MRB on SLAC NCR 226 MCM Encapsulation Delamination R.P. Johnson January 3, 2005.

Slides:



Advertisements
Similar presentations
Tracker Subsystem1 GLAST LAT Project FM8/14 PSR, Oct. 5, 2005 GLAST LAT Tracker Towers 8/14 Pre-Ship Review INFN-Pisa.
Advertisements

Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Experiments on Solder Column Interposer: cryogenic cleaning and local laser reflow Irving HAMON, Electronic Materials and Assembly Processes for Space.
Longitudinal Expansion of RFQ Vane Ends at Section-to-Section Interface.
Hybrid assembly at Glasgow. Placing ASICs Arrange 20 ASICs in ASIC tray with strip bond pads facing outwards – ASICs to be used in ‘Cat A’ sample boxes.
THERMO-MECHANICAL TESTS ON TRACKER LADDERS (Low temperature problem on plane 1) Status Report: D.Rapin Sept 26,2012 (help from Giovanni, Franck, Mingming,...)
GLAST LAT ProjectF-to-F, March, TrackerR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face March Meeting Robert Johnson.
November 17, 2004Tracker1 Tracker MRB Wire Bond Encapsulation from MCM to SSD R.P. Johnson U.C. Santa Cruz.
GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S August Status Meeting.
GLAST LAT ProjectOctober 14, 2002 Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS Engineering Meeting Tracker Engineering-Model.
October 15, 2004GLAST Project Results of 1 st Run P.A. Test Fixture LATLAT 1 RESULTS OF 1 st RUN PITCH ADAPTER TEST FIXTURE Peter Amnuaypayoat
GLAST LAT ProjectMonthly Status Review – December 2, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Darren Marsh SLAC Performance & Safety.
Tracker Subsystem1 GLAST LAT Project FM4/5 PSR, May 31, 2005 GLAST LAT Tracker Tower-4/5 Pre-Ship Review INFN-Pisa.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
The AMS-02 detector is based on a large acceptance (~0.5 m²sr) and high sensitivity spectrometer composed by a super-conducting magnet (0.8 T), cooled.
GLAST LAT Silicon Tracker Marcus ZieglerIEEE The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus Ziegler.
Tracker Subsystem1 GLAST LAT Project FM6 PSR, July 21, 2005 GLAST LAT Tracker Tower6 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectLadder wirebonds break - MRB 03 Dec 2004 L. Latronico1 Ladder Wirebonds break MRB Meeting – 3 december 2004.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
4/11/2011Rui de Oliveira1.  Collection of the biggest PCB failures we’ve seen at CERN workshop since 10 years.  The PTH (plated through hole) is the.
Chip Carrier Package as an Alternative for Known Good Die
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 GLAST Large Area Telescope: Tracker Subsystem MCM Production Readiness.
Experience with the MVD Living around the beam pipe Components, connections, signals, systems Hubert van Hecke - Los Alamos.
THEMIS F2/F3 IPSR and F4/F5 IPER 1 By Telecon, November 10, 2005 THEMIS INSTRUMENT SUITE FM2/FM3 PRE-SHIP REVIEW FM4/FM5 PRE-ENVIRONMENTAL REVIEW Thermal.
1 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa GLAST:Gamma Ray Large Area Telescope Ladders, Trays and Towers Construction A.Brez.
3M Bonding Systems Division Adhesives for Electronics Reliability Study of Sub 100 Micron Pitch, Flex-to-ITO/glass Interconnection, Bonded with an Anisotropic.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 8 NCRs were generated during TMCM preproduction NCR #00029, CLOSED.
CERN Rui de OliveiraTS-DEM TS-DEM Development of Electronic Modules Rui de Oliveira CERN CERN hybrid production experience (or how to stay out of trouble)
Tracker Production Overview Readout Cables UCSC, SLAC (Parlex) SSD Procurement, Testing SLAC,Japan, Italy (HPK) Electronics Fabrication, burn-in, & Test.
M. Gilchriese Module Assembly and Attachment at LBNL M. Gilchriese for F. Goozen April 2000.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Schedule Summary; Critical.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: EM Mini-Tower Robert Johnson.
Tracker SSD Ladder Preproduction Review Actions and Changes Since Last Week September 16, 2002 Alessandro Brez Robert Johnson.
Tracker Subsystem1 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at.
MRB on SLAC NCR 226 Excess of Disconnected MCM Channels R.P. Johnson November 9, 2004.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
GLAST LAT ProjectMonthly Status Review – Nov 3, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS E: MCM Assembly Gamma-ray.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 LAT QA has hired a full-time on-site representative (Donald Knaepple)
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 Survey & Process Review conducted at Teledyne on Nov. 14, 2003.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
Cable MRB July 13, 2005 R.P. Johnson. July 13, 2005R.P. Johnson2 Cable Status Needed in Italy to support Tower 8,9 Environmental Testing July 19.
Stave #12 This stave core was built together with William Emmet, Tom Hurteau, and Jeffery Ashenfelter from Yale University in the week of November.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Parts and Materials Procurement.
Charlie Young, SLACPitch Adapter Review 1/20/051 Trace Cracking Problem Pitch Adapter (PA).  2-mil Kapton.  ½ oz copper.  Nominal 150  -inch nickel,
GLAST LAT ProjectMRB 09/14/2005 L. Latronico1 Tower 14 – Layer Y0 malfunction MRB Meeting – 14 September 2005.
Tracker Timing Margin MRB R.P. Johnson U.C. Santa Cruz October 15, 2004.
Thoughts about PS module assembly Ulrich Heintz, Meenakshi Narain, Bill Patterson, Eric Spencer, Juan Trenado Brown University, Providence 4/16/2015Heintz,
Procedure for MCM rework on tray MID 070
ATLAS pixel module assembly flow
Telescope - Mechanical
THEMIS INSTRUMENT SUITE FM4/FM5 PRE-ENVIRONMENTAL REVIEW
Tower 8 – X6 anomaly MRB Meeting – 24 August 2005.
GLAST Large Area Telescope:
Mini-Tower test results
Investigation on tray MID 063 Back
Studies of Quad Pixel Module assembly using paper laminate
Preproduction Status & Results
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Presentation transcript:

