Team 5 Prototype Fabrication, Economic and Test Plan QDR Presented By: Maria Mullins Charles Stangle.

Slides:



Advertisements
Similar presentations
Group 3 Heavy Lift Cargo Plane
Advertisements

Daniel Graves –Project Lead James Reepmeyer – Lead Engineer Brian Smaszcz– Airframe Design Alex Funiciello – Airfoil Design Michael Hardbarger – Control.
Propulsion PDR 1 Team 1 September 21, 2006.
The Black Pearl Design Team: Ryan Cobb Jacob Conger Christopher Cottingham Travis Douville Josh Johnson Adam Loverro Tony Maloney.
Group 3 Heavy Lift Cargo Plane William Gerboth, Jonathan Landis, Scott Munro, Harold Pahlck February 18, 2010.
1 Design Group 2 Kat Donovan - Team Leader Andrew DeBerry Mike Kinder John Mack Jeff Newcamp Andrew Prisbell Nick Schumacher Conceptual Design for AME.
Dane BatemaBenoit Blier Drew Capps Patricia Roman Kyle Ryan Audrey Serra John TapeeCarlos Vergara Critical Design Review Team 1.
Christopher Cottingham
Vehicle Sizing PDR Presented by: Mark Blanton Chris Curtis Loren Garrison September 21, 2000 Chris Peters Jeff Rodrian DR2.
October 30, 2001A&AE Fall, Critical Design Review Brian Barnett Rob Benner Alex Fleck Ryan Srogi John Keune.
DR2 Propulsion PDR I Preliminary Design Review II October 17, 2000 Presented By: Mark Blanton Team DR2 Chris Curtis Loren Garrison Chris Peters Jeff Rodrian.
Prototype Fabrication, Economic, & Test Plan QDR Tung Tran Matt Drodofsky Haris Md Ishak Matt Lossmann Purdue University AAE 451 Fall 2006 Team 4 Mark.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
SAE Heavy Lift Cargo Plane Advisor: Siva Thangam Group Members: Will Gerboth Jon Landis Scott Munro Harold Pahlck.
Over view Landing Gear Landing Gear Weight Determination Weight Determination Geometric Layout of Wing Structure Geometric Layout of Wing Structure Analysis.
March 22, Prototype Fabrication Economic & Test Plan QDR Michael Caldwell Jeff Haddin Asif Hossain James Kobyra John McKinnis Kathleen Mondino Andrew.
Dane BatemaBenoit Blier Drew Capps Patricia Roman Kyle Ryan Audrey Serra John TapeeCarlos Vergara Team 1: Propulsion QDR 2 Team 1 October 3, 2006.
Propulsion PDR 2 Team Boiler Xpress Michael VanMeter Oneeb Bhutta Matthew Basiletti Ryan Beech October 17, 2000.
Team 5 Structures PDR Presented By: Ross May James Roesch Charles Stangle.
Group 13 Heavy Lift Cargo Plane Stephen McNulty Richard-Marc Hernandez Jessica Pisano Yoosuk Kee Chi Yan Project Advisor: Siva Thangam.
Model Aircraft Tools, Materials, and Techniques. Open Structure with Iron-on Film Covering.
Final Fall 2010 Presentation November 30, 2010 Team # 3 Erica Cosmutto Hunter Metzger Joel Ware Kristina De Armas Michael Isaza Santiago Baus.
[SAE Heavy Lift Cargo Plane] Joe Lojek : James Koryan : Justin Sommer : Ramy Ghaly [Ducks on a Plane] : Advisor Professor Thangam : Thursday, February.
TEAM 1: ON WINGS LIKE A PENGUIN ENGINEERING 339 – SENIOR DESIGN.
John Wloch Wind-Aid Preliminary Design Review 11 March 2008.
MAE Team Members: Timothy Bernadowski Michael Beyrodt Brandon Snyder Brian Johnson Joe Hopkins Ryan Turne r Samuel Brooks MAE Advisors: Dr. Ayodeji Demuren.
Flapping Wing MAV Group 13 – NASA Ames Parker Cook George Heller Joshua Nguyen Brittney Theis.
