14 th RCC meeting 10 March 2009 ERGEG European Regional Initiative Central-South Region Interconnection report: contents and implementation.

Slides:



Advertisements
Similar presentations
SETSO Task Force Network Access and Congestion Management for the south-eastern European region SETSO Task Force Network Access and Congestion Management.
Advertisements

European Federation of Energy Traders 1 Electricity Regional Initiative Central-South Europe Region 4th Stakeholder Group meeting The Central South Region.
Access to long-term capacity for electric interconnections: toward a single European set of rules 2 nd common RCC CSE-CWE regions 28 September 2010 Milan.
Electricity Regional Initiative Central South European Region Progress made and next steps for the CS Region By: Giusi Squicciarini AEEG 2nd Stakeholder.
Action plan covering 2008 activities for the implementation of day-ahead implicit auction in Central-South Europe as a mean to allocate cross border capacity.
3rd Stakeholder Group Meeting 1 February 2007 France-UK-Ireland Electricity REM Roundup and next steps David Halldearn – Head of European Electricity Policy,
ERGEG Public Hearing Brussels, 6 July 2006 Gunnar Lundberg Chair of the EURELECTRIC WG Wholesale Markets & Trading Vice Chair of the Markets Committee.
1 ETSO views on Transparency Urban Keussen Member of ETSO Steering Committee Head of Task Force on Congestion Managament ERGEG Public Hearing 6th July.
Planning for allocation rules and the auction platform NRAs propose to follow a two-steps approach:. 2013: » Based on the wish-list and within the scope.
CM Guidelines, Implicit Auction as a Congestion Management Method Baltic Electricity Market Mini-Forum 24 April 2009 Jyrki Uusitalo, Fingrid Oyj.
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
Introduction of an Intraday market on the Italian borders for the year 2011 Terna proposal Electricity Regional Initiative – CSE Region 15th Implementation.
1 Priority issues for the French-UK-Irish regulators What is expected from TSOs? 30 May 2006 To increase trade between adjacent markets and therefore have.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Draft document – Work in progress
1 XVI Florence Forum Jose Sierra Madrid, 4 June 2009 Chair, RIG ERGEG Electricity Regional Initiative Update & Progress.
FUI Electricity region: Update on Congestion management CRE SG Meeting - 3 December 2008.
Markus Krug, Co-Chair CEER Workstream 20 th Madrid Forum 26 September 2011 Harmonised transmission tariff structures Framework Guideline.
Flow-based Allocations Mini Forum Central Western REM June 20 th, 2006.
Walter Boltz, Chairman ERGEG Gas Working Group 19th Madrid Forum 21 March 2011 Monitoring Report Capacity Allocation and Congestion Management.
The Status Report for IG meeting Wojciech Jarosz February 13 th 2009.
Securing competitive energy for industry A “target model” on market integration from the perspective of industrial energy consumers Florence Forum Rome,
FUI Stakeholder Group 4 th July 2008 Congestion Management.
Electricity Regional Initiative Central Eastern European Region Congestion Management – Status & Prospects Tahir Kapetanovic E-Control CEE Stakeholder.
Long term allocation 2011 Italian borders Central-South and Central-West Regions 2nd Joint RCC meeting Milan, September 28 th, 2010.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
Cross Border Intraday on the North Italian Borders Introduction Forum Rome, 13 th March 2012.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
Cross border redispatching Central West Electricity Regional Energy Market Mini Forum Alain Marien 20 th of June 2006.
Transparency in the Central West Electricity Regional Energy Market Office of Energy Regulation (DTe) MINI FORUM Paul Giesbertz.
1 Identification of the needs to modify auction rules in the FUI region Congestion management meeting – 11 January 2007.
Agenda point 2a) Plans for handling of losses on HVDC cables in NWE day-ahead price coupling IG Meeting Copenhagen 19. September 2012.
1 Regional electricity market Belgrade, 23. April Ljiljana Hadzibabic Council member Energy Agency of the Republic of Serbia.
ERGEG Public Hearing 30. June 2005 Congestion Management Guidelines.
The Central Role of the Network Operators 28 March 2007 ERGEG-GTE Meeting.
3 rd Stakeholder Group Meeting 1 February 2007 France-UK-Ireland REM Workstream on Congestion Management Conclusions of the first workshop (11 January.
Achievements and next steps in the Central-South Region Central-South Region 3rd SG meeting Milan, November 16 th 2010.
1 May 2012CACM Network Code Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15 th May 2012.
Northern Mini Forum Copenhagen, 27 June 2006 Gunnar Lundberg Chair of the EURELECTRIC WG Wholesale Markets & Trading Vice Chair of the Markets Committee.
Development of System Operation Network Codes ACER Workshop 24 August 2011 Ole Jan Olesen, Convenor ENTSO-E Working Group on European Operational Standards.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
1 IG Meeting Milan, 18 th July 2008 Cost of Firmness of Capacity.
2nd IMPLEMENTATION GROUP MEETING. Lisbon, 24th January 2008 Conclusions from the 3rd technical RCC.
Union for the co-ordination of transmission of electricity UCTE, 15 Boulevard Saint-Michel, 1040 Brussels, Belgium, UCTE comments on ERGEG.
1 GTE Transparency Platform GIE Annual Conference Madrid, 22/23 November 2007 Paolo Mosa GTE Vice President.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
ERGEG – Stakeholder Meeting Tuesday 14 th November 2006.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
Introduction of an Intraday market on the Italian borders for the year 2011 Electricity Regional Initiative – CSE Region Milan, 16/11/2010.
Electricity Regional Initiative Central- South Region Progress with developing regional electricity markets By: Carlo Crea, Secretary General The Regulatory.
18 December Study Co-Ordination on Day Ahead Capacity in Bunde/Oude Statenzijl and Ellund EC-Operators of Implementation Group ERGEG Regional Gas.
ANRE ROMANIAN ENERGY REGULATORY AUTHORITY Regulation of operation and organization of the electricity day-ahead market with the price market coupling mechanism.
Christophe Gence-Creux SG FUI, Paris, 4 th November. Target models and roadmap proposed by the PCG.
1 16 th February 2016 Videoconference 35 th IG Meeting South Gas Regional Initiative.
Congestion Management
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3rd December th Implementation Group meeting.
Public Consultation : main conclusions (1/2)
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
ERGEG Gas Regional Initiative NW 5th Stakeholder Group Meeting
Agenda point 2a) Plans for handling of losses on HVDC cables in NWE day-ahead price coupling IG Meeting Copenhagen 19. September 2012.
26th IG meeting 23th January 2014
IFA Market Coupling Update
Feedback on the SWE coupling Public Consultation
ETSO Comments on the draft Congestion Management Guidelines
Background and Process
Regulators’ update on Congestion Management and Balancing
SG meeting FR/UK/IR region 14 June 2007 Congestion management
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
EURELECTRIC transparency requirements
Presentation transcript:

