NGAO Team Meeting Management Peter Wizinowich May 26, 2009.

Slides:



Advertisements
Similar presentations
1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
Advertisements

Project Management Process. Managing the Information Systems Project Focus of project management To ensure that information system projects meet customer.
Chapter 2 The Analyst As Project Manager In Managing Information Systems 2.3.
Project Management.
NGAO System Design Review Response Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max for NGAO Team SSC Meeting June 18, 2008.
Impact of Cost Savings Ideas on NGAO Instrumentation December 19, 2008 Sean Adkins.
NGAO System Design Phase Update Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max, Sean Adkins for NGAO Team SSC Meeting February 20, 2008.
Build to Cost Meeting: Goals, Agenda & New Directions Peter Wizinowich NGAO Team Meeting September 11-12, 2008.
NGAO Control Systems Group Status, Plans & Issues NGAO Team Meeting August 19, 2008 Erik Johansson Jimmy Johnson, Doug Morrison, Ed Wetherell.
1 Keck NGAO Proposal: Management Overview Presenter: P. Wizinowich SSC Meeting June 21, 2006.
NGAO System Design: AO System (WBS 3.2) & Laser Facility (WBS 3.3) Design Inputs & Outputs Peter Wizinowich NGAO Team Meeting #9 August 24, 2007.
What is a project? Project Management Institute definition
Science Operations Update NGAO - Meeting 11 D. Le Mignant, E. McGrath & C. Max W. M. Keck Observatory 11/05/2007.
California Association for Research in Astronomy W. M. Keck Observatory KPAO Keck Precision Adaptive Optics Keck Precision AO (KPAO) SSC Presentation January.
Build to Cost Directions & Guidelines Peter Wizinowich SSC Meeting November 3, 2008.
NGAO Meeting #3 Introduction NGAO Meeting #3 Peter Wizinowich December 13, 2006.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Scott Williams 1 GLAST Large Area Telescope: Instrument Operations Center Scott.
Planning “Science Operations” tasks for the PD phase NGAO PD Phase D. Le Mignant W. M. Keck Observatory 08/19/2008.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
NGAO Management Update Peter Wizinowich NGAO Meeting #11 November 5, 2007.
Science Operations Replan NGAO - Meeting 6 D. Le Mignant W. M. Keck Observatory 04/25/2007.
NGAO System Design Phase Management Report - Replan NGAO Meeting #6 Peter Wizinowich April 25, 2007.
Science Operations Plan NGAO - Meeting 10 D. Le Mignant W. M. Keck Observatory 09/17/2007.
NGAO Status R. Dekany January 31, Next Generation AO at Keck Nearing completion of 18 months System Design phase –Science requirements and initial.
NGAO System Design Phase System & Functional Requirements Documents NGAO Meeting #6 Peter Wizinowich April 25, 2007.
NGAO Team Meeting Management Peter Wizinowich March 19, 2009.
System Architecture WBS 3.1 Mid-Year Replan Richard Dekany NGAO Team Meeting #6 April 25-26, 2007 UCSC.
7M701 1 Software Engineering Project Management Sommerville, Ian (2001) Software Engineering, 6 th edition Ch. 4
Major Management & Systems Engineering Ideas for Reducing Costs Peter Wizinowich NGAO Team Meeting September 11-12, 2008.
NGAO Meeting #5 Introduction NGAO Meeting #5 Peter Wizinowich March 7, 2007.
WMKO Next Generation Adaptive Optics: Build to Cost Concept Review Peter Wizinowich et al. December 2, 2008 DRAFT.
NGAO Instrumentation Preliminary Design Phase Planning September 2008 Sean Adkins.
Functional Requirements for NGAO Christopher Neyman W. M. Keck Observatory NGAO Team Meeting #9 August 24, 2007.
©Ian Sommerville 2006Software Engineering, 8th edition. Chapter 5 Slide 1 Project management.
Trade Study Report: NGAO versus Keck AO Upgrade NGAO Meeting #5 Peter Wizinowich March 7, 2007.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
Project planning. Software project management Informal definition of management – The art of getting work done through other people Software project management.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
Computer System Analysis
©Ian Sommerville 2006Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
Project Management Chapter 5, PG 92. Introduction Why is software management particularly difficult?  The product is intangible Cannot be seen or touched.
Software Engineering Chapter 15 Construction Leads to Initial Operational Capability Fall 2001.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
CS 360 Lecture 3.  The software process is a structured set of activities required to develop a software system.  Fundamental Assumption:  Good software.
Chapter 3: Project Management Omar Meqdadi SE 2730 Lecture 3 Department of Computer Science and Software Engineering University of Wisconsin-Platteville.
1 Project Risk Management Project Risk Management Dr. Said Abu Jalala.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
Project management Lecture 10. Topics covered Management activities Project planning Project scheduling Risk management.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Project management.  To explain the main tasks undertaken by project managers  To introduce software project management and to describe its distinctive.
Software Engineering, 8th edition. Chapter 5 1 Courtesy: ©Ian Sommerville 2006 Oct 13 th, 2008 Lecture # 6 Project management.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
1 Project management. 2 Topics covered Management activities Project planning Project scheduling Risk management.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Copyright 2001 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Chapter 2 Managing the Information Systems Project 2.1.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
Keck Next Generation AO Next Generation Adaptive Optics Meeting #2 Caltech November 14, 2006 P. Wizinowich for NGAO Executive Committee.
Software Development Process CS 360 Lecture 3. Software Process The software process is a structured set of activities required to develop a software.
1 Project Management Software management is distinct and often more difficult from other engineering managements mainly because: – Software product is.
Request for Proposal (RFP) In response to the RFP – the first step is to prepare a proposal 1. Review Customer Requirements and come up with candidate.
1 Project management Organising, planning and scheduling software projects.
Camera PDR/CD1 Planning 19 September 2008
SCT Project Management Issues
Chapter 6: Database Project Management
Software Project Management
Software Project Management
NGAO System Design Project Plans and Schedule
Software Development Process
Project management Lecture 9
Presentation transcript:

