Minimum Bias Trigger Scintillators (MBTS) a project of: CERN Dubna Michigan State University University of Texas-Arlington presented by J. Huston Michigan.

Slides:



Advertisements
Similar presentations
DCS meeting, CERN, 17 June 2002Børge Svane Nielsen, NBI1 Forward Detectors DCS Forward Detectors (FWD): T0- quartz Cherenkov V0 - plastic scintillator.
Advertisements

MICE Collaboration MTG IIT – Feb 2002 The Fiber Tracker Option for MICE Spectrometers The D0 Central Fiber Tracker – Experience and Implications for MICE.
Some cryostat scintillator slides for Monday’s meeting Michigan State University.
Forward scintillators in ATLAS: cryostat and MBTS CERN Dubna Michigan State University University of Texas-Arlington presented by J. Huston Michigan State.
Introduction This project used cosmic rays to test a prototype Minimum Bias Trigger Scintillator (MBTS) that will be used in the ATLAS experiment at CERN.
HCAL RBX PRR Overview Jim Freeman RBX PRR March 1-2, 2001.
R&D of Strip/Block Scintillators E.P.Jacosalem, S.Iba, N.Nakajima, H.Ono, A.L.Sanchez, A.M.Bacala & H.Miyata GLD Calorimeter Group 8 th ACFA Workshop on.
Stefano Lami 1CSN1 - Sep 24 th, 2003 CDF Preshower/Crack Detector Upgrade (CPR2) Replace old CPR and CCR (slow wire chambers) with detectors based on scintillator.
MINER A NuMI MINER A Director’s Review 10 January 2005 H. Budd Univ. of Rochester Optical Cables and Scintillator Extrusions 10 January MINERvA.
Scintillation counter installation on EBC cryostat scintillators gap scintillators location of MBTS scintillators MBTS counters will be plugged into fiber.
02/10/2004 Minimum Bias Trigger Scintillator Counters (MBTS) for early ATLAS running M.Nessi ATLAS week, Freiburg.
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
CPR2 Optical Cables Joey Huston Michigan State University …taking optical signals from edge of CPR/crack detectors to PMT boxes mounted on back of wedges.
The Tagger Microscope Richard Jones, University of Connecticut Hall D Tagger - Photon Beamline ReviewJan , 2005, Newport News presented by GlueX.
Run 2 Upgrade of the ATLAS Minimum Bias Trigger Scintillators Rachel Hyneman, College of William & Mary Advisor: Antonio Sidoti, Instituto Nazionale di.
Stefano Lami 1Rockefeller Meeting - Nov 3 rd, 2003 CDF Preshower/Crack Detector Upgrade (CPR2) Replace old CPR and CCR (slow wire chambers) with detectors.
M.Gallinaro, ``Innovative Particle and Radiation Detectors’’, Siena, October slide 1 The CDF MiniPlug Calorimeter Forward Physics Conceptual.
NuMI Schematic View of the MINOS Scintillator System 8 m Scintillator Module WLS Fibers Optical Connector Clear Fiber Ribbon Cable (2-6 m) Multiplex Box.
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
LHCC, V0, Sept The V0 detector (Mexico Lyon collaboration)  Segmentation  Simulated performances secondaries / beam-gas  Counters design 1 /
Beam test of scintillator strips Miho NISHIYAMA Shinshu University ・ scintillator strip calorimeter ・ Kuraray scintillator strips and KNU extruded ・ the.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
Status of Projectile Spectator Detector A.Kurepin (Institute for Nuclear Research, Moscow) I. Introduction to PSD. II. Conception and design. III. Development.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
Preshower/Crack Upgrade Update Detector overview 2.W electron data 3.Simulation overview 4.Early tests of new simulation.
Scintillation hodoscope with SiPM readout for the CLAS detector S. Stepanyan (JLAB) IEEE conference, Dresden, October 21, 2008.
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
The Design and Performance of the MINER A Detector Howard Budd, University of Rochester Technology and Instrumentation in Particle Physics 2011.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
Scintillating Tiles for the Muon Inner regions LHCb Muon Upgrade meeting, CERN May Wander Baldini for the Ferrara LHCb group.
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
V0L Hardware Status ALICE WEEK CERN, MARCH 2003 Ana Delia Becerril IFUNAM, México.
Mass production and mechanical structure P. Pakhlov (ITEP)
V0, jyg, ALICE week, March Preparing for the V0 TDR (Lyon-Mexico project)  The V0 detector in 3 chapters  1 - Tests and simulations of detection.
Main priorities for the next years. Where do we stand Muon system in good shape (in my opinion) – Sub-systems hardware quite robust (see later for main.
ATLAS Endcap Signal Feedthrough Project Status Report Pin carrier Procurement Summary Feedthrough Production QA/QC Shipment to CERN Reception Tests at.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
ATLAS micromegas activities (MAMMA)
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
UCSC August 12, 2008 U.S. Upgrade R&D Meeting: Strip Detector  Seiden.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
MAMUD Magnetized hadronic calorimeter and muon veto for the K +   +  experiment L. DiLella, March 29, 2005 Purpose:  Provide pion – muon separation.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
Status Report for E391a (Continuation of the previous PAC on April) G.Y.Lim IPNS, KEK Group Meeting at the JINR 26 th – 29 th July 2003 Dzhelepov Laboratory.
ATLAS Pixel Detector September 2002 N. Hartman LBNL 1 Pixel Support Tube: Cost and Production Schedule September 2002.
Coordinate Detector: prototype design General idea about the Coordinate Detector (CDET) so far: Three independent vertical planes with 15 cm plastic shield.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
GLAST LAT ProjectACD CDR January 7 & 8, 2003 Section 4 Tile Detector Assemblies 1 GLAST Large Area Telescope: AntiCoincidence Detector (ACD) WBS
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
Geoff HallLECC LHC detector upgrades Introductory comments on electronic issues Organisation of this short session.
Status of NEWCHOD E.Guschin (INR), S.Kholodenko (IHEP), Yu.Kudenko (INR), I.Mannelli (Pisa), O.Mineev (INR), V.Obraztsov (IHEP), V.Semenov(IHEP), V.Sugonyaev.
FORWARD ATLAS {major contributions from Per Grafstrom (CERN), Michael Rijssenbeek (Stonybrook), Brian Cox (Manchester} Andrew Brandt Luminosity measurement.
Faculty of Physics, University of Belgrade Collaboration meeting CERN, 24 th of September 2015 ToF-LR status and future Jovan Puzović, Faculty of Physics,
TDAQ and L1Calo and Chamonix (Personal Impressions) 3 Mar2010 Norman Gee.
Baby MIND Scintillator modules 11 November 2015 Revision E. Noah.
USTileCal Planning UTA ITC Scintillator Project R. Miller May 13, E3 C10 B11 E1 D5 A14 - A15 B14 D6 A D4 A12 A13 B12 - B
SuperB meeting, Frascati
Backward Calorimetry For SuperB
Design of the He and HB ODU
UK CMS Oversight Committee Mtg
Quad-calorimeter for KLOE-2
Presentation transcript:

