Overhead Sign Support Structures: Meeting AASHTO 2001 John W. van de Lindt CDOT Staff Bridge Communication Day – September 27, 2004.

Slides:



Advertisements
Similar presentations
ENCE 455 Design of Steel Structures
Advertisements

Rigid-Frame Structures
Nottingham Centre for Infrastructure Bridge Engineering Research Dr John S Owen.
FLORENCE & HUTCHESON LEE SEWELL, PE, SE.  SIGNAL AND LIGHTING STRUCTURAL ANAYLSIS (SALSA)  ANALYZES WIRE SPAN, MAST ARM AND HIGH MAST STRUCTURES.
1 Westinghouse Non-Proprietary Class 3© 2012 Westinghouse Electric Company LLC. All Rights Reserved. Structural Analysis of a Nuclear Fuel Handling Machine.
Engineering H191 - Drafting / CAD Gateway Engineering Education Coalition Lab 5P. 1Autumn Quarter Material Joining and Beam Bending Lab 5.
Challenge the future Delft University of Technology Blade Load Estimations by a Load Database for an Implementation in SCADA Systems Master Thesis.
Konstantinos Agrafiotis
Analysis of Structural Failures of Wind Towers AMERICAN WIND ENERGY ASSOCIATION May 2009 Dilip Khatri, PhD, MBA, SE Senior Structural Engineer URS Corporation.
CM 197 Mechanics of Materials Chap 8: Moments of Inertia
Erdem Acar Sunil Kumar Richard J. Pippy Nam Ho Kim Raphael T. Haftka
National Best Practices Conference Covered Bridge Preservation Analyzing Covered Bridges for Live Loads Covered Bridge Preservation National Best Practices.
Safety assesment of a steel frame using current code and SBRA method Petr Konečný, M.S. Structural Mechanics Division Department of Civil Engineering.
Chapter 5 Fatigue.
Vibration-based Structural Health Monitoring. Vibration-based SHM Principle of Operation: Damage can be considered as a modification of physical parameters.
Prediction of Load-Displacement Curve for Weld-Bonded Stainless Steel Using Finite Element Method Essam Al-Bahkali Jonny Herwan Department of Mechanical.
Cantilevers Trey Talley C’13 Department of Physics and Astronomy Sewanee: The University of the South, Sewanee, TN Introduction Cantilevers can be found.
Structures and stress BaDI 1.
Fatigue Failure Through Bending David Burnette ME 498.
Performance Evaluation
A Designer’s Approach for Optimizing an End-Loaded Cantilever Beam while Achieving Structural and Manufacturing Requirements Timothy M. Demers November.
Dr. Ali I. Tayeh First Semester
BRIDGE DESIGN SAIF HAROON BY Post-Doctoral Research Associate
Introduction to virtual engineering László Horváth Budapest Tech John von Neumann Faculty of Informatics Institute of Intelligent Engineering.
Fatigue in Concrete Structures Raquib Ahsan, Ph.D. Professor Department of Civil Engineering BUET.
1 September 4, 2003 Bayesian System Identification and Structural Reliability Soheil Saadat, Research Associate Mohammad N. Noori, Professor & Head Department.
Main Goals of this Activity
Dr.M.V.Rama Rao Department of Civil Engineering,
© 2011 Autodesk Stressed Up: From Inventor Simulation to Simulation Mechanical Wasim Younis Senior Application Engineer, Symetri UK James Herzing Technical.
CABLE-STAYED BRIDGE SEISMIC ANALYSIS USING ARTIFICIAL ACCELEROGRAMS
I. Truss Bridge Gussets Background
Static Pushover Analysis
Application of the Direct Optimized Probabilistic Calculation Martin Krejsa Department of Structural Mechanics Faculty of Civil Engineering VSB - Technical.
Reliability analysis of statically indeterminate steel frame (pilot study) David Pustka VŠB – Technical University of Ostrava Faculty of Civil Engineering.
Structural Engineering Lab 3.1 kind of fatigue design. (1) Safe life design (2)Fail safe design (3) Damage tolerance design (4) Fracture controlled design.
Uncertainty on Fatigue Damage Accumulation for Composite Materials Authors: Henrik Stensgaard Toft, Aalborg University, Denmark John Dalsgaard Sørensen,
Along-wind dynamic response
A PPLIED M ECHANICS Lecture 03 Slovak University of Technology Faculty of Material Science and Technology in Trnava.
Reliability Analysis of Wind Turbines
CTC 422 Design of Steel Structures Introduction. Steel as a Building Material Advantages High strength / weight ratio Properties are homogeneous and predictable.
Milford Haven Bridge Disaster Group 9 Dave Riordan Ciaran Daly Brian Dennehy Martin Faure.
Reliability-Based Design Methods of Structures
Teaching Modules for Steel Instruction
ENGR 211 Bridge Design Project
Probabilistic Design Systems (PDS) Chapter Seven.
Sign Structures Updates: Helpful Tips for Inspectors
Reducing Uncertainty in Fatigue Life Estimates Design, Analysis, and Simulation 1-77-Nastran A Probabilistic Approach To Modeling Fatigue.
1 CHAP 8 STRUCTURAL DESIGN USING FINITE ELEMENTS FINITE ELEMENT ANALYSIS AND DESIGN Nam-Ho Kim Edited and audio Raphael Haftka.
BASICS OF DYNAMICS AND ASEISMIC DESIGN
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
ME 160 Introduction to Finite Element Method-Spring 2016 Topics for Term Projects by Teams of 2 Students Instructor: Tai-Ran Hsu, Professor, Dept. of Mechanical.
ISEC-02 Second International Structural Engineering and Costruction Conference September 22-26,2003, Rome “EVALUATION AND RESULTS’ COMPARISON IN DYNAMIC.
1 Limit State Design Concept. 2 Designer has to ensure the structures, he designs are: Fit for their purpose Safe Economical and durable INTRODUCTION.
Fatigue Analysis in ASME B31.3 Piping
Lay-On Gable Frame Connection Overview. Introduction A lay-on gable frame is typically connected from the top during truss placement, but after sheathing.
Limit State Design Concept V.N.Kundlikar
Model Reduction & Interface Modeling in Dynamic Substructuring Application to a Multi-Megawatt Wind Turbine MSc. Presentation Paul van der Valk.
PS Internal Dump - actuation system
47th STGEC – Biloxi, MS – Nov. 10, 2016
CHAP 8 STRUCTURAL DESIGN USING FINITE ELEMENTS
Limit State Design Concept
Damped Forced Vibrations Analysis Using CAMP-G® and Simulink® Modeled Solutions to Problem (
Effect Of Wind Load On High Rise Buildings PRESENTED BY, SRUTHI SIVAKUMAR ROLL NO : 20 SECM,S3, M TECH SJCET,PALAI GUIDED BY, Mrs.MARIAMOL KURIAKOSE ASSISTANT.
ENCE 455 Design of Steel Structures
STRUCTURAL DYNAMICS SEYE NIGUSSIE. Introduction WHAT IS STRUCTURAL DYNAMICS ?  Dynamics concerned with the study of force and motion which are time dependent.
Fire Resistance of Steel Structures
ENGINEERING MECHANICS
Thought for the day “Engineering is the art of modelling
ISEC-02 Second International Conference on Structural Engineering and Construction Algebraic Method for Sensitivity Analysis of Eigensystems with Repeated.
TRAFFIC DESIGN UPDATE SPECIFICATIONS
Presentation transcript:

