LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI1 Status of the FMD LHCC referees meeting, 10 October 2005 Børge Svane Nielsen Niels Bohr.

Slides:



Advertisements
Similar presentations
Present Assembly Status Three important milestones completed: – We tried the entire assembly procedure on real modules and it worked – The construction.
Advertisements

CR7-FMD, 19 March 2007Jens Jørgen Gaardhøje, Niels Bohr Institute 1 Forward Multiplicity Detector FMD 1 FMD 3 FMD 2 Outer ring Inner ring.
TPC meeting, Sardinia, May 2004Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, Sardinia, May 2004 Børge Svane Nielsen Niels Bohr.
Thermal simulation, CERN, 11 Nov 2002Børge Svane Nielsen, NBI1 FMD: Silicon multiplicity detectors Thermal simulation meeting, CERN, 11 November 2002 Børge.
Danish Teachers, CERN, 23 Oct 2007Børge Svane Nielsen, NBI1 The primordial ’soup’ of QUARKS and GLUONS Can we make and study it on earth? M. Turner Natl.
TPC meeting, GSI, 2-3 June 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, GSI, 2-3 June 2003 Børge Svane Nielsen, Jørn Westergaard Niels.
DCS meeting, CERN, 17 June 2002Børge Svane Nielsen, NBI1 Forward Detectors DCS Forward Detectors (FWD): T0- quartz Cherenkov V0 - plastic scintillator.
Technical Forum, 8 March 2007Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute FMD 1 FMD 3 FMD 2 Outer ring Inner ring.
Forward Detector Meeting, 11 Mar 2003Børge Svane Nielsen, NBI1 Si-FMD status Forward Detector meeting, CERN, 11 March 2003 Børge Svane Nielsen Niels Bohr.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
TPC meeting, NBI, 2-3 September 2002Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, Copenhagen, 2-3 September 2002 Børge Svane Nielsen, Jørn.
Technical Board, 18 September 2002Børge Svane Nielsen, NBI1 Laser rays on TPC mylar strips Technical Board, 18 September 2002 Børge Svane Nielsen and Jørn.
TPC meeting, CERN, 7-8 October 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, 7-8 October 2003 Børge Svane Nielsen, Niels Lindegaard,
8-3-05Jens Jørgen Gaardhøje. NBI. ALICE-CR5 1 ALICE Forward Detectors Technical Design Report Editorial team: I.G. Bearden (NBI) H. Bøggild (NBI) C.Holm.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Silicon Preshower for the CMS: BARC Participation
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
128 September, 2005 Silicon Sensor for the CMS Tracker The Silicon Sensors for the Inner Tracker of CMS CMS Tracker and it‘s Silicon Strip Sensors Radiation.
For high fluence, good S/N ratio thanks to: Single strip leakage current I leak  95nA at T  -5C Interstrip capacitance  3pF SVX4 chip 10 modules fully.
DPG 2001 Frank Hartmann (IEKP) P-irradiated-oxygenated Non-irradiated-oxygenated Non-irradiated-non-oxygenated P-irradiated-non-oxygenated sensors put.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz SLAC LCWS05 July 28-31, 2004.
27 th May 2004Daniel Bowerman1 Dan Bowerman Imperial College 27 th May 2004 Status of the Calice Electromagnetic Calorimeter.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
Andrea Giammanco CMS Tracker Week April DS ROD Prototype: “final” optohybrids “final” CCUM integrated in the rod with new FEC_to_CCUM adapter (Guido.
Abraham Gallas (USC-IGFAE) Strips and Pixels for the VELO upgrade.
Sensors for CDF RunIIb silicon upgrade LayerR min (cm)1 MeV eq-n cm * * * * * *10.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
Silicon Stripixel Detector Junji Tojo RIKEN Vertex2005 Lake Chuzenji, Nikko, Japan November 7-11, 2005.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
ALICE Si-FMD,T0,V0 26/ Jens Jørgen Gaardhøje, NBI, Si-FMD oUpdate on Status oConceptual design of FEE and BEE-DAQ chain oTimetable.
LHCf Arm2 – status of hardware upgrade in Firenze Lorenzo Bonechi 20 December 2013.
1 SiLC sensors for the LP-TPC Thomas Bergauer Institute for High Energy Physics (HEPHY) Austrian Academy of Sciences, Vienna for the SiLC Collaboration.
ALICE Rad.Tolerant Electronics, 30 Aug 2004Børge Svane Nielsen, NBI1 FMD – Forward Multiplicity Detector ALICE Meeting on Rad. Tolerant Electronics CERN,
LCFI Collaboration Status Report LCUK Meeting Oxford, 29/1/2004 Joel Goldstein for the LCFI Collaboration Bristol, Lancaster, Liverpool, Oxford, QMUL,
Montpellier, November 12, 2003Vaclav Vrba, Institute of Physics, AS CR 1 Vaclav Vrba Institute of Physics, AS CR, Prague CALICE ECal Status Report.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
The ALICE Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr Institute for the ALICE Collaboration.
29/ Jens Jørgen Gaardhøje, NBI, Forward Detectors TDR FMD, T0, V0 Editorial team: I.G. Bearden (NBI) H. Bøggild (NBI) C.Holm (NBI)
Technical Board Meeting, 14/06/07 Kristján Gulbrandsen, NBI 1 Progress on and Status of the Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr.
8 July 1999A. Peisert, N. Zamiatin1 Silicon Detectors Status Anna Peisert, Cern Nikolai Zamiatin, JINR Plan Design R&D results Specifications Status of.
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
Ronald Lipton Layer 0 Status PMG Sep Status of the Layer 0 Project – emphasis on hardware status, preproduction, and preparations for shutdown work.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
At the HERA collider in Hamburg an experiment (ZEUS) has been built to study electron-proton collisions. For the near future an upgrade of this experiment.
CBM Silicon Tracking System. Microstrip Detector Module Assembly and Test V.M. Pugatch Kiev Institute for Nuclear Research GSI (CBM experiment), Darmstadt.
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
26 June 2006Imaging2006, Stockholm, Niels Tuning 1/18 Tracking with the LHCb Spectrometer Detector Performance and Track Reconstruction Niels Tuning (Outer.
Solid State Detectors for Upgraded PHENIX Detector at RHIC.
Si sensors for LumiCal Wojciech Wierba Institute of Nuclear Physics PAN Cracow, Poland FCAL Workshop, LAL Orsay,
11 June 2015 Thomas Bergauer (HEPHY Vienna) Belle II SVD beam Test SPS 2015 SPS users meeting.
- Performance Studies & Production of the LHCb Silicon Tracker Stefan Koestner (University Zurich) on behalf of the Silicon Tracker Collaboration IT -
CBM Silicon Tracking System. First results of the detector module pre-prototype test. V.M. Pugatch Kiev Institute for Nuclear Research 11 th CBM Collaboration.
WG3 – STRIP R&D ITS - COMSATS P. Riedler, G. Contin, A. Rivetti – WG3 conveners.
A New Inner-Layer Silicon Micro- Strip Detector for D0 Alice Bean for the D0 Collaboration University of Kansas CIPANP Puerto Rico.
T2 GEM Production in Helsinki Kari Kurvinen TOTEM T2 EDR meeting Radiation Detector Laboratory of Helsinki Institute of Physics (HIP) and Department.
MICRO-STRIP METAL DETECTOR FOR BEAM DIAGNOSTICS PRINCIPLE OF OPERATION Passing through metal strips a beam of charged particles or synchrotron radiation.
Panja Luukka. Silicon Beam Telescope (SiBT) Group Since 2007 a collaboration of several CMS institutes has been operating a silicon micro-strip beam telescope.
Sensors Pixel dimension 300 x 300 μm2 Standard p-in-n sensors
Detector building Notes of our discussion
FCAL R&D towards a prototype of very compact calorimeter
Christoph Schwanda (HEPHY Vienna) For the Belle II SVD group
Børge Svane Nielsen/JJG
detector development readout electronics interconnects bump bonding
SIT AND FTD DESIGN FOR ILD
Planar Edgeless Silicon Detectors for the TOTEM Experiment
prototype PCB for on detector chip integration
Charge measurement of STK
Development of thin GEM readout structures
Setup for testing LHCb Inner Tracker Modules
Presentation transcript:

LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI1 Status of the FMD LHCC referees meeting, 10 October 2005 Børge Svane Nielsen Niels Bohr Institute

LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI2 Prototype status Hamamatsu sensor prototype: well within specs → Inner production started, delivery end November → Outer design done, prototype ordered IDEAS inner hybrid prototype: VA1_3 chips within specs, all produced → 2nd hybrid prototype delivered and tested → Hybrid production starting Prototype module (sandwich) status: MIP particles seen (680 MeV e-) Noise level as expected or better → 2nd prototype tested in e- beam early October Readout electronics status: → Prototype VA1-Digitizer-RCU chain working Mechanics: → TPC-ITS-T0-V0-FMD assembly test done

LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI3 Silicon sensors 13cm Bonding pads Leakage current (specs < 3 μA) Detector capacitance 300 nA 2 nF Bias voltage 300 V Bias voltage 300 V Inner prototype: 300 μm thick 2 x 512 strips 250 μm pitch

LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI4 Prototype module  3 prototype inner detector sandwich modules built: Hybrids glued to sensors with thin ceramic spacers Readout pads bonded to silicon at periphery of hybrid hybrid sensor bonds

LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI5

LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI6 Beam test of modules 680 MeV e - beam test at ASTRID ring at Aarhus University, DK FMD module e - beam

LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI7 Noise estimate Noise SourceShort strips (14 mm) Long Strips (50 mm) Elect. + cap. 263 e e - Bias  208 e - I leak 47 e - 88 e - Total 338 e e - Signal (1 MIP)22000 e - Signal/Noise Inner sensor noise estimate

LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI8 Test beam results, July  Tested prototype with high energy electron beam (680 MeV)  Clear signal peak  Signal/Noise  60

LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI9 Test beam results, October S/N=56 S/N=47 S/N=56 S/N=58

LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI10 Read-out electronics Lab test with sandwich and prototype Digitizer+RCU readout Good progress with prototype Digitizer and USB version of RCU - prototype Digitizer card + firmware built - complete Digitizer+RCU chain works - first beam tests with full electronics chain successfull - preparing for final version RCU Digitizer

LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI11 Integration test Installation of FMD3 and FMD2 together with ITS, etc. Beam pipe support

LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI12 Conclusions  FMD prototype modules show excellent signal to noise characteristics (  60:1).  Hit sharing accounts for most of the particles seen between the MIP peak and the noise peak.  Production of inner sensors and hybrids started.  Final design of outer module, digitizer and mechanics progressing well.