NGAO Team Meeting Management Peter Wizinowich May 26, 2009

2 Presentation Sequence / Schedule Preliminary Design Status vs SDR Plan PD Replan Status –Project Plan –Personnel Plan –Milestones (NGAO, Instruments, Proposals) –Instruments Near Term Priorities PD Deliverables

3 Preliminary Design Status vs SDR Plan $3479k PD phase budget –$455k FY08, $2000k FY09, $1024k FY10, includes $449k of contingency –36,000 work hours Through Apr. ~27% complete vs 57% expected to be complete in SDR plan –This does not include science instrument design Through Apr. we have spent $730k or 24% of budget excluding contingency versus 27% of work completed Why? –Unplanned tasks that have required management attention NFIRAOS cost comparison B2C guidance MRI & ATI proposals Addition of science instruments –Personnel availability Departing or unavailable personnel (DLM, RF, JZ, MB) Less senior management than planned –Unclear direction in some areas Primarily because of B2C

4 Actual % complete through Apr/09

5 Replan Status Replan nearly complete –Need to confirm COO personnel availability & revise appropriately –Need leads to confirm that schedule can be met Would like to finalize plan this week –The plan will not be revised again during the PD We will doubtlessly need to make tactical adjustments However this is the plan we will be judged against for the remainder of the PD –We will begin reporting against this plan starting with the May report We should be sure that what we said would be done in May is complete (do some tasks already need to be pushed out?)

6 MS Project Plan

7

8

9

10 MS Project Plan by Individual

11 Staffing Plan

12 Staffing Plan

13 New NGAO PD Milestones

14 New NGAO PD Milestones

15 Instrumentation Plan NGAO Imager and IFS combined plan –Incorporates anticipate ATI funded IFS work –Parallels remaining AO system preliminary design phase NGAO imager PDR and IFS SDR at or before NGAO main PDR –Imager preliminary design phase Baseline is single instrument (common dewar, etc.) Will do trade study for imager and IFS separately –IFS system design phase Slicer approach trade study and down select Requirements for all IFS components –IFS preliminary design phase extends beyond NGAO PDR Will start Imager detailed design at same time as AO DD phase When IFS PD phase completes remaining work will be one plan

16 Major Instrumentation Activities Imager –Brief trade study period –Initial optical design –Optical modeling and preliminary optical design –Preliminary mechanical, electronic, software designs IFS –Trade studies –Development of slicer design approaches –Evaluation of approaches –Down select for lab prototyping in PD phase Documentation –Instrument system level requirements –Instrument system design manual –Instrument systems engineering management plan –Design phase reports

17 Near Term Priorities Finalize planning –Complete NGAO replan –Complete Instrument plan & staffing Finalize requirements –Revise & complete 1 st release of requirements (SCRD, SRD & FRD) –Requirements flowdown –Complete 1 st release of Observing Operations Concept Document –Complete 1 st release of Interface Control Document Manage the plan –Ensure tasks are defined & agreed on –Systems engineering team needs to manage requirements & interfaces, & address systems issues to ensure tasks & process are well defined –Task leads & teams need to manage their task to produce deliverables, meet requirements on schedule & within budget –TSIP monthly reports to monitor progress & identify issues (technical, schedule, budget) –Bi-monthly team video meetings with some face-to-face working meetings

18 Preliminary Design Objectives & Deliverables Objectives. –Deliver documented designs for each system, sub-system & component, hardware or software, of sufficient detail to establish through inspection & analysis the feasibility of the proposed design, & the likelihood that the design will meet the requirements. –Present the project plan to completion, including a detailed schedule & budget. Principal activities –Design, prototyping, simulation and analysis. Key deliverables –Preliminary technical specifications, requirements for subsystems, a preliminary Operations Concept Document, Interface Design document(s), & a Preliminary Design report.

19 Preliminary Design Deliverables 1 Science Case Requirements Document Observing Operations Concept Document System Requirements Document Functional Requirements & Interface Control Document(s) –AO system, laser system, science operations tools, science instruments –Managed within Contour database Preliminary Design Manual (the document to read to understand the design & performance of the NGAO facility – draft PDM posted) –Flowdown of requirements to design –Solidworks & Zemax model(s) –Software design (RTC, non-RTC & science ops tools) –Performance Budget Reports (wavefront, EE, astrometry, contrast, …) –Science Performance Analysis Report Science Instrument Design Manual

20 Preliminary Design Deliverables 2 Risk Assessment & Management Report Systems Engineering Management Plan –Project plan to completion, including a detailed schedule & budget –Phased implementation option(s) –Cost estimation –Justification for any procurements during DD