Assessment of Systems Effort Factors Functionality Impact Factors Functionality Interface Usability What it does Collection Value to task Effectiveness.

Slides:



Advertisements
Similar presentations
Focusing an Evaluation Ben Silliman, Youth Development Specialist NC 4-H Youth Development.
Advertisements

A small taste of inferential statistics
Intelligence Step 5 - Capacity Analysis Capacity Analysis Without capacity, the most innovative and brilliant interventions will not be implemented, wont.
Donald T. Simeon Caribbean Health Research Council
Dr. G. Johnson, Sampling Demystified: Sample Size and Errors Research Methods for Public Administrators Dr. Gail Johnson.
BPS - 5th Ed. Chapter 241 One-Way Analysis of Variance: Comparing Several Means.
Michelle O’Reilly. Quantitative research is outcomes driven Qualitative research is process driven Please offer up your definitions.
Copyright © 2009 Pearson Education, Inc. Chapter 29 Multiple Regression.
G. Alonso, D. Kossmann Systems Group
Evaluating Decision Support Systems Projects. Who Evaluates Technical Managers  Chief Information Officer,  Corporate IT professionals,  Database administrators,
Review: What influences confidence intervals?
Confidence Intervals for
1 Analysis of Variance This technique is designed to test the null hypothesis that three or more group means are equal.
Chapter 7 Sampling and Sampling Distributions
Power Analysis for Correlation & Multiple Regression Sample Size & multiple regression Subject-to-variable ratios Stability of correlation values Useful.
© 2003 Prentice-Hall, Inc.Chap 14-1 Basic Business Statistics (9 th Edition) Chapter 14 Introduction to Multiple Regression.
1 Software Testing and Quality Assurance Lecture 15 - Planning for Testing (Chapter 3, A Practical Guide to Testing Object- Oriented Software)
Heuristic Evaluation IS 485, Professor Matt Thatcher.
QM Spring 2002 Business Statistics Sampling Concepts.
1 Psych 5500/6500 The t Test for a Single Group Mean (Part 5): Outliers Fall, 2008.
Testing and Modeling Users Kristina Winbladh & Ramzi Nasr.
Part III: Inference Topic 6 Sampling and Sampling Distributions
Determining the Size of
Personal Software Process Overview CIS 376 Bruce R. Maxim UM-Dearborn.
Quality Improvement Prepeared By Dr: Manal Moussa.
Marshall University School of Medicine Department of Biochemistry and Microbiology BMS 617 Lecture 10: Survival Curves Marshall University Genomics Core.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 17 Slide 1 Extreme Programming.
Standard Error and Research Methods
Are the results valid? Was the validity of the included studies appraised?
Needs Analysis Session Scottish Community Development Centre November 2007.
Modeling.
IR Evaluation Evaluate what? –user satisfaction on specific task –speed –presentation (interface) issue –etc. My focus today: –comparative performance.
Extreme/Agile Programming Prabhaker Mateti. ACK These slides are collected from many authors along with a few of mine. Many thanks to all these authors.
Using Needs Assessment to Build A Strong Case for Funding Anna Li SERVE, Inc.
Time Management Personal and Project. Why is it important Time management is directly relevant to Project Management If we cannot manage our own time.
1 MARKETING RESEARCH Week 5 Session A IBMS Term 2,
Chapter(3) Qualitative Risk Analysis. Risk Model.
Copyright © 2014 by The University of Kansas Developing and Using Criteria and Processes to Set Priorities.
Copyright © 2012 Pearson Education. All rights reserved © 2010 Pearson Education Copyright © 2012 Pearson Education. All rights reserved. Chapter.
What Is Statistics Chapter 01 McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved.
12/10/15.  It is a Cross Life Cycle Activity (CLCA) that may be performed at any stage ◦ In fact, some part of it (e.g. risk analysis and management)
Data Analysis: Quantitative Statements about Instrument and Method Performance.
Software Architecture Evaluation Methodologies Presented By: Anthony Register.
Course summary TDT4235 Tor Stålhane IDI / NTNU. What we try to do QA – Create trust to a product or service SPI – Solve fuzzy problems by –Identifying.
Presenting and Analysing your Data CSCI 6620 Spring 2014 Thesis Projects: Chapter 10 CSCI 6620 Spring 2014 Thesis Projects: Chapter 10.
Chapter 12 Confidence Intervals and Hypothesis Tests for Means © 2010 Pearson Education 1.
ANALYSIS 1 WEEK 2. WHY ANALYZE? to determine what the root cause is between the way things are and they way they should/could be. ADDIE Model Explained.
Information and Decision Making
CS223: Software Engineering Lecture 2: Introduction to Software Engineering.
Course: Research in Biomedicine and Health III Seminar 5: Critical assessment of evidence.
Risk Adjusted X-bar Chart Farrokh Alemi, Ph.D. Based on Work of Eric Eisenstein and Charles Bethea, The use of patient mix-adjusted control charts to compare.
The accuracy of averages We learned how to make inference from the sample to the population: Counting the percentages. Here we begin to learn how to make.
Building Valid, Credible & Appropriately Detailed Simulation Models
HW 23 Key. 24:41 Promotion. These data describe promotional spending by a pharmaceutical company for a cholesterol-lowering drug. The data cover 39 consecutive.
 Define and recognize risk  Define the contents of a risk management plan  Conduct a risk identification and prioritization process  Define.
Sampling and Sampling Distribution
Chapter 14 Introduction to Multiple Regression
Confidence Intervals for Proportions
Imran Hussain University of Management and Technology (UMT)
Unit 5: Hypothesis Testing
Statistics: The Z score and the normal distribution
Systems Analysis and Design
MTM Measurement Initiative
The Importance of Project Risk Management
Software Reliability Models.
Significance Tests: The Basics
Histograms: A Valuable Tool for Quality Evaluation
Chapter#8:Project Risk Management Planning
Extreme Programming.
Chapter#8:Project Risk Management Planning
Presentation transcript:

Assessment of Systems Effort Factors Functionality Impact Factors Functionality Interface Usability What it does Collection Value to task Effectiveness

What is a “task” Generally -- a family of related problems generally a group of users possibly a specific organization VALUE –to the individuals (e.g. One physician) –to the organization (e.g her hospital) –to the larger goals (e.g. A hospital serves health to the patients and the community)

What is a task COST –to an individual (the physician’s time; money) –to an organization (system; building, maintenance; organizational costs -- learning; training; disruption of established patterns) –to the larger or ultimate unit ( the patient; the community). These costs and values produce at least 3 separate decision models. (More if we cross layers).

3 Layers of assessment Individual. Benefit vs Effort. Is it larger with system (method) A than B? May not be enough to decide. Perhaps A gives more benefit, and takes more time: A B Slope is benefit:cost ratio

Why benefit, and even cost/benefit is not enough Organization may not be able to spend this much time on each patient. Now if A delivers nothing until you have spent the time, then you can not afford it unless you are willing to skip some cases completely. This decision has to be made already at the individual user level. But user may be willing to skip some (hand off).

Multiple levels But organization has no way to cover the excess. So may mandate use of faster, poorer, lower benefit/cost system. Other stakeholders (patient, society) may not value the cases in the same way. –Patient: put me (my child, etc.) ahead of others –Society: change organization model to remove constraint.

“Learning Curve” Power of a system increases with experience and knowledge. Often high costs at start up. Money, time, and human factors.

Estimating system quality Case study method -- system in use for a particular major project. Attempt to estimate contribution of system to success of project. Not a quantitative measure. Interviews, judgements, what-if scenarios. Statistical, sampling method. Find small examples of the key task. Assess system performance on each one. Report mean and variation.

Mean and Variation Requires a numerical (interval or ratio scale) measure. Examples: time to completion; number of good documents recovered; precision ratios, recall ratios; user error rates;... Use standard techniques (e.g. A spreadsheet) to estimate average and amount of variation.

Simple summary statistics

Put it all together Assemble representative (similar) tasks Gather interview qualitative information about the process; affective aspects; goals Agree upon a few measures of performance that relate to those goals. Measure the performance on a large enough set of similar tasks.

Reporting out the results Report and interpret the summary statistics. –(p-values; sampling effects;) –example: (interpretation 3) “there is less than 0.7% chance that the two sets of times are produced by systems whose performance is actually the same. Difference is in both the mean and the variation or standard deviation” Report and interpret the study as a whole. (cont.)

Reporting (2) Case 1. The mean is what matters: Clearly system (B) is better, taking almost a full minute less on every single task (suppose these are measured in minutes).

Reporting (3) Case 2. The uniformity is what matters. System B is not acceptable because there is so much variation in how long it takes, and we cannot accept + a full hour (suppose measured in hours) for this information problem. If we know how long it takes, we can plan. But we can’t handle variation. So the faster system here is not better.

Reporting (4) Compare performance to cost. If the systems have same costs, we can stop with the preceding. If they are different we need to look at the Performance-Cost plot, and discuss the importance of the two aspects. Consider the reality of change, for the individuals, and for the organization. Seek methods to enhance training, ownership and “buy-in”.

Reporting (5) Recognize that systems in an organization are no longer static. They are changes that are part of a larger change process. Be sensitive to the issues in managing change. Do not focus too narrowly on the technical aspects of the system. Do not focus too broadly, assuming that technical aspects make no difference.