you use it? What’s an example?
Implementation Planning. T EAM STEPPS 05.2 Mod Page 2 Implementation Planning Objectives  Describe the steps involved in implementing TeamSTEPPS.
AFFORDABLE MULTI-FAMILY HOUSING ORGANIZATIONS CREATING A DISASTER RESPONSE STAFFING PLAN THROUGH ADOPTION OF ICS Presentation to the Learning Collaborative.
Surge Capacity Plan EMERGENCY DEPARTMENT.  Surge capacity strategies will be implemented when volume exceeds staffing and/or treatment space POLICY:
Revised for 2013 Shannon Hein RN, CPN(C).  published in the Canadian Medical Association Journal in May 2004  Found an overall incidence rate of adverse.
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited Introduction to 5C TOTAL QUALITY MANAGEMENT 5C.
Morning Briefings and Huddles
321 Genesee Street Oneida (315)
Rapid Fire Team Presentation Name of Presenter: JoAnn Pelletier-Bressette.
Talking to Your Nursing and Surgical Tech Colleagues.
Call 3: Background of Each Checklist Item. Topics Covered on the Last Webinar Review of articles that have been written about the impact of the checklist.
OPERATING ROOM DASHBOARD Virginia Chard, RN, BSN, CNOR
Call 2: Background of the WHO Surgical Safety Checklist.
Building Your SUSP Team Part I Armstrong Institute for Patient Safety and Quality.
By Vickie Kirkley, RN. Director of Materials Management/ Central Supply/ Central Sterile Job Requirements Career / Job Requirements Bachelor of Science.
Leadership Middle Tennessee Medical Center Tracey L. Pavelchik.
© The Johns Hopkins University and The Johns Hopkins Health System Corporation, 2012 Optional SUSP Tools: Briefing Audits, Morning Huddle, and Shadowing.
Using Discharge Criteria to Improve Patient Flow in the Recovery Room Team Membership: Irwin Brown, D.O. Elaine Fluder, RN, MSN Kris Sawicki, RN, BSN Bruce.
Setting Up the OR Jeff Lee MSIII. The Operating Room Where surgical operations occur Place of sterility Place of team work Prepare for many hours of standing.
PERI-OP GOVERNING COUNCIL ST. LUKE’S HOSPITAL CEDAR RAPIDS IHS Leadership Symposium April 17, 2012.
Webinar 6: Checklist Modification, Small Scale Testing, and Coaching Call.
Check-In Call. Welcome Back Where Are You? 1.What is the percentage of cases that now use the South Carolina Checklist? –< 50% –> 50% –Every team uses.
Check-In Call June 21 st, Welcome Back Today’s Topics A series of polls Common barriers Checklists for special needs Monitoring your progress How.
Lean in Healthcare Jennifer Nguyen. Learning Objectives  Lean Re-cap  Lean Strategies  Lean Tools  Lean in Healthcare  Apply Lean Strategies  Homework.
On the CUSP: STOP BSI Improving Situational Awareness by Conducting a Morning Briefing.
Communicating the value of the work and the role of caregiver is essential. A caring team works together to promote harmony and healing among themselves.
On the CUSP: STOP BSI Improving Situational Awareness by Conducting a Morning Briefing.
Unit 7.2: Work Process Flow Chart Safe Workflow Design 1Component 12/Unit #7 Health IT Workforce Curriculum Version 1.0/Fall 2010.
District Leadership Module Preview This PowerPoint provides a sample of the District Leadership Module PowerPoint. The actual Overview PowerPoint is 73.
Sr.Panchavarnam.  The theatre manager is responsible for the effective day to day running of the theatre, and maintaining high standards.  Responsibilities.
Surgeon, Surgical Team, and Surgery-Recovery System Knowledge Generation and Learning in a Hospital Nile W. Hatch Marriott School – BYU Nile W. Hatch Marriott.
Creating a Spaghetti Map for your work area. What is Spaghetti Mapping? Spaghetti Mapping is a tool which will: - – Expose inefficient layout – Identify.
Testing the Checklist in the OR & Engaging Enthusiastic Colleagues.
AORN Perioperative Efficiency Tool Kit 2016
Room Turnover Process Patient Status RN CirculatorST/RN ScrubFirst AssistantOR Assistant Wound closure begins Perform first count and notify PACU that.
1 SIP 3 Arrives at check in Patient Source (IP/PAV) Patient arrival in Pavilion PreOp PT Receptionist PreOp RN Check into HYPERSPACE Escorts Patient to.
Rapid Fire Team Presentation – Royal Terrace.
Increasing Post-Surgical Debriefing Completion Rate Quality Improvement Study Ambulatory Surgery Center.
Kate Parker, Senior House Officer in Paediatric Dentistry Foundation Program Sharing Good Practice Event 11/6/14 Improving the efficiency of dental general.
Pain Control in the Laboring Patient Dr John Gianopoulos MD Dr Ku-mie Kim MD Sandra Swanson RN MSOD Maureen Davey RNC Denise Goray RN BSN.
 Patient wait times too long  Increased patient anxiety  Stress response in the patient causes physiological rise of catecholamines (increase blood.
Final Presentation Presented By: IOE 481 Team #3
Operating Room Nursing
Implementation of a Surgical Safety Check List
Pre-Induction Time Out
Final Report: Analysis of Room Turnover Processes for EP and Cath Labs
Medicare Comprehensive Care for Joint Replacement (CJR)
Quality Assurance Ten Step Studies
ROLES AND RESPONSIBILITIES OF HEALTH CARE TEAM
SCRUBBING & CIRCULATING
INTRODUCTION TO THE OPERATING DEPARTMENT “THE PERIOPERATIVE NURSING”
NICU and OR Handoff Starting 2/25/19.
Presentation transcript:

Surgical Improvement Project Rapid Process Improvement #1: Reducing Non-Operative Time in Thoracic Surgery July 19 – 22, 2005

Why a Rapid Process Improvement (RPI)? An approach for bringing a team with profound knowledge together to learn tools & techniques to: Search for and eliminate waste Reduce time throughout the entire turnover process Reduce cost Apply the improvements in the workplace during the week, refine and sustain them

RPI #1 Charter / Expectations Reduce non-operative time by 30% Implement standard work & work balance Staff engagement in the turnover process

RPI Team Members Surgeon: Doug Wood Anesthesiologist: Andy Bowdle Scrub Nurse: Sara Myer Circulating Nurse: Heidi Copeland Anesthesiologist Tech: Greyson Hackett Hospital Assistant: Kim Wambolt Ortho RN: Karen Ingram

Current State: Summary Chart Number of Steps66 Total Process Time 1:30 - All cases 2:00 - Big cases Distance Traveled12,626 = 2.4 miles

Process Flow - Before

Process Map - Before

Work Balance: HA Anesth Tech AnesthSurgeonScrub RNCirc RN

Wastes Physical layout poorly planned Anesthesia does not “meet” patient until previous case completed Waiting for resident prior to induction Waiting for attending surgeon Search for equipment & patient data Time hooking up patient –Patient on bed  induction

Wastes Patient records not available Patient x-rays not available Waiting for surgeon to clarify plan “Which bed?” “Has bed been done?” –Lack of communication 2 HA’s emptying linen/trash 2 HA’s wiping equipment - duplication Too much time (9 minutes) finding extras

Wastes Set up esophagoscope (3 times) Opening (5) Set-up (5) Set-up Sterile (10) Anesthesia tech made 7 trips in and out of Room 12, multiple trips to washroom and cleaning room Transport from ICU –who is required to do? –external, prep Circulating RN made several trips looking for equipment

Wastes Placing Epidural block between cases Searching for equipment (cuff) – 3 minutes Assessing which lines are which Searching for information –Patient record –Allergies, etc

Opportunities Overlap intro with patient to previous case Lines finished before previous case completed Induction prior to end of previous case 12 minutes between dressing and call for HA’s 3 minute travel time Set up during previous case –Collect extras –Open –Organize Restocking and communication could take place while patient wakes

Opportunities Extubation can take 20 minutes –Develop standards –Change practice Standard sequence of attaching patient to monitors Use of Visual Systems –Patient status –Spaghetti of lines –Patient info –Etc. Home for chart, all forms HA part of team through “whole” process

