Molly, Gwyn, Sam, and Eric.  We got the Reflow oven to work- time to test it  Eric wrote MUX code- it compiles  Sam started on little PCB (PIC, connector,

Slides:



Advertisements
Similar presentations
BTEC First Engineering
Advertisements

Nickolas Potvin Advisors: Professors Hedrick, Cass, and Fernandes.
Molly, Gwyn, Sam, and Eric.  Sam will have soldered all parts onto our PCB so that we can test it at the meeting  Eric finished MUX code in PIC C and.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Thermo-Cooler Controller Kiefer, Mary, Molly, Sam.
I-heliostat 6/15 update Amy Whitcombe, Kendall Pletcher, Eric Kolker, Kiefer Hicks.
Molly, Gwyn, Sam, and Eric.  Do we need mounting holes for the main PCB? How many?  What are our options for heat sinking converters? Should we use.
Molly, Gwyn, Sam, and Eric. Build a robust low voltage converter from an unregulated 28V supply with a user-friendly command tester that displays relevant.
Thermo-Cooler Controller Kiefer, Mary, Molly, Sam.
Molly, Gwyn, Sam, and Eric.  The EAGLE has landed- Keith bought us the version we need for a single user ($1500) and it’s now on Eric’s computer  All.
Thermo-Cooler Controller Kiefer, Mary, Molly, Sam.
Molly, Gwyn, Sam, and Eric.  Fixed temperature sensor circuit- it works!  Successfully soldered a surface mount current sensor and tested it on a breadboard.
Molly, Gwyn, Sam, and Eric.  We ordered everything we need to make a first prototype (1 or 2 extras of all components)  Spent $775 on Digikey (includes.
Molly, Gwyn, Sam, and Eric.  Tested and analyzed enough of our system to make sure that it will work  Finished thermal testing of one of our converters.
A Solder Reflow Oven Dylan Gifford David Cobler. A typical $30,000 Reflow Oven Solder Paste Surface Mount Technology.
Thermo-Cooler Controller Kiefer, Mary, Molly, Sam.
Molly, Gwyn, Sam, and Eric.  We’ll need 2 PCBs  The main board will have all the converters, current and temperature monitors, and MUXs  The second.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Molly, Gwyn, Sam, and Eric.  What are you expecting as a final result? Our current understanding is that we’re making a system that takes in a variable.
LAr ROD Status Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Laurent, Eric, Jean-Pierre, Gilbert,... ATLAS Geneva DPNC January 12 th, 2005.
Thermo-Cooler Controller Kiefer, Mary, Molly, Sam.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Molly, Gwyn, Sam, and Eric. Build a robust low voltage converter from an unregulated 28V supply with a user-friendly command tester that displays relevant.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Molly, Gwyn, Sam, and Eric.  We had assumed that components should have a rated current no more than mA above the requirement.  Fred says that.
Saturday May 02 PST 4 PM. Saturday May 02 PST 10:00 PM.
Molly, Gwyn, Sam, and Eric.  The 5V CC-E series converters that we got can output +6 and –6V! All our converters (except perhaps those powering op amps)
Molly, Gwyn, Sam, and Eric.  Configure DACs to have their digital input set to zero (2.5V) when they receive power  Ramp up to higher voltage at a “user.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Thermo-Cooler Controller Kiefer, Mary, Molly, Sam.
Molly, Gwyn, Sam, and Eric.  I 2 C means inter-integrated circuit bus; it’s a way to communicate between components on the same board  Slower than SPI.
Molly, Gwyn, Sam, and Eric.  We ed Fred asking about connectors and EAGLE  Sam is set up to conduct a thermal test of a converter in a vacuum 
Reflow Oven System Ryan Kennedy ELT2720 Project 2008.
BADWATER 2007 The “cool” year..
Molly, Gwyn, Sam, and Eric.  SRIB= sounding rocket interface board, which Keith is making  PEM= polarimeter electronics box (3 outputs)  A=analog,
