Wabash Pedestrian Bridge Design For Riverfront Development Committee INC. and The City of Terre Haute.

Slides:



Advertisements
Similar presentations
Gordons Corner Road Over US Route 9 Mahesh Patel, P.E. George Afful, P.E. Gregory Bitsko, P.E.
Advertisements

ODOT Structure Project Manager Training
Chapter-2 Parts of Steel Bridge.
BRIDGE CONSTRUCTION INSPECTOR Practice Questions Next.
Chp12- Footings.
Reinforced Concrete Design-8
Bridge Engineering (6) Superstructure – Concrete Bridges
By : Prof.Dr.\Nabil Mahmoud
SEMINAR IN ADVANCED STRUCTURE analysis and design of box culvert
Reinforced Concrete QTO Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
Reinforced Concrete Design
Chapter 34 Bridge Construction.
Abstract This project is a structural analysis and design of a residential building located in JENIEN City, The building is consisted of 7 floors. The.
Chp.12 Cont. – Examples to design Footings
Two-Span LRFD Design Example
Bridge Engineering (7) Superstructure – Reinforced Concrete Bridges
Design of Tension Members
Reconstruction of the Eads Bridge Highway Deck
Design of Tension Members
Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.
UNIT-I STANDARD SPECIFICATION FOR ROAD BRIDGE
Bridge 2153 Final Report Premier Engineering Rose-Hulman Institute of Technology.
Larrison Pavilion Deming Park Terre Haute, Indiana.
Highways 5/16/99 Intersection Realignment. Project Team Lindsey Thomann- Project Manager Jessica Young- Project Engineer Erik Dolmseth- Project Engineer/Client.
Project Manager: Tim Brown Project Editor: Tabatha Doughty Project Engineer: Drew Furry Project Engineer: Jim Walter.
Crane Bridge Design STJ Engineering Matt Albert AJ Chandler Noah Fehrenbacher Jake Gennicks Jake Wilhoit Rose-Hulman Institute of Technology.
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
Damage Illustrations. Potential Bridge Damage Bridge Component / DamagePossible Cause Approach Slab or Pavement  Raised, lowered, cracked, or buckled.
EXAMPLE 9.2 – Part IV PCI Bridge Design Manual
EXAMPLE 9.2 – Part I PCI Bridge Design Manual
Footings.
Composite Beams and Columns
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
There are many types of bridges including:
EDMUND FINLEY TRISHA LOWE NICK MENCHEL ANNA SLEETER BOLIVIA BRIDGE: FINAL DESIGN.
Jake Neal and Jay K.  OFFICIAL NAME: Smithfield Street Bridge OTHER DESIGNATION: LOCATION: Pittsburgh USGS 7.5" Topo Quad - UTM Coordinates: Pittsburgh.
Reading Structural Drawings
Hershey Research Park Building One Jonathan Krepps Structural Option Senior Thesis 2013 Faculty Advisor: Dr. Hanagan.
St. Croix River Crossing S.P Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction.
Southeast View of IRMC West View of IRMC. Presentation Outline Introduction Existing Structure Thesis Goals Structural Depth Lighting Breadth Conclusion.
+ Sill and Floor Construction Vocabulary. + Anchor Bolt A threaded rod inserted in masonry construction to anchor the sill plate to the foundation.
300 North La Salle Liam McNamara BAE / MAE Senior Thesis April 13 th, 2010.
C. C. Fu, Ph.D., P.E. The BEST Center
Day 20 PRECAST AND PRE-STRESSED CONCRETE Pre Cast concrete comprise units that are made under controlled conditions, with necessary preparations for.
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
Jake Neal and Jay K.  OFFICIAL NAME: Smithfield Street Bridge LOCATION: Pittsburgh.
FRAMING SEMINARS 2012 PRESENTED BY KW ENGINEERING 1.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
Justin Purcell Structural Option Advisor: Dr. Hanagan.
Composite Construction
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
James C. Renick School of Education PSU AE Senior Thesis 2006 Mick Leso - Structural North Carolina A&T State University - Greensboro.
Bridge Engineering (2) Bridge Forms 1. *Introduction 1.1 Beam bridges (Dongming YR Brdg)Dongming YR Brdg 1.2 Arch BridgesArch Bridges 1.3 Cable-supported.
. Client: City of Pittsburgh, Brighton Heights Community Objectives : Develop a pedestrian/bicycle bridge reconnecting Brighton Heights to Riverview park.
A Paper from the Transportation Research Record
BRIDGES CAD 449. Design It is the essence of engineering! “… the process of devising a system, component or process to meet desired needs. It is a decision-making.
Chapter-2 Parts of Steel Bridge. contents Bearings Horizontal and transversal wind bracing Classification of bridges.
TOTAL BRIDGE REPLACEMENT OF M-13 OVER CHEBOYGANING CREEK
High Bridge Re-Deck Project
Advisor: Dr. Bilal El Ariss
Engineering Terms Bridge Unit.
By : Prof.Dr.\Nabil Mahmoud
Advisor: Professor M. Kevin Parfitt
Reinforced Concrete Design. Compressive Strength of Concrete f cr is the average cylinder strength f’ c compressive strength for design f’ c ~2500 psi.
By T.G.N.C.VAMSI KRISHNA. 171FB M.tech – Civil.
Arch205 Materials and building construction 1 foundation
Arch205 building construction foundation
Course Contents Culverts Bridges Buildings 20 November 2018.
Mitre III Building McLean VA Debra Schroeder Structural Option.
ACEC Designer Training
Presentation transcript:

