Technologies for Precise Distance and Angular Measurements In Space M. Shao JPL.

Slides:



Advertisements
Similar presentations
Status of the Virgo Commissioning G.Losurdo – INFN Firenze/Urbino for the Virgo Collaboration.
Advertisements

CMSC 2006 Orlando Active Alignment System for the LSST William J. Gressler LSST Project National Optical Astronomy Observatory (NOAO) Scott Sandwith New.
Aerospace Engineering Department Texas A&M University, May/17/2002 VISNAV 3D (In Brief) Texas A&M University Aerospace Engineering Department May/17/2002.
Optics in Astronomy - Interferometry - Oskar von der Lühe Kiepenheuer-Institut für Sonnenphysik Freiburg, Germany.
Error budget for the PRIMA conceptual design review Bob Tubbs, Richard Mathar, Murakawa Koji, Rudolf Le Poole, Jeff Meisner and Eric Bakker Leiden University.
Frequency Scanning Interferometry (FSI) measurements
INS : State of the art Yves PATUREL. 2 INS : noise on the sensors For inertial sensors, one typical way of measuring noise is the draw the Allan variance.
Precision Displacement Measurement via a Distance Measuring Interferometer (DMI)
Lecture #2 Seeing the light 1/29/13. What happens to light when it interacts with matter? Reflects Absorbed Refracts Changes speed Polarized Diffracts.
Phys 102 – Lecture 22 Interference 1. Physics 102 lectures on light Lecture 15 – EM waves Lecture 16 – Polarization Lecture 22 & 23 – Interference & diffraction.
Adaptive Optics and Optical Interferometry or How I Learned to Stop Worrying and Love the Atmosphere Brian Kern Observational Astronomy 10/25/00.
Lecture 22 Wave Optics-3 Chapter 22 PHYSICS 270 Dennis Papadopoulos April 2, 2010.
Optical Alignment with Computer Generated Holograms
ASIC3 WorkshopLandsdowne, VA May 16-18, 2006 J. Harder Page 1 Calibration Status of the Solar Irradiance Monitor (SIM) : The Present and the Future Jerald.
Initial Calibration and Stability Results from the LiCAS RTRS FSI System John Dale for the LiCAS Collaboration IWAA February 2008.
ASTRO 2233 Fall 2010 Adaptive Optics, Interferometry and Planet Detection Lecture 16 Thursday October 21, 2010.
Use of a commercial laser tracker for optical alignment James H. Burge, Peng Su, Chunyu Zhao, Tom Zobrist College of Optical Sciences Steward Observatory.
Sta bilization of the F inal F ocus : Stabilization with Nano-Meter Precision.
Amplitude Control: Closing the Loop in a Zero Path Length Difference Michelson Interferometer Michael G. Littman, Michael Carr , Laurent Pueyo, Jeremy.
Near & Long Term Planet Searches (not a review) S. R. Kulkarni California Institute of Technology.
Phase and Amplitude Control Ability using Spatial Light Modulators and Zero Path Length Difference Michelson Interferometer Michael G. Littman, Michael.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Green Bank Laser Rangefinders.
PLATO kick-off meeting 09-Nov-2010 PLATO Payload overall architecture.
LumiCal Alignment System Status report Leszek Zawiejski, Tomasz Wojtoń, Arkadiusz Moszczyński Institute of Nuclear Physics PAN, Cracow 25th FCAL Collaboration.
High index glass spherical targets for laser interferometry Miroslav Sulc 1st PACMAN worshop 1.
Optical Interferometry for Fundamental Physics
This Set of Slides This set of slides deals with telescopes. Units covered: 26, 27, 28, 29, and 30.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n s t r u m e n t S y n t h e s i s a n d A n a l y s i s L a b o r a t o r y Super Star Tracker.
NA62 Gigatracker Working Group Meeting 2 February 2010 Massimiliano Fiorini CERN.
Concepts for Combining Different Sensors for CLIC Final Focus Stabilisation David Urner Armin Reichold.
Laser interferometer Su-Jin Kim, GNU & Xiaoyu Ding.
G O D D A R D S P A C E F L I G H T C E N T E R 1 GW Interferometry at Goddard Space Flight Center Jordan Camp NASA / Goddard Space Flight Center Jan.
Coincidence analysis in ANTARES: Potassium-40 and muons  Brief overview of ANTARES experiment  Potassium-40 calibration technique  Adjacent floor coincidences.