Group Members: Brad Cox Kevin Burkett Tera Cline Arthur Perkins CS10 Battery Management System.
Class Schedule Template SundayMondayTuesdayWednedayThursdayFridaySaturday 6 AM 7 AM 8 AM 9 AM 10 AM 11 AM 12 AM 1 PM 2 PM 3 PM 4 PM 5 PM 6 PM Title Classroom.
Items -Latch/comparator issue is ok -ExpressPCB -ADC acquisition time.
My mini course Yan Yupei Student ID: YB , Department of Electromechanical Engineering Faculty of Science and Technology My.
Project Status. Work Completed IR communication(Protocol, software, and hardware) RF communication(Software and Hardware) Hardware(PCBs) – Pack – Tagger.
A PCB has 2 signal layers, a split power layer and one ground layer. It also has two solder mask and two silkscreen layers. Is the board classified as:
Center for the Visual & Performing Arts. $25.00(CASH/MONEY ORDER) January , 2015 Before & After School Near the Main Entrance YEARBOOK FINAL PRE-SALE!!
© Imperial College LondonPage 1 CERC Front End FPGA Development by Osman Zorba 12 May 2004 O. Zorba CALICE 12/05/2004.
1 J.L. QC Pro4000 Long Exposure modification. 2 J.L. Cutting PCB.
Optical Encoder for a Game Steering Wheel May05-26 Client: Thomas Enterprises Advisors: Dr. James Davis Dr. Douglas Jacobson Team Members: Sam Dahlke,
Main Hardware. Main PC to Board Connection via PX200 Main Hardware.
Computer Networking and Printing Technologies Katie Woods 7/25-28/11 STEM Summer Bridge 2011.
16 November 2015 Map Discussion Asheville, North Carolina Douglas Miller.
10 November 2014 Map Discussion Asheville, North Carolina Douglas Miller.
2/1/16 Due today: notes and if not already turned in Finish HW 50 if not already turned in HW 51 Objectives: Chapter 7 test notes Homework:
Problem of the Day Week of 8/25/2014. Monday You bought your twin sister Molli 3 gifts costing $24 each and your brother Sam 5 gifts at $18 each. How.
Problem of the Week! Sam arrived at the Shoprite store at 4:00 in the afternoon. He shopped for 2 hours buying school supplies. Pencils were 15 cents each,
Warm-up: Monday, Jan. 23rd Solve each by substitution.
DC56 Bi-weekly Meeting: DC5 Modifications September 3, 2013 Robert Heitz University of Illinois.
Week 22: Schematic Week 23-Week 27: Routing Gerber files have been available since 9th July 1st prototype: – PCB manufacturer: supervised by KIT – Cabling:
全面推开营业税改征 增值税试点政策培训. 什么是营改增? “营改增”中的“营”指的是营业税,“ 增”指的是增值税。对大多数企业来说,增 值税所带来的税负远低于营业税。 减税本身就是积极的财政政策。营改增所 实现的减税,不仅规模大、范围广,它本质 上是一种“结构性减税”,从而构成“结构 性改革”攻坚战中的实招。
Sensor Dongle: Its Application using MatLab Eric Coupal-Sikes EE
Occam Process
Elapsed Time.
Soldering process 1 Add the soldering material on the soldering pad of speaker in order to solder the wire on the speaker.
Pre-Reflow Inspection Station (PRIS)
مقدمة في الاردنيو د فضل الاكوع.
Gigabit Ethernet Design ECE 4006C – Spring 2003
Instrumentation Development Lab: facilities/resources
Capacitor Assembly K. McFarlane 9/30/02 9/30/2002 TRT meeting Oct 2002
Presenter: Allen Duncan
Instrumentation Development Lab: facilities/resources
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #10
The Effects of Surface Finish on Solder Paste Performance -
Presentation transcript:

Molly, Gwyn, Sam, and Eric

 We got the Reflow oven to work- time to test it  Eric wrote MUX code- it compiles  Sam started on little PCB (PIC, connector, USB)  Using ExpressPCB, best price: 3 boards, 3.8”x2.5” each, $75  Set back a day on large PCB- will arrive Thurs.

 Finish little PCB- we want to order by 11am Wed. so that it will arrive Monday or Tuesday  Test DAC code and MUX code with hardware  Test Reflow oven to determine time and temperature, which solder paste  Practice placing parts