Team 5 Critical Design Review Trent Lobdell Ross May Maria Mullins Christian Naylor Eamonn Needler Charles Reyzer James Roesch Charles Stangle Nick White.
Buoyancy Analysis Inputs:. Buoyancy Mechanical Design Johnson Electric Motor (12V) –High rpm (16,000 –Lightweight (7.50 oz per motor) Alexander.
Order of Presentation David – Intro and Fall Review Matt – Testing and Summary of Changes Josiah – Details on New Design Josh – Electrical Hardware Ona.
Team 6: “Soldier Portable UAV” David Neira TJ Worden Matthew Martin Joshua Mellen Ona Okonkwo Josiah Shearon A IR HERCULES 1.
University of Washington Seattle, WA ISR 10. Hull.
Buoyancy Analysis Inputs:.
Dane Batema John Tapee Audrey Serra Patricia Roman Kyle RyanCarlos Vergara Benoit BlierDrew Capps Team 1: Lessons Learned and Vehicle Summary Team “Canard”
The Lumberjacks Team /16/12 Brian Martinez.
Interim Design Review Group 13 – Flapping Wing MAV NASA Parker Cook George Heller Joshua Nguyen Brittney Theis.
AAE 451 Aircraft Design First Flight Boiler Xpress November 21, 2000
Team 5 Vehicle Propulsion QDR 2 Presented By: Maria Mullins James Roesch.
Final Design Team 6 December 2 nd, UAV Team Specializations David Neira – Power & Propulsion Josiah Shearon – Materials Selection & Fabrication.
P07108: METEOR Instrumentation Recovery System. Team Bash Nanayakkara – Project Manager (ISE) Scott Defisher – Fuselage Design (ME) Mike Kochanski – Software.
Team 5 Design Concept Selection Trent Lobdell Ross May Maria Mullins Christian Naylor Eamonn Needler Charles Reyzer James Roesch Charles Stangle Nick White.
Interim Design Review AUVSI 2013 Student Unmanned Air Systems Competition Team 6: Autonomous Ariel Vehicle Robert Woodruff Matthew Yasensky Cristopher.
DR1 PF, E, & FTP PDR Prototype Fabrication, Economic and Flight Test Plan Preliminary Design Review October 26, 2000 Presented By: Mark Blanton & Chris.
Dane BatemaBenoit Blier Drew Capps Patricia Roman Kyle Ryan Audrey Serra John TapeeCarlos Vergara Team 1: Prototype Fabrication, Economic, & Test Plan.
Remote control steering Considering a normal configuration of the airship like in the picture below:
Eric McDonald Drew Krutak Jeremy Hanneman. Our objective was to design and fabricate a High-Speed Treadmill that is capable of measuring the horizontal.
Yaqoub Almounes John Cowan Josh Gomez Michael Medulla Mohammad Qasem
Vehicle Sizing AAE 451: Team 2 Michael Caldwell Jeff Haddin
Sae – aero micro capstone
Sae – aero micro capstone
AAE 451 Team 3 Critical Design Review
Propulsion QDR 2 Team #3 Presented by: Greg Davidson Etan Karni.
Team 5 Final Design Review
Structures and Weights 1 QDR
Project Plan Review Team “Canard” September 14th, 2006 Team 1:
Team 5 Final Design Review
Team 5 Project Plan Review
Propulsion QDR 2 Team #3 Presented by: Greg Davidson Etan Karni.
Structures Overview Material Properties Structures Construction
Team 5 Vehicle Propulsion PDR 1
Team 5 Vehicle Propulsion PDR 1
John Apostol, Chris Grupido, Douglas Klutzke
Fabrication, Economics and Test Plan QDR
Presented by Melissa Doan and Jason Hargraves
Prototype Fabrication, Economic, & Test Plan QDR
Prototype Fabrication, Economic, & Test Plan QDR
Ground & Flight Control Preliminary Design Review
Structures and Weights 1 QDR
CDR: Aether “Angry Mosquito”
Managerial REVIEW UAV AIRFRAME B
Presentation transcript:

Team 5 Prototype Fabrication, Economic and Test Plan QDR Presented By: Maria Mullins Charles Stangle

2 AAE 451 – Team 5 March 22, 2005 Outline Aircraft Characteristics Overall Schedule Economic Plan Flight Test Plan

3 AAE 451 – Team 5 March 22, 2005 Aircraft Characteristics Wing Span: ft Estimated Weight: lb Neutral Point: ft Center of Gravity: ft Static Margin: 0.150

4 AAE 451 – Team 5 March 22, 2005 Overall Schedule To be accomplished before 1 st flight Order parts – March 10 Build prototype wing – March 11 Test prototype strength – March 22  CDR – March 24  CNC Parts – by March 28  Fiberglass Parts – by April 3  Build – by April 7  Test and Rebuild – until flight date

5 AAE 451 – Team 5 March 22, 2005 Economic Plan – Materials Team 5 Budget Items ItemDescriptionVendorItem #QtyCostTotal Cost Fiberglass1039 Microglass ClothTower HobbiesMIDR60391$8.59 Epoxy200 Epoxy Finishing ResinTower HobbiesNHPR20221$8.59 Wire18 Ga. Galvanized Steel WireLowes629331$1.97 EPS Foam4'x8' sheet of EPS blue foamLowes 1$21.00 Carbon Fiber Rods.25" diameter carbon fiber rods 37"graphitestoreAE $30.45 Aluminum Sheet8"x18".025" thick sheetLowes $7.99 Landing Gear (Wheels)Pair of 1.5" foam wheelsTower HobbiesLXB9041$4.29 Landing Gear (Wheels)Pair of ultralight thin wheelsTower HobbiesLXHJA01$1.00 PropellerCOX 6x3 Nylon PropellerTower HobbiesLXB4831$2.89 PropellerPE06040E 6x4E Thin Electric PropHobby-LobbyPE06040E1$2.50 PropellerCOX 5x3 3-blade Nylon Pusher PropellerTower HobbiesLXB4861$2.89 Servo TapeDouble sided tape.5"x3'Tower HobbiesLXK1991$1.59 Hinge PointsSmall Pivot Hinge points (15)Tower HobbiesLXK1161$3.49 Push Rod kitMicro Aileron System (2)Tower HobbiesLXDCT51$4.79 Extra HornsMicro Control Horns (2)Tower HobbiesLXAZC11$0.95 Extra Kwik LinksNylon Kwik Links 2mm (2)Tower HobbiesLSD8901$0.85 Pushrod ExitsHooded Pushrod Exits (2)Tower HobbiesLXK0612$1.09$2.18 Servo Extension CordHobbico Extension 24" JR/S/ZTower HobbiesLSL2982$4.99$9.98 TOTAL$115.99

6 AAE 451 – Team 5 March 22, 2005 Economic Plan – Electronics Total Materials/Electronics Cost: $ Purdue Budget Items Y- harnessHobbico Y-Harness Futaba JTower HobbiesLXL3071$9.99 ServosFutaba S3108 Servo Micro 7.6gTower HobbiesLXFKZ94$19.99$79.96 Receiver Hitec Electron 6-Channel FM Receiver Fut J/HitecTower HobbiesLXCXM81$54.99 GyroFutaba GYA350 Gyro Aircraft Single ServoTower HobbiesLXXF871$ MotorGraupner Speed 400 6V Direct Drive MotorHobby-LobbyGR33211$9.50 Speed ControlJETI 12 Amp Microprocessor Motor ControllerHobby-LobbyJES0121$35.40 Batteries Thunder Power 2100mAh 3-Cell 11.1V LIPO, 16GARC HOBBIES THP2100 3S 1$77.99 Total$392.82

7 AAE 451 – Team 5 March 22, 2005 Economic Plan – Flight Test Flight Testing Cost  5 hours is a conservative estimate  Allows for extra time to deal with problems  (8 Men + 1 Woman) X 5 Hours = 45 Person-Hours

8 AAE 451 – Team 5 March 22, 2005 Economic Plan – Prototype Fabrication Foam – “Borrowed” Fiberglass Sample - $4 Epoxy/Vacuum Bag/Bleeder Cloth/Breather Cloth – Also “Borrowed” 2 MEN X 5 Hours = 10 MAN-Hours Passing Senior Design – Priceless

9 AAE 451 – Team 5 March 22, 2005 Economic Plan – Total Person-Hours So Far – 1100 Person-Hours CNC and Fiberglass –  10 Hours X 2 People = 20 Person-Hours System Integration –  10 Hours X 9 People = 90 Person-Hours Pilot Cost – 2 Hours

10 AAE 451 – Team 5 March 22, 2005 Economic Plan – Total Cost 1222 Person-Hours X $50 per Hour = $61100 Total Material and Prototype Cost – $ Total R&D and Manufacturing Cost – $61,608.80

11 AAE 451 – Team 5 March 22, 2005 Test Plan Test Attachments Test Motor Test Servos/Electrical Connections Drop Test/Test Landing Gear Flight Test –in Mollenkompf if available

12 AAE 451 – Team 5 March 22, 2005 Flight Test Take-off and Climb Unpowered Glide Turning Flight/Gyro Control Propeller Optimization Testing  Purchased 3 possibilities

13 AAE 451 – Team 5 March 22, 2005 Questions?