ANATAC Meeting Line Length Correction Status 2004-Apr-23.
Superconducting MAGnetically LEVitated vehicle Utilises magnets and linear electric motor technology Reach speeds of up to 552kmh.
HESSI Imaging Capability Pre Environmental Review Brian R. Dennis GSFC Tuesday, February 29, 2000.
David Urner, Oxford University, RHUL – June StaFF Stabilization of Final Focus Motion Stabilization with Nano-Meter Precision David Urner Paul Coe.
LASER AND ADVANCES IN METROLOGY
Example problem 1 Example problem 2
1 The slides in this collection are all related and should be useful in preparing a presentation on SIM PlanetQuest. Note, however, that there is some.
A Search for Earth-size Planets Borucki – Page 1 Roger Hunter (Ames Research Center) & Kepler Team March 26, 2010.
Lyot Stop Focal Plane Mask OAP3 Out of plane spherical mirror.
04. November 2004 A. Freise A. Freise, M. Loupias Collaboration Meeting November 04, 2004 Alignment Status.
 a mathematical procedure developed by a French mathematician by the name of Fourier  converts complex waveforms into a combination of sine waves, which.
BEPCII Prealignment Installation Survey and Alignment Accelerator Center of IHEP Xiaolong Wang
1 The slides in this collection are all related and should be useful in preparing a presentation on SIM PlanetQuest. Note, however, that there is some.
Henry Heetderks Space Sciences Laboratory, UCB
 SIM-Lite: 6 m baseline optical interferometer in space for precision/deep astrometry.  Pointing mode not survey (spinning).  SIM concept is finishing.
1/10 Tatsuya KUME Mechanical Engineering Center, High Energy Accelerator Research Organization (KEK) ATF2-IN2P3-KEK kick-off meeting (Oct. 10, 2006) Phase.
The stabilisation of the final focus (StaFF) system Sun 12 th March 2006 MDI – LCWS06 at I I Sc Bangalore David Urner, Paul Coe, Armin Reichold.
Comparison of Laser Interferometry and Atom Interferometry for Gravitational Wave Observations in Space Peter L. Bender JILA, University of Colorado Boulder.
1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.
1 Initial Study Task Mark Herring / Jordan Camp. 2 May 13, 2003 Topics Purpose of Initial Study Task Schedule and Format Task Description.
J. Marr - 1 SIM MMR Space Interferometry Mission A NASA Origins Mission SIM 5/14/2004 Project Summary National Aeronautics and Space Administration Jet.
Charts for TPF-C workshop SNR for Nulling Coronagraph and Post Coron WFS M. Shao 9/28/06.
MONALISA Update David Urner ATF2 Meeting Dec
INTEGRATION OF IFE BEAMLET ALIGNMENT, TARGET TRACKING AND BEAM STEERING Graham Flint March 3, 2005.
Target Engagement Graham Flint - General Atomics Tom Lehecka - Penn State Electro-Optics Center Bertie Robson - NRL HAPL Project Review Oak Ridge National.
J. H. Burgea,b, W. Davisona, H. M. Martina, C. Zhaob
G O D D A R D S P A C E F L I G H T C E N T E R 1 Status of LISA Jordan Camp LISA Deputy Project Scientist NASA / Goddard Space Flight Center Jan. 19,
ST7 Interferometer LIGO-G Z1 The ST7 Interferometer Andreas Kuhnert Robert Spero Jet Propulsion Laboratory California Institute of Technology.
13,14 July 2005 Feasibilty/Concept Study Mid Term Status Review Laser Metrology for Segmented Telescopes Feng Zhao, Tom Cwik Jet Propulsion Laboratory.
National Aeronautics and Space Administration Jet Propulsion Laboratory California Institute of Technology M. Shao Jan SIM-Lite Update M. Shao.
10-meter Interferometer Results M. Woods (special thanks to Steve Myers and Tim Slaton) Jan. 31, 2000 Commissioning Setup System Noise Monte Carlo simulation.
UNIT-3 ADVANCES IN METROLOGY
Stellar Spectroscopy at Appalachian State University R.O. Gray
David Urner Paul Coe Matthew Warden Armin Reichold Oxford University
Huailin Chen, Bruce Gentry, Tulu Bacha, Belay Demoz, Demetrius Venable
GAJENDRA KUMAR EC 3rd YR. ROLL NO
Transverse coherence and polarization measurement of 131 nm coherent femtosecond pulses from a seeded FEL J. Schwenke, E. Mansten, F. Lindau, N. Cutic,
Presentation transcript:

Technologies for Precise Distance and Angular Measurements In Space M. Shao JPL

Technology and Flight Hardware Development of Optical Metrology Components and subsystems for precise distance measurements, applicable to SIM, and future relativity missions. –Moderate power lasers with long lifetimes. –Metrology source (freq shifters etc.) –Beam launchers (metrology gauges) –Types of errors at the picometer level Angular measurements at the microarcsec level, the SIM technology program. –End to end demonstration of micro-arcsec astrometric precision Astrometry as a tool to study dark matter in our galaxy, and the local group.

Metrology Source Two major components –Laser –Frequency shifters and fiber distribution systems Laser –SIM’s laser is a NPRO diode pumped YAG laser, designed with redundant pump laser diodes to achieve > 99.7% probability of working for 5 years in space. (SIM has a spare laser, ) The acousto-optic frequency shifters provide the optical signals needed for heterodyne interferometry. The major activity here is not developing new technology but engineering components for flight. Engineering model built and tested (Shake, thermal vac) in 2007.

Instrumental Errors in Long Distance Metrology Pointing /diffraction Beam walk (imperfect optics) Laser freq stability Transmissive optics (dN/dT)

5 Pointing Errors If the outgoing wavefront is not properly pointed at the other spacecraft the optical phase of the wavefront may not represent the distance between the two fiducials. This is minized if the outgoing wavefront is spherical, centered on the fiducial. Light hitting a retroreflector reverses the direction of the laser. The optical path measured is separation of the fiducials*cos(  ). A 10m distance and a 1 urad pointing error yields a 5 picometer distance error. For very long distances, a collimated laser beam through diffraction will turn into a spherical wavefront. As a rough estimate, the pointing error applies to the path where the wavefront hasn’t become spherical. (D 2 / )

Defining a Retroreflector’s Vertex The vertex of a CC is where the three planes intersect. The plane as defined by where metrology beam samples the CC. One has to be careful if we want a definition more precise than the fabrication of the surfaces. ( /100 ~ /1000) Cat’s eye retroreflector If the footprint of the interrogating laser beam moves by 1% of the beam dia, and the surface is perfect to l/1000, one would expect the vertex position to be stable to ~ /100,000 A cat’s eye retro will interrogate a few micron spot on the mirror at focus. The vertex definition is only as good as the quality of the surface.

Metrology Beam Launchers Beam launcher, designed with critical alignment components fixed on a zerodur optical bench. Launcher includes provision for pointing the beam with 1urad accuracy. Engineering model built and tested (Shake, thermal vac) in Laser pointing should be parallel to a vector joining the vertices of the two CC’s

Optical Fiducials in Optical Trusses Several missions make use of precise (sub nanometer) optical trusses. –SIM (optical truss to connect several stellar interf) –Beacon (test of relativity) –LISA? –Optical trusses requires that multiple lasers reference the same optical fiducial. Dual corner cube, optically contacted construction.  /20 p-v wavefront to 1mm/edge Common vertex to ~1um Measure vertex offset to ~1nm.

Precise Measurement of Angles Between Stars External Delay – Internal Delay 0 Detected Intensity An interferometer measures ( B · s )  the dot product of the baseline vector & a unit vector to the star, The peak of the interference pattern occurs when [Internal delay] = [External delay] Internal Path Delay or, the projection of the star vector in the direction of the baseline S B Delay line Detector Beam Combiner telescope 2 telescope 1 External Path Delay x = B cos(  )+C   x 