Wabash Pedestrian Bridge Design For Riverfront Development Committee INC. and The City of Terre Haute

Wabash Pedestrian Bridge Design Overview Project Description Design Requirements Project Approach Summary / Conclusions

Wabash Pedestrian Bridge Design Project Description Help jump start the “take back the river” initiative Trail & wetlands past projects The big picture for Terre Haute

Wabash Pedestrian Bridge Design Project Description Extend the National Road Heritage Trail Host of the Division I National Cross-Country Finals Become the “running capital” of America

Wabash Pedestrian Bridge Design Distinguish Indiana’s statewide trail system Four bridge design options Accommodate simultaneous pedestrian and bicycle use Wastewater collection line Design Requirements

Wabash Pedestrian Bridge Design US HWY 40 Bridge Site Crossing St. Mary of the Woods College I-70 Fairbanks Park Hulman Street Dresser Community

Wabash Pedestrian Bridge Design Site Location Fairbanks Park Site –Best of 4 total locations –Total bridge length ~890 feet –Highly visible –Topography lends itself well –Does not interfere with Dresser community

Wabash Pedestrian Bridge Design Bridge Design Options Historic Bridge Relocation – INDOT Prefabricated Bridge US 40 Replica Bridge Signature Structure

Wabash Pedestrian Bridge Design Construction Cost - Materials, erection, funding Aesthetics - Visibility - Geometry - Transparency Breakdown of Assessment

Wabash Pedestrian Bridge Design Bridge Design Selection Determined using a decision matrix Bridge Option Prefabricated US 40 Replica Aesthetics Construction Average Weighted (60%) Costs (40%) Rating Signature Structure

Wabash Pedestrian Bridge Design Signature Structure Double Thrust Arch

Wabash Pedestrian Bridge Design Arch Design Height = 130 feet Length = 630 feet between ends Width = 20 feet at deck connections Cables evenly spaced every 15 feet

Wabash Pedestrian Bridge Design

Nine Loading Scenarios 1 Dead Load 2 Pedestrian Load (Uniform and Patch) 2 Ambulance Load (Mid-span and Abutment) 1 Wastewater Collection System 3 Wind (Longitudinal, Transverse, Uplift) Arch Design

Wabash Pedestrian Bridge Design Arch Design 3 Separate members designed utilizing: MASTAN2 Structural Analysis Software AASHTO Guide Specifications for Design of Pedestrian Bridges AASHTO Standard Specifications for Design of Highway Bridges AISC Steel Construction Manual

Wabash Pedestrian Bridge Design Superstructure Design Steel Girder

Wabash Pedestrian Bridge Design Superstructure Design Steel girder design for approach and center spans Concrete slab design AISC Steel Construction Manual, ACI Code, AASHTO Standard Specifications for Highway Bridges, AASHTO Guide Specifications for Design of Pedestrian Bridges