Minimum Bias Trigger Scintillators (MBTS) a project of: CERN Dubna Michigan State University University of Texas-Arlington presented by J. Huston Michigan State University (apologies: some useful drawings captive on laptop, in for repairs)

MBTS counters 2 segments in  ; inner segment covers pixel detectors

Readout Scintillator is polystyrene- based, 2 cm thick Readout is by WLS fibers running along division between L/R scintillator segments plus through sigma grooves in scintillator Struggle to be able to trigger on MIP’s  increase light yield using every trick we know Will also crank up HV to 900 V WLS fibers welded to clear fibers to produce a pigtail which will mate into 1/8 of cryostat scintillator optical connections  after commissioning cryostat detectors will be re-connected

Scintillator Scintillator has been produced by Dubna  same scintillator as used for CDF central pre-radiator upgrade  currently at CERN, awaiting shipment to MSU later this week  ~2.5 month delay…  …construction will still be complete in September  will continue to test counters using ATLAS electronics readout chain at the U. of Chicago  …and installation will take place this fall/winter

Preliminary mounting scheme …making use of mounting holes in cryostats

New decision MBTS scintillator and boronated polyethylene moderator will be mounted together in same can  MBTS counters are never removed; they just slowly die but continue to moderate Moderator has to be machined back to 30 mm  currently looking for vendor  envelope of MBTS + moderator is 57 mm

New drawings of moderator + MBTS …still have to be approved

MBTS drawings

Installation work This fall/winter, the gap and cryostat scintillators will be installed on EBA and EBC  maybe delay in current schedule, but roughly Nov and Jan During these times, teams from the institutions listed on front page will be at CERN and will also work on installation of MBTS counters + moderator  working with shielding group  all details not worked out yet, but Ron Richards is at CERN for next few weeks to coordinate  installation is designed to be relatively straightforward