SIM Technology Flow Component Technology Subsystem-Level Testbeds Picometer Knowledge Technology Nanometer Control Technology Numbers before box labels indicate HQ Tech Gate #’s ( 1 through 8 ) System-Level 2 : STB-3 (three baseline nanometer testbed) 3, 5, 6, 7 : MAM Testbed (single baseline picometer testbed) Narrow & Wide Angle Tests 4 : Kite Testbed (Metrology Truss) STB-1 (single baseline nanometer testbed) Optical Delay Line 1 : Beam Launchers Hexapod Reaction Wheel Isolator Metrology Source Absolute Metrology High Speed CCD Fringe Tracking Camera Multi-Facet Fiducials :Oct2002 3:Sep2002; 5:Mar2003 6:Sep2003; 7:Jun2004 8:Jul2005 1:Aug2001 2:Nov TOM Testbed (distortion of front end optics) 8 : Overall system Performance via Modeling/Testbed Integration All 8 Completed

STB-3 on 9-meter Flexible Structure

The Micro Arcsec Metrology Testbed IIPS MAM Interferometer Laser metrology measures the position of the IIPS. Test is to compare metrology to whitelight (starlight) fringe position.

Wide Angle Astrometry SIM goal is 4uas global astrometry (end of mission) Single epoch accuracy ~ 10uas. Wide angle test sequence looks at ~60 stars over a 15 deg field of regard. (~1hr test) Instrumental error vs position in the field of regard. Met milestone ~4 uas error (end of mission) ~10uas single epoch error. Dominated by field dependent biases and thermal drift over 1 hr (versus 90sec for NA)

Narrow Angle Astrometry 1 uas total error 0.7 to photon noise 0.7 to instrument 0.5 to science interf 0.5uas ~25 pm Meet 25pm in 8 chops Each dot is an 8 chop average MAM test: 4 ref stars, 1 target star, (T, R1, T, R2, T, R3, T, R4 …. Repeat) ~20 runs conducted over ~1 week.

Thermal Drift, 1/f type noise Thermal drift will change optical pathlengths. But most thermal drift on SIM is benign, because it’s accurately monitored by laser metrology. (accurate means accurate at the few picometer level) Astrometric errors occur when the alignment of the starlight and metrology light diverge. Since both starlight and metrology light are actively control, this happens when the alignment sensors in the ABC (astrometric beam combiner) move wrt each other. Dimensional instability (from thermal instability) of the ABC bench can cause star- light and metrology to diverge. ABC bench is a box within a box. The ABC enclosure is controlled to 10mK. The ABC optical bench inside the enclosure is stable to better than 1 mK.

Thermal Stability of the Lab Testbed vs Model of SIM on Orbit Multi-100 node thermal model of SIM-(lite) in solar orbit executing an orange peel. Plot is temperature on the ABC bench. Inside Testbed Vac Tank temperature measurement The MAM optics in the MAM vacuum chamber was reconfigured and the testbed called SCDU. But the thermal properties of the chamber were overall unchanged. (Shorter ~6hr allan variance data taken showed that the new setup is slightly better than before. The plot on prior page 2 over estimates the thermal error.

We have two squiggly lines for thermal drift. How do we compare them? We compare their power spectra. SIM in solar orbit is expected to be more stable than the inside of the MAM vacuum tank. (Thermal instability even in the MAM tank is not the dominant error/noise source.) The reason chopped astrometry error goes as sqrt(T) is because we’re sensitive to the noise at ~0.01 hz, (90sec chop period). The rms error of a 1000sec integration of a chopped signal is roughly a 0.001hz bandwidth around 0.01hz.

Effect of Chopping on Thermal Drift While the drift of the starlight-metrology optical path can be quite large over long periods of time, the chopped signal only sees changes on a time scale of ~90 sec.

Instrumental Systematic Error Instrumental errors in the SIM testbed (chopped) does integrate down as sqrt(T) –At least down to ~1 picometer after 1~2x10 5 sec MAM testbed March 2006 Terrestrial Planet search Single epoch precision 1  as Systematic error floor ~ 40 nanoarcsec

Summary The SIM technology program has demonstrated the ability to make precise angular measurements in space. The activities have changed from (demonstrating it can be done) to building engineering units that can survive launch loads and operate in space, with high reliability over many years. (A series of engineering milestones have replaced the technology milestones). In subsequent talks at this conference S. Majewswski,and E. Shaya will talk about how they would use SIM to study Dark Matter in our galaxy and the local group. The components that have been flight qualified have uses in other space missions that test relativity. (Beacon will be discussed by B. Lane later today.)