GLAST LAT Project 7/27/2004 – Lori Bator1 RFA 7 – ISOC Reports LAT status and planning Reported daily (TBR) Summary of LAT health status Limit violations.

Slides:



Advertisements
Similar presentations
The Professional Open Source Company JBoss Network Enterprise Manager A detailed description of some of the key features of the JBN Enterprise Manager.
Advertisements

Multi-DNC Data Collection/Monitoring
Operations Testing in the ISOC Service Challenges are a successor and extension to the successful Data Challenge model Broader set of objectives Continue.
Title: ICON L0 from MOC to SOC automation Author: MOC/SOC Resides: SOC Description: This is a script that copies the ICON L0 files from the MOC to the.
TRACK 2™ Version 5 The ultimate process management software.
GLAST LAT Project ISOC 5/17/2004 – Seth Digel1 ISOC Lessons Learned RFA09 Issue –No writeup on lessons learned from visits to other instrument/mission.
GLAST LAT ProjectManager’s Face to Face - ISOC, 17 March GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Manager’s Face.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 71 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: Instrument Science.
GLAST LAT ProjectISOC Peer Review March 2, 2004 Document: LAT-PR Section 5 LAT Operations Facility 1 GLAST Large Area Telescope: Section 5: LAT.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 6.1 Ground Operations Software 1 Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectLAT Operations Planning, 23 March GLAST Large Area Telescope LAT Operations Planning 23 March 2005 Rob Cameron
GLAST LAT Instrument GLAST Monthly Mission Review October 5, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview October 5, 2007 Ken Fouts.
GLAST LAT ProjectISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.1 Requirements 1 Gamma-ray Large Area Space Telescope GLAST Large.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 4.3 Pipeline, Data Storage and Networking Issues1 Gamma-ray Large.
GLAST LAT Project Engineering Meeting – ISOC Peer Review 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope ISOC Peer Review ISOC Detail.
RFA 18 – Automation of Operations Software Specific Request –Specify plans and requirements for automation of operations software, and describe the software.
GLAST LAT Project 6/25/2015 – Lori Bator1 Use of AstroRT or ITOS for ISOC Functions that can be performed by AstroRT or ITOS –Read telemetry packet information.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
GLAST LAT Project Analysis Meeting March 22, 2004 E. do Couto e Silva 1/8 LAT Instrument Test Analysis Eduardo do Couto e Silva March 23, 2004.
Section 15-1GLAST Ground System Design Review August 18&19, 2004 ISOC Organization ISOC Manager R Cameron Commanding, H&S Timeline Planning Command Generation.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 3 LOF Operations Concept 1 Gamma-ray Large Area Space Telescope GLAST.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 4.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Section Gamma-ray Large Area Space Telescope GLAST Large Area Telescope ISOC Peer Review 7.2.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 21 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-ISOC Subsystem1 RFA 1 – Management Plan, Documentation, Schedule  Specific Request – Part 1.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
LAT ISOCDOE Status Review, 12 Oct GLAST Large Area Telescope LAT Instrument Science Operations Center Rob Cameron Stanford Linear Accelerator Center.
GLAST LAT Project ISOC Subsystem1 Response to Peer Review RFA 6  Request: –Need to provide more information on the planned and actual staffing profiles.
Dillard’s Energy Management
Standard Scheduling Options Today No central source for managing meetings Lots of different pieces Equipment, systems, people, schedules, etc. Manual.
RtReports in Action Barry Higgins Automation & Control Engineer.
GLAST LAT ProjectMonthly Status Review - ISOC, 1 September GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Monthly Status.
1 SpaceOps 2002 Autonomous Operations For The Swift Mission T3-47 John Ong/Swift Software Systems Manager NASA/GSFC Code 582/ Mike Rackley/Swift.
Kinect Monitor SIS Server Kinect Sensor Some Monitor... Uploader GUI Universal Interface Health Sensors Input Processor
Monitoring and reporting made easy… Monitoring, History and reporting Multi-Vendor connectivity Web based configuration and reporting Rule based alarm.
LAT HSK Data Handling from B33 Cleanroom. ISOC Software Architecture.
GLAST LAT Project LAT Instrument Analysis Workshop – Feb 27, 2006 Hiro Tajima, TKR Data Processing Overview 1 GLAST Large Area Telescope: TKR Data Processing.
GLAST LAT ProjectMonthly Status Review - ISOC, 3 Nov GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Monthly Status Review.
ECS. Overview Features Architecture Benefits Reports.
GLAST Mission - LAT ProjectDOE/NASA Review March 31, 2004 Section ISOC 1 GLAST Large Area Telescope: ISOC Subsystems WBS: 4.1.B David Lung Stanford Linear.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
DEX 7 – Operational Feedback Business Need Introduction This exchange enables the transmission of information on the condition and usage of a supported.
LAT ISOCISOC Review, 15 February GLAST Large Area Telescope Instrument Science Operations Center Commanding, Health and Safety Rob Cameron Stanford.
GLAST LAT ProjectIDT Face-to-Face Agenda S. Williams 1 Face to Face Meeting Session Topic: LAT Operating Modes Date: March 19 Time: 13:30 Convener: Scott.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
GLAST LAT Project ISOC 1 ISOC Status Review June 3, 2004.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR FSW Overview Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 51 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
Service Charging Platform. EMS (Entity Management System) 0 Logging Agent Provides detailed activity logs and reports all raw facts as they happen to.
Improve query performance with the new SQL Server 2016 query store!! Michelle Gutzait Principal Consultant at
Web Based Data Quality Monitoring for the Fermi Gamma-Ray Space Telescope Tony Johnson
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
GLAST LAT ISOCNotes for Italian meeting, 15 december Notes about ISOC and the italian contributions Gamma-ray Large Area Space Telescope.
GLAST Large Area Telescope Instrument Science Operations Center
I&T&C Organization Chart
GLAST Large Area Telescope:
“Running Monte Carlo for the Fermi Telescope using the SLAC farm”
GLAST Large Area Telescope:
GLAST Large Area Telescope
Electrical Ground Support Equipment Verification Test Support
Proposal for LAT Year 1 Data Release Plan
RFA 8 – Command & Control System Definition
GLAST Large Area Telescope
GLAST Large Area Telescope
GLAST Large Area Telescope
LAT Operations Scenario Subsystem Meetings
GLAST Large Area Telescope
Integration & Test Instrument Operations Coordination
GLAST Large Area Telescope Instrument Science Operations Center
Presentation transcript:

GLAST LAT Project 7/27/2004 – Lori Bator1 RFA 7 – ISOC Reports LAT status and planning Reported daily (TBR) Summary of LAT health status Limit violations Alerts received Current LAT configuration Commanding and any other special activities that occurred Mission planning outlook for near term (time period TBD) Generated by LOF with automatic and manual inputs Published to web server

GLAST LAT Project 7/27/2004 – Lori Bator2 RFA 7 – ISOC Reports LAT performance Reported daily (TBR) Quick look science data Performance metrics (details TBD) Generated by SOG Published to web server Level 0 data transmission report Data transmission metrics (details TBD) Automatically generated and sent to MOC following receipt of Level 0 data

GLAST LAT Project 7/27/2004 – Lori Bator3 RFA 7 – ISOC Reports Data Trending Housekeeping data Environmental data (temp, voltages, currents) Derived science quantities Trigger efficiency Total count rate Bright source monitoring Includes statistical analysis Generated automatically daily/weekly/monthly Published to the web

GLAST LAT Project 7/27/2004 – Lori Bator4 RFA 7 – ISOC Reports Data Processing Reports Produced during pipeline processing Configuration report Quality reports for digitized data Quality reports for reconstructed data Generated automatically Published to the web

GLAST LAT Project 7/27/2004 – Lori Bator5 Report Generation and Usage ReportFrequencySourceAuto Generation Manual Input DestinationRead By LAT Health and StatusDailyISOCYesOptionalWebHuman LAT PerformanceDaily (TBR)ISOCYesOptionalWebHuman Level 0 TransmissionLevel 0 receiptISOCYesNoMOCComputer Data TrendingLevel 0 receiptISOCYesNoWebHuman LAT Command HistoryDaily (TBR)ISOCYesNoWebHuman Data Processing Reports Level 0 receiptISOCYesNoWebHuman LAT Incident ReportsAs neededISOCNoYesMOCHuman SC Incident ReportsAs neededMOCNoYesISOCHuman As-Flown TimelineTBDMOCYesTBDISOCComputer/ Human