1 DLR/EEC Total Airport Management Christoph Meier & Peter Eriksen European Organisation for the Safety of Air Navigation.

Slides:



Advertisements
Similar presentations
TCM - Tactical Capacity Management Maastricht UAC European Organisation for the Safety of Air Navigation.
Advertisements

SIP/2012/ASBU/Nairobi-WP/19
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
VDL Mode 4 Performance Simulator (DLS enhancements) presented by EUROCONTROL Montreal, 26 October 2004.
Preliminary Hazard Analysis of EUROCONTROL Concept of Operations 2011 using the FAST method European Organisation for the Safety of Air Navigation presented.
Total Airport Management CARE Innovative Study
Total Airport Management Systems
European ATFM From current operation towards the future Patrick Ky
One Sky for Europe EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Track 1 Summary Performance metrics in target.
EWater Road Show 21 Feb – Part 3 of 5 Dr Peter Wallbrink Source Project Director, eWater Building the new integrated modelling system for Australia.
Episode 3 / CAATS II joint dissemination event Gaming Techniques Episode 3 - CAATS II Final Dissemination Event Patricia López Aena Episode 3 Brussels,
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
27 June Report on two themes: Airport Management Weather & Environment by: Jan Terlouw (NLR) ATM 2003 Seminar, Budapest June 27, 2003.
Mission Trajectory Step 1 From planning to deployment.
The European Organisation for the Safety of Air Navigation The need for Data sharing Generic Civil-Military Cooperation.
Episode 3 Operational Concept Detailing Episode 3 - CAATS II Final Dissemination Event Ros Eveleigh & Eliana Haugg EUROCONTROL & DFS Episode 3 Brussels,
E-OCVM (Version 2) Explained Episode 3 - CAATS II Final Dissemination Event Alistair Jackson EUROCONTROL Episode 3 Brussels, 13 & 14 Oct 2009.
Future Airspace Strategy (FAS) Heathrow Airport Consultative Committee 31 st March 2010 Phil Roberts Assistant Director of Airspace Policy 1 1.
Episode 3 1 Episode 3 EX-COM D Final Report and Recommendations Operational and Processes Feasibility Pablo Sánchez-Escalonilla CNS/ATM Simulation.
Information Management The ICAO Perspective
GAMMA Overview. Key Data Grant Agreement n° Starting date: 1 st September 2013 Duration: 48 months (end date 31 st August 2017) Total Budget:
Episode 3 / CAATS II joint dissemination event Combining Techniques: Expert Groups, Gaming and Modelling Pablo Sánchez-Escalonilla AENA Episode 3 Brussels,
International Civil Aviation Organization Collaborative Decision Making (CDM) Saulo Da Silva Workshop on preparations for ANConf/12 − ASBU methodology.
Workforce planning. What is workforce planning? Definitions.
Project Presentation.
Regional ATFM in Europe
Page Lufthansa ASAS It's Time for a paradigm change... Workshop May 2003, Rome
Capacity and Service to Road Users Task O1 Vision Paul van der Kroon, Copenhagen March 2006.
ICAO-IATA Cross-Border ATFM Workshop
Draft High Level Operational Concept V0.4 Mode of Operation for the Single European Sky Deployable from /11/04.
NAS-WIDE Simulation Workshop December 10, 2008 Interagency Portfolio & Systems Analysis Division Yuri Gawdiak.
Required Total System Performance (RTSP) Bernard Miaillier EUROCONTROL Agenda Item 3 EUROCONTROL.
KLM - Operations at Schiphol: how does ASAS fit? ASAS TN2: final seminar, April, Paris E. Kleiboer Sr. Manager Strategy ATM.
A Vision Based on Achievable Expectations Jack Howell Director / Air Navigation Bureau Agenda Item 1.
Flexible Use of Airspace and Collaborative Decision Making The aim of this presentation is to provide the aviation industry with the understanding of the.
1 European Organisation for the Safety of Air Navigation Jan Van Doorn Director EUROCONTROL Experimental Centre April 2006 ASAS / ADS-B: Implementation.
C-ATM User Group and ASAS…….. Presented on Behalf of the C-ATM User Group Billy Josefsson, LFV Group ASAS Thematic Network 2, Malmö /28.
Benefits of CDM Within AFI Region Presented by: Mikateko Chabani.
Episode 3 E3-WP0-MWPM PPT-V th ExCom Slides 1 Episode 3 - Ex-Com Final Report Tools & Validation Dr. Ralph Leemüller R&D Division - DFS.
The European Organisation for the Safety of Air Navigation Brian Flynn Directorate of Network Management Head Network Operations unit EUROCONTROL What.
1 ILA Berlin - May 2008 Marc Brochard - EEC EPATS ATM General Requirements & relative issues to be solved.
Federal Aviation Administration 1 Collaborative Decision Making Improving Air Traffic Management Together…
ENAV S.p.A. 1 AENA / ENAV / DFS / LFV ASAS Thematic Network Workshop Malmoe, ASAS /ADS-B: SAMPLE ANSPs STRATGIES & EXPECTATIONS.
Next Generation Air Transportation System Presentation to the Commercial Space Transportation Advisory Committee (COMSTAC) May 26, 2005 Robert A. Pearce.
Programme Status ECTL AAB February FACTS  A mature approach: 2500 contributors Release process organises the delivery cycle ATM Engineering:
DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels ASAS operational improvements:
1 EUROCONTROL S TRATEGIES FOR The ATM Strategy for the Years As from MATSE/6 decision (Jan. 2000): To cater for forecast increase in demand.
Road Investment Decision Framework
TOOLS FOR MINING DEVELOPMENT POLICY AND IMPLEMENTATION
Collaborative Decision Making (CDM) Saulo Da Silva
Collaborative Decision Making Module 5 “The Collaborative Environment”
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
The Role of Air Traffic Control in A CDM ENVIRONMENT
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
SIP/2012/ASBU/Nairobi-WP/19
COLLABORATIVE DECISION MAKING CONFERENCE
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
ICT PSP 2011, 5th call, Pilot Type B, Objective: 2.4 eLearning
OPTIFRAME : Project Overview
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
Global ATM Operational Concept
Agenda Item 1 A Vision Based on Achievable Expectations Jack Howell Director / Air Navigation Bureau.
OptiFrame WP1: Project Management
ATFM IMPLEMENATION IN INDIA – FUTURE PLANS
What is SESAR? SESAR is the European program for air traffic management infrastructure modernisation. SESAR aims at the development of the next generation.
Aviation Innovation for Regional Integration
Complex World Event 8 April 2015 EUROPEAN COMMISSION.
Traffic Management and FUA integration
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
Block 1 Overview Rubén Oscar González Air Navigation Commissioner
Presentation transcript:

1 DLR/EEC Total Airport Management Christoph Meier & Peter Eriksen European Organisation for the Safety of Air Navigation

2 Or… Where do we take Airport CDM from here?

3 Today’s problem Lack of collaborative strategic planning between Airport partners Limited facilities for real-time data sharing Inflexible responses to real-time events Inability to exploit potential for efficience and capacity gains offered new capabilities Even with Airport CDM in place

4 Airport CDM TAM is an extension of Airport CDM Airport CDM will improve today’s situation, but there are certain shortcomings: - CDM is limited to the pre-tactical phase (+2 hours) - There is no support of analytical tools - CDM provides limited understanding of system wide impact of decisions - CDM has limited use of common performance indicators …but Airport CDM is still a big step forward

5 Stakeholders need…. optimised arrival and departure rates for sustained periods improved predictability of all airport processes sufficient flexibility to accommodate real- time events environmentally suitable and acceptable operations understanding of trade-off possibilities

6 What is TAM? TAM considers the airport holistically as one node of the overall air transport network. In order to ensure an overall Quality of Service (QoS) of an airport to the customers and to the air transport network, TAM concentrates on the initial strategic and pre-tactical planning phases using the most accurate information available, followed by the monitoring (and when required, reactive planning) of the tactical working process.

7 Collaborative planning processes assuring equity and flexibility How will TAM work? Based on commonly agreed performance indicators Allowing for Airport Configuration and management based on agreed performance targets Modeling and visualisation of airport processes to allow for common understanding of future scenarios Looking minutes, hours, days, weeks or months ahead

8 Expected Benefits Improved predictability Resources can be used more efficiently, keeping sufficient flexibility to cater for the unforeseen More transparency Cooperative negotiation and equity for all stakeholders Trade-off With direct involvement of stakeholders in determining performance targets

9 Problems addressed by TAM Poor global flow of information: A deficit of information exchange between subsystems is caused due to no common information system Global goal neglect and conflicting interests: Subjective interests of stakeholders follow a local cost- benefit analysis before information exchange is supplied and restrictions are accepted Complexity increase: Problems of complexity increase, focusing on global goals. More system parameters and dependencies have to be considered

10 Scope of TAM (time horizon)

11 Scope of TAM (spatial)

12 Instantiations of TAM (1/2)

13 Instantiations of TAM (2/2) De-Centralised APOC Centralised APOC APOC by Hand Remote APOC

14 Generic Management Cycle

15 Human Centred Automation

16 Joint Airport Operations Plan (AOP) Performance Targets Flow Targets Resource-Event Targets Static Constraints Dynam. Constraints

17 AOP Dynamics

18 AOP Lifecycle

19 Functional Architecture of TAM

20 Representatives (agents) in TAM

21 Fundamental Roles in APOC

22 Decision Making Process

23 The TAM actors will conduct a number of daily conferences where they will analyse past performance The past performance will be used to determine optimum future airport configurations and predict perfomance using modelling (e.g. +6 hours, +24 hours, +7 days, + 30 days) TAM in practical terms

24 Decision support tools will help visualising the consequence such as delay, but also e.g. environmental load Aircraft Operators will if required perform demand/capacity trade offs and develop alternative demand scenarios than can be evaluated by decision support tools TAM in practical terms

25 Summary, Status and Outlook TAM is the Vision, Airport CDM the solid starting point Performance based airport needed to enable performance based ATM “Total” means airside and landside & adhoc to strategic time horizon Proactive, layered guidance based on C 4 I principles Tools supporting dynamic, repetitive planning results in joint AOP Human centred automation Different APOC Instantiations possible Integrating existing approaches like A-SMGCS, xMAN, CDM… Initial concept document jointly developed by DLR and EEC Initial Validation Exercises planned for EC FP-6 Episode 3 Effort in DLR and EEC to be continued FP7 / SESAR might be platform for large scale validation