Overhead Sign Support Structures: Meeting AASHTO 2001 John W. van de Lindt CDOT Staff Bridge Communication Day – September 27, 2004

Motivation AASHTO Standard Specifications for Highway Signs, Luminaires, and Traffic Signals, 2001 Fatigue problems Where to begin ?

Project Objectives Develop a method to analyze and evaluate overhead sign support structures in order to determine a metric accounting for both cost and performance. Apply the method to overhead sign support structure designs currently in use in the U.S. Check the identified structures for compliance with AASHTO 2001 CDOT Staff Bridge Communication Day – September 27, 2004

Nationwide Survey State of the Art / State of the Practice Survey Brief and Simple (9 Questions / 15 min.)  What types of sign structures are being used?  Are there any that are having problems?  Is the AASHTO 2001 Sign Specification being used? CDOT Staff Bridge Communication Day – September 27, 2004

Survey Response 38 Responses = 76 % CDOT Staff Bridge Communication Day – September 27, 2004

Survey Highlights Great variety in different types of sign structures 20 states claim to be using AASHTO 2001 already Steel is the dominant material used CDOT Staff Bridge Communication Day – September 27, 2004

Cost Analysis Cost data is not easily available and highly variable Steel weight is controlling factor in production cost Variability in construction / fabrication methods Constructability factors  Tubular = 1.00  Monotube = 1.15  Truss = 1.20 Cost Parameter = Steel Weight Constructability Factor CDOT Staff Bridge Communication Day – September 27, 2004

Performance Analysis Estimated fatigue life of structural connections subject to natural wind gust loading  Fatigue design was the focus of AASHTO Sign Specification update  Existing work identified structural connections as susceptible to fatigue problems  All types of structures are susceptible to natural wind gust loading Random vibration approach – Crandall and Mark (1961) CDOT Staff Bridge Communication Day – September 27, 2004

Structure Modeling - FEA Simplified FEA model to determine dynamic properties MDOT Cantilever Simplified Model

Modeling -Connections Connections modeled according to cross-sectional properties MDOT Cantilever BaseMDOT Cantilever Arm - Pole CDOT Staff Bridge Communication Day – September 27, 2004