Vision Statements Decrease Process Steps 20% Decrease Time 30% Decrease Distance Standardize Turnovers Improve Work Balance 20% Reduce Handoffs, Increase Communication Apply Visual Systems “Plan for the Day”

Projects completed Non-operative time tasks balanced across functions (4 trial runs) Developed standard procedures (11) Anesthesia costruc installed in induction room Improved room layout - design –Surgeon / RN workstation –“ready condition” –Monitor cables

Process Map - New

Projects / Procedures / Standards Description CompletedOwnerLocation Turnover Process Map YHeidiRoom 12 Sending for Patients YHeidi / DougRoom 12 Surgeon communicate when leaving OR Existing Policy Surgeon present day of surgery Existing Policy RN to RN Hand-off YSaraRoom 12 Drug Pick-up Julie Transfer of ICU Patients – Not done by Anesth YMary Claire HA cleaning checklist & definition list YKimCloset Door Plan for Day Template YDougRoom 12 Scrub leaving room exceptions Anesth Protocols YYYY Doug Andy Room 12 Room 12 – Book

HA Standard Procedures

OR Team: Standard Procedures

Anesthesiologist Protocols

“Room Ready” Condition

Chart Holder on Stretcher

Anesthesia Costruc in Induction Room

Summary Chart Number of Steps Current 66 After 10 (External) 47 (Internal) % Change 15% Total Process Time 1:30 (All cases) Trial 1 – 50 (0 delay) Trial 2 – 63 (30 delay) Trial 3 – 55 (25 delay) Trial 4 – 58 (28 delay) 50% achievable Distance 12,626 = 2.4 miles 1.3 miles46%

Process Map – After (46% improvement)

Work Balance: HA Anesth Tech AnesthSurgeonScrub RNCirc RN Original work balance eff: 55% New work balance eff: 69%

Follow-up Action Items Complete 5S activities in Room 12 –Tape floor for “room ready” position of equipment –Install surgeon workstation installed –Monitor cables retraction system –Mount standard procedures –Install printer (in core between 11 & 12) –Trial chart holder on stretcher “On-deck” ICU bed – location marked and bed assigned

Follow-up Action Items Improve lunch coverage of HA’s and AT’s New facilitator nurse assignments Anesthesia coverage in pre-op area Understand / correct issues with pre-op not being open after 5:00 Train staff on new procedures – audit to ensure they are being followed Address “disincentives” for having improved room turns

Communication Plan AudienceKey MessageFrequencyWho Delivers Anesthesia Anesthesia Techs New Protocol for 1) Rapid Turnover 2) Epidural Block Tues – Card Div Mtg Anesth Dept Mtg Andy Allen Anesth Tech Anesth Tech + Pre- Op RN’s 1) All above & 2) Costruc change 3) Mark strap policy 4) Datex Cuff Stock Weekly MtgGreyson Thoracic RN’s All OR RN’s HA’s/OR RN’s 1) Scrub RN Liberation for next case prep 2) Process Map Change in Circ RN report to PACU 3) RN prompts for HA cleaning / calling HA’s earlier Team Mtg & OR MtgSara / Heidi

Communication Plan continued… AudienceKey MessageFrequencyWho Delivers OR RN’s/Thoracic RN’s Thoracic Surgeons Thoracic Residents Anesthiologists Plan for the DayMonthly Staff MtgHeidi / Sara Doug Andy Thoracic RN’s OR RN’s Sending for next patient prompts Monthly Team Mtg.Heidi / Sara All HA’s Pre-Op RN’s All HA’s Guidelines for picking up patients Cleaning List & Definitions Wed HA Mtg. Kim

Measures / Audit Plan Metric / AttributeStatusOwnerFreqTarget Non-Op time Thoracic cases YellowJasonWeekly45 Min Pt w/ epidural & lines prior to end of previous case RedAlanEach Case & Weekly “0” Minutes added to turnover Patient AvailableRedSherri & JudyEach case & Weekly Pt. available when sent for – 100% Plan of the dayRedDougEach Day100% Anesth protocols followed – Emergence - Induction RedAndyEach case & Weekly 100% Pt in Pre-Op holding within 20 min & ready for anesth RedShelleyEach case & Weekly 100% Team awareness of roles & following roles YellowSara / HeidiWeekly MtgCompliance

Q&A???