Wabash Pedestrian Bridge Design Superstructure Design Thickness Web = 0.3 in Thickness Bottom Flange = 0.25 in Longitudinal 4 ft from centerline 1 ft. from centerline. Thickness Top Flange = 0.75 in Transverse 3 ft Depth = 3 ft Width Bottom Flange = 15 ft Built up section using A36 steel plates Width Top Flange = 17 ft Center Span Girder Thickness Web = 1 in Longitudinal 4 ft from centerline. Thickness Bottom Flange 0.5 in Thickness Top Flange = 0.75 in Transverse 4 ft Depth = 3 ft Width Bottom Flange = 15 in Built up section using A36 steel plates Width Top Flange = 17 ft Approach Girder Other CharacteristicsMember DimensionsElement

Wabash Pedestrian Bridge Design Superstructure Design 2.5 in. clear coverClear Cover No in. on center spacing running longitudinally Temperature and Shrinkage No. 5 9 in. on center in both Positive and negative regions running transversely Flexural Reinforcement Thickness = 8 in.Concrete Element CharacteristicElement Slab Cross - Section Reinforced Concrete Slab

Wabash Pedestrian Bridge Design Subsurface Investigation Soils: East Bank = Sandy Glacial Outwash West Bank = Loamy Alluvium Bedrock: Carbondale Group ~110 feet below ground surface

Wabash Pedestrian Bridge Design Foundation Design Challenges: Uncertain Soil Properties Both Lateral and Vertical Loading –Broms Method (Lateral) –Tip & Side Friction Methods (Axial) Five Separate Designs –East & West Abutments –East & West Arch Foundations –West Pier

Wabash Pedestrian Bridge Design West Bank

Wabash Pedestrian Bridge Design East Bank

Wabash Pedestrian Bridge Design Arch Foundation Design 228 k 160 k 263 k Plan View Side Elevation

Wabash Pedestrian Bridge Design Pier Design 25.0 k/ft Side Elevation Plan View

Wabash Pedestrian Bridge Design Abutment Design Plan View Side Elevation ω West Bank: ω = 17.1 k/ft East Bank: ω = 16.3 k/ft

Wabash Pedestrian Bridge Design Foundation Summary Location East Bank Arch West Bank Arch West Bank Pier East Bank Abutment West Bank Abutment Vertical Load (kip) Lateral Load (kip) Footing Size (L x W x D) 11' x 11' x 2'23' x 23' x 2'15' x 12' x 2'15' x 12' x 10"15' x 10' x 2' Stem Size (L x W x T) -- 15' x 12' x 10"15' x 12.5' x 10"15' x 5.5' x 10" No. of Piles Pile sizePP14x0.625PP24x0.500 PP16x0.250PP30x0.500 Pile Depth (ft)

Hydraulic Study Modeled using HEC-RAS Modeled with and without the proposed bridge Used 2 downstream cross sections and 7 upstream cross sections Proposed Bridge Cross Section #1 Cross Section #2 Cross Section #3 Cross Section #4 Cross Section #5 Cross Section #6 Cross Section #7 Cross Section #8

Wabash Pedestrian Bridge Design Hydraulic Study Modeled with bridge deck above floodplain Arch piers modeled as vertical piers for simplicity Cross Section #2

Wabash Pedestrian Bridge Design Hydraulic Study W.S. elevation change less than 0.14 ft required by IDNR Greatest change in elevation is 0.06 ft 0.06

Wabash Pedestrian Bridge Design Cost Estimate Prices for steel plates from: Discount Steel, Inc Prices for steel cable from: Southwest Wire Rope Subtotal = $1,835,000

Wabash Pedestrian Bridge Design Cost Estimate Prices for steel plates from: Discount Steel, Inc. Prices for concrete and rebar from: RS Means, Building Construction Cost Data Subtotal = $1,912,000

Wabash Pedestrian Bridge Design Cost Estimate All prices taken from: RS Means, Building Construction Cost Data Subtotal = $175,000

Wabash Pedestrian Bridge Design Cost Estimate Includes Material cost Labor cost Equipment costs Overhead & Profit Total Cost + Design Fees = $4,511,000

Wabash Pedestrian Bridge Design Conclusions Project Background Site Location Design Options and Assessment Subsurface Investigation Foundation Design Bridge Deck Design Bridge Arch Design Hydraulic Study Cost Estimate

Wabash Pedestrian Bridge Design Questions?