Wind Loading Statistics Wind speed distribution over the contiguous USA in the 1980’s (NOAA) CDOT Staff Bridge Communication Day – September 27, 2004

Wind Loading Statistics – Data Fitting Comparison of NOAA to lognormal PDF Lognormal NOAA CDOT Staff Bridge Communication Day – September 27, 2004

Wind Loading Statistics - Probabilities 25 bins for 25 wind velocities Area of BIN = Probability of Occurrence (P oi )

Dynamic Analysis - Loading Convert wind velocity to force (AASHTO 2001/ASCE7) Initial conditions for free vibration Initial Position Initial Velocity Initial Acceleration Stiffness and Damping Matrices Rayleigh Damping CDOT Staff Bridge Communication Day – September 27, 2004 XoXo

Stress – Time History Standard deviation of combined stress = s i

Fatigue Constants – S-N Curves Stress category from AASHTO 2001 Sign Specification S-N curve from AASHTO 1994 LRFD Bridge Specification # of Cycles to Failure Magnitude of Stress Fatigue Constants CDOT Staff Bridge Communication Day – September 27, 2004

Fatigue Life Damage from each stress time history (25) Fatigue life from all damages Performance Parameter = Estimated Fatigue Life CDOT Staff Bridge Communication Day – September 27, 2004

Cost Utility Functions Convert cost and performance into common units Cost Utility CDOT Staff Bridge Communication Day – September 27, 2004

Performance Utility Functions Performance Utility CDOT Staff Bridge Communication Day – September 27, 2004

Combining Utilities Weighting factors  Adjust emphasis of cost (a c ) and performance (a p ) CDOT Staff Bridge Communication Day – September 27, 2004

Ranking Results – Excluding Cost CDOT Staff Bridge Communication Day – September 27, 2004

Ranking Results – 25% Cost CDOT Staff Bridge Communication Day – September 27, 2004

OH Signs Selected MDOT MDOT –Optimal OH sign support structure Optimization of Cost and Performance of Overhead Sign Support Structures (Ahlborn et al, 2003) CDOT Staff Bridge Communication Day – September 27, 2004

GENERAL OVERVIEW Design Check Procedure Design Check Procedure –Structural analysis method Elastic method Elastic method Allowable stress design (ASD) Allowable stress design (ASD) –Structural properties CDOT Staff Bridge Communication Day – September 27, 2004

GENERAL OVERVIEW (CONT.) Design Check Procedure Design Check Procedure –Serviceability requirements Not considered Not considered –Wind and ice loads Michigan’s location Michigan’s location –Steel and Fatigue design checks Fatigue not considered for bridge types Fatigue not considered for bridge types CDOT Staff Bridge Communication Day – September 27, 2004

LOADS Excerpted from AASHTO Standard Specifications for Highway Signs, Luminaires, and Traffic Signals, CDOT Staff Bridge Communication Day – September 27, 2004

LOADS (CONT.) Michigan Type C Cantilevered Michigan Type C Cantilevered –Group II-Case 2 –Visual Analysis 4.0 CDOT Staff Bridge Communication Day – September 27, 2004

LOAD COMBINATIONS Excerpted from AASHTO Standard Specifications for Highway Signs, Luminaires, and Traffic Signals, CDOT Staff Bridge Communication Day – September 27, 2004

CALCULATED STRESSES Stress Resultants Stress Resultants –P x, P y, P z, M x, M y, M z Connection Properties Connection Properties –A = area of pattern –c = distance from centroid to point* –I = moment of inertia of pattern –J = polar moment of inertia of pattern Michigan Type C Cantilevered Michigan Type C Cantilevered –Base-to-Column Bolts CDOT Staff Bridge Communication Day – September 27, 2004

ALLOWABLE STRESSES Calculated according to 2001 AASHTO design code Calculated according to 2001 AASHTO design code –Anchor bolts –Other bolts and all welds References References –AASHTO Standard Specifications for Highway Bridges –AWS Structural Welding Code D1.1-Steel CDOT Staff Bridge Communication Day – September 27, 2004

RESULTS

CONCLUSIONS Recommendations Recommendations –Inelastic method vs. elastic method –More accurate and detailed FEM’s Future Work Future Work –DOT’s Adopt typical plans Adopt typical plans Adopt 2001 AASHTO design code Adopt 2001 AASHTO design code –Monitor OH sign support structures –Design and research Serviceability requirements Serviceability requirements Include fatigue in design checks for bridge types Include fatigue in design checks for bridge types CDOT Staff Bridge Communication Day – September 27, 2004

Thank You! My Contact Information: John W. van de Lindt Associate Professor Colorado State University Department of Civil Engineering Fort Collins, CO Ph: or Fax: Both reports are available in PDF at: CDOT Staff Bridge Communication Day – September 27, 2004