14 th RCC meeting 10 March 2009 ERGEG European Regional Initiative Central-South Region Interconnection report: contents and implementation

Structure of the report Cross border flows in 2008 Congestion management methods Economic efficiency of congestion management methods Capacity calculation and management

Scope of the report To provide a detailed report about the usage of interconnection from technical and economical point of view; To collect in a single report different useful information for market monitoring; To help national Regulators to reach a common view about the best way to improve the congestion management within the region.

Cross border flows Data about cross border flows within the CS region and between neighbouring regions: –Missing data shall be provided by TSOs. Interconnection target w.r.t. installed generation capacity: –10% criterion proposed by European Council –Definition of installed generation capacity somehow ambiguous

Cross border flows Installed generation capacity could be intended as the generation capacity available in peak hours. It is computed as a sum of –net-capacity producing power for thermo and hydro generation (the latter are usually fully available in peak hours) –nameplate capacity multiplied by a coefficient reflecting the average available production at peak hours for wind and solar plants.

Congestion management methods Information about allocation methods of interconnection capacities on different time horizons Long and medium term –Tradability and firmness –Single auction office to be inserted –UIOSI rule Day ahead –Tradability and firmness

Economic efficiency Global figures –Comparison between actual and ex post assesment of congestion rent Theoretical rent dependent on price differential multiplied for allocated capacity Theoretical rent useful as a first step to monitor congestion management failures –Market share –Prices attributed to interconnection –Efficient usage Consistency with price differential

Economic efficiency Long and medium term capacities –Yearly and monthly auction results –Standard deviation added to monthly auction table to better monitor the auction results –Secondary market Yearly to monthly auctions Yearly and monthly to daily auctions (UIOSI) Bilateral transfers –Efficient Usage Consistency with price differentials Simultaneous nominations in both directions

Economic efficiency Day ahead capacities –Auction results Only in term of competitors No information about prices –Efficient usage Consistency with price differentials Simultaneous nominations in both directions Estimated loss due to absence of netting between long term and daily capacity Estimated loss due to absence of implicit methods Both losses based on positive portion of price differential

Capacity calculation General principles –Capacity procedure and TRM to be provided by TSO –Information about UIOSI and netting Net transfer capacity –Evolution of transfer capacity throughout 2008 Used standard deviation instead than percentiles –Comparison between transfer capacity and long and medium term offered capacities Insight on TSO actions (for example countertrading) to contain risk associated to long and medium term allocations of firm rights

Capacity calculation Costs to granting grid security –Redispatching costs for internal congestion –Counter trading and redispatching costs for interconnections –Compensations for curtailments –Compensations for auction cancellation –Capacity buying back costs –Costs sharing rules Curtailments occurred in 2008

Timetable Further observations to the report by March 13 Presentation of the report to TSOs in IG meeting on March 19 Data provided by TSOs by April 30 Approval of final report by RCC in May