K. Long, 27 June, 2015  Target K. Long, Monday, 06 July 2009.

Slides:



Advertisements
Similar presentations
Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
Advertisements

IBL Vacuum Box in UX15 Short summary Andrzej Zmuda
State Data Center Re-scoped Projects With emphasis on reducing load on cooling systems in OB2 April 4, 2012.
MICE Target Shaft Joint Change l MICE Target Ti shaft »Baseline stock material = drawn tube lower joined to solid upper (rather than manufacture from solid)
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Fermilab E906 Schedule Paul E. Reimer 20 June 2008.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
State Data Center Re-scoped Projects With emphasis on reducing load on cooling systems in OB2 April 4, 2012.
MICE Target Report Chris Booth (for target team) Sheffield 7 th May 2009.
MICE VC 15/3/07Chris Nelson MICE Hall. Issues Realistically, I would expect D2 drawings to go for tender by end next week 23/3 but I hope we can use same.
Special Report NuMI Target Updates Special Report NuMI Target Updates Status Update I.Target Hall Target module ready to accept new target General target.
K. Long, 13 June, 2015  Target K. Long, Friday, 24 th April 2009.
K. Long, 14 June, 2015  Target K. Long, Friday, 24 th April 2009.
Spreadsheets in Finance and Forecasting Project Session 3a The Next Step: Planning Your Visits.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
1 Implications Of Infrastructure Build The Infrastructure Project is bigger than anyone thought, but now it’s understood The cost was underestimated, but.
K. Long, 13 July, 2015  Target K. Long, Monday, 06 July 2009.
DH in Hybrid-A and ILD 2014/9/5 Yasuhiro Sugimoto 1.
SQXF Shell & Yoke Assembly Procedure
Reseller Training Miscellaneous Revision Manager Revision Manager Weldments Weldments Tubing Tubing Sensors Sensors Simply Motion Simply Motion Engineering.
MICE Target Mechanical Design l Contents »Status of modelling and drawing »Work being undertaken at RAL on shaft and bearing prototypes »Procedure for.
Office of Science Coupling Coil Status S. Gourlay August 1, 2012.
Engineering Department ENEN Status of TCSP manufacturing Collimation Working Group (CWG) 24 June 2013 A. Dallocchio, A. Bertarelli, F. Carra, L. Gentini,
Vertical Test Stand in IB1 C.M. Ginsburg (Fermilab) for the IB1 VTS Group SRF R&D Meeting 6.July 2006.
Accelerator and NuMI Upgrades Shutdown Update Cons Gattuso July 02, 2012 July 2, 2012 Cons Gattuso1.
Discussion points TBM meeting 23/09/2015. Updates Global 3D assembly updated, no severe problems/clashes T1 RF network dimensions updated WPS arms machined.
Compressor status AWAKE Technical Board meeting 19 August 2015.
STEP 4 Manage Delivery. Role of Project Manager At this stage, you as a project manager should clearly understand why you are doing this project. Also.
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
MICE Target Mechanical Design l Status of Target ref. Schedule »Drawings –Drawing list created (see next slide) includes inventory –Drawings being released.
1 MICE PM report Target News Outcome of Spectrometer Solenoid Review New plans for Steps II & III RF Power news MICE CMPB, 4th December, 2009.
11/2/2005Mike Viola1 November Lehman Review November 2, 2005 NCSX VVSA NCSX Vacuum Vessel Fabrication Major Tool and Machine – S F 3 120° segments.
LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 12 Jul 2011 LAV construction status: a snapshot 2 A1 Arrived at CERN 29 Jun.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l Requirements l Environment l Design l Structural Integrity l Preparation l Installation.
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
VC117 February 2009Jean-Sébastien GraulichSlide 1 MOM Report o Yagmur Torun ( June 15 - July 14) o J.S. Graulich ( July 13 - August 7) Jean-Sebastien Graulich,
NEW BRUNSWICK COUNSELING CENTER IMPROVING INTERNAL BILLING PROCESSES August 2012.
Chris Booth & Paul Smith Sheffield 16 th August 2007 MICE Target Installation.
Module 7 Unit 22 – Welding Prints. Learning Objectives Identify a welding symbol. List the elements of a welding symbol. Explain the meaning of a welding.
1 WBS 1 Preparation for FDRs NCSX WBS 1 Engineering Meeting March 17, 2003 What establishes the plan? What are near term deliverables? How will we status.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
RFQ Installation Plan PIP-II Meeting, 14-July-2015 C. Baffes for R. Andrews, A. Chen, Y. Czajkowski, S. Kazakov, R. Pasquinelli, D. Peterson, O. Pronitchev,
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
ESS Program Plan and Schedule Update
STEP 1: ASSEMBLE ANGLE PLATES
Teleconference ACS – FREIA 31th May 2017
Francois and Lau EATM 17 July 2012
Nodal Status Report: Program Controls Update
MICE Target Mechanical Design
Complementary ISTC Projects #3888, 3889p
Thanks to all of you for this effort !
Status of the AGATA installation at GANIL
Services Layout – Update
Diffuser status October 2017
Far Detector Activities Late 2017 – Early 2018
Firs samples Injection direction
Beam Wire Scanners (PS prototype and LIU series)
SF6 Live tank circuit breakers
Workforce Management Implementation Dos and Don’ts
Cryomodule Assembly Plan
Prototype cryomodule development
LCLS-II Cryoplant Controls Workshop.
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
LCLS Vacuum System Plans (July 07)
UPPSALA UNIVERSITY_GERSEMI PROJECT
Xoserve IX Refresh Customer Update 30/07/2019.
Xoserve IX Refresh Customer Update 30/07/2019.
Presentation transcript:

K. Long, 27 June, 2015  Target K. Long, Monday, 06 July 2009

Critical path: Issue: target shaft: – Reported last week: One-piece shaft has failed Begin study of joining two piece shaft – Jason has considered: Pinned and welded options Sample now about to be sent to EB welder for weld: – Interference fit, stitch weld to secure – Unwelded interference fit already very strong – More optimism this week than last!

‘Dry’/trial assembly 08Jul09: Basically successful Issue revealed: – Need to support vacuum tube at each end to ensure no strain on weld – Scheme agreed and Belleville washers identified Sample being sent to JT Update to drawing will be made

Impact on schedule: Shaft manufacture now ~4 weeks behind schedule Can still recover: – Electron-beam weld ‘baseline’ – Expect samples back in a couple of days, then: Test (pull test, stiffness test) – Although EB weld was baseline, will still prepare short paper for TB There is still risk here! – Remain well aware of need to install target in August shutdown Also remain well aware of continuing requirement to maintain high standards of quality control and tracking of manufacture