MRB on SLAC NCR 226 MCM Encapsulation Delamination R.P. Johnson January 3, 2005

MRB, SLAC NCR 2262 Contents 1.Description of the nonconformance 2.Overstress analysis and additional testing 3.Suspected root cause 4.Impacts to inventory 5.Corrective action 6.Effectiveness of corrective action 7.Recommended disposition

January 3, 2005MRB, SLAC NCR Description of Non-Conformance Item: MCM part number LAT-DS and LAT-DS Nonconformance: >40 MCMs have been rejected at SLAC because they each have >15 channels disconnected between the ASICs and pitch adapter or >0 disconnected bias traces. This is ~15% of MCMs tested. Some additional loss of channel connections has occurred on MCMs already integrated onto trays. The vast majority of the loss of channels is from delamination of the epoxy encapsulation from the Kapton pitch-adapter flex circuit.

January 3, 2005MRB, SLAC NCR 2264 Number of Disconnected Channels 34% have zero disconnected channels 79% have <9 disconnected channels out of 1536 (0.5%) 85% have <16 disconnected channels out of 1536 (1%) 10% have more than 50 disconnected channels! The worst case has 750 disconnected channels (50%)!

January 3, 2005MRB, SLAC NCR 2265 Location of Disconnected Channels The disconnected channels are most likely to occur toward the MCM center.

January 3, 2005MRB, SLAC NCR 2266 Time Distribution of the Problem Before July 1 the disconnected channels are few and are consistent with being mostly from cracked traces. After July 1 we started seeing MCMs with huge numbers of missing connections. This time dependence is not understood. Teledyne claims that there was no corresponding change to process or personnel.

January 3, 2005MRB, SLAC NCR 2267 Delamination During MCM Mounting 4 Tower-A MCMs suffered visible delamination of the encapsulation while mounting the MCMs onto trays at G&A. These were MCMs with essentially zero broken wire bonds when tested at SLAC. In 3 of the cases the MCM was delivered to SLAC before July 1. The delamination was generally near the MCM end, in the controller-chip region. This effect may have a similar root cause to NCR 226, in terms of poor encapsulation adhesion. However, the problem was eliminated in Tower B by –Modified procedure to attach the MCM to the jig. –Less adhesive for MCM mounting; hence less force on the MCM from the jig. Visible gap 142 consecutive wire bonds are broken!

January 3, 2005MRB, SLAC NCR 2268 Mounting MCMs onto Trays The MCM is clamped with the pitch-adapter pushed against a straight jig, to ensure a straight top edge for wire bonding. Custom pins clamp the rest of the board to the jig and also have a thin washer to guarantee the adhesive bond line. The jig precision aligned to the tray, gluing the MCM to the tray with a venting pattern of 3M 2216 epoxy. MCM Tray Panel

January 3, 2005MRB, SLAC NCR Overstress Analysis & Additional Testing Preproduction MCMs used for qualification did not show any problems with wire bond breakage after 220 thermal cycles from  30C to +85C. This suggests that it is possible to make the encapsulation work, so that a design change may not be necessary if process problems can be solved.

January 3, 2005MRB, SLAC NCR Thermal Cycles of Flight MCMs All MCMs get 21 thermal cycles from  30C to +85C. We have data before and after thermal cycles for only 21 MCMs. The large-scale breakage appears to occur during these cycles.

January 3, 2005MRB, SLAC NCR CSAM (acoustic microscopy) Test Results High frequency (~40 MHz) sonar reflected images show in red delamination of the black Hysol epoxy encapsulation from the Kapton pitch adapter. SN 600, delivered May 23, has no disconnected channels (zero broken wire bonds). Nevertheless, the left-hand end shows substantial delamination. SN 11046, delivered September 1, has 362 disconnected channels, all on the right-hand 1/3 of the MCM. In that region the delamination approaches 100%, as dose the percentage of broken wire bonds. Chip 0

January 3, 2005MRB, SLAC NCR Suspected Root Cause The delamination occurs during thermal and/or mechanical stress. However, good bonding to the pitch adapter may be enough to withstand the stress, so the bonding process is suspect. Thermal Strain: –Height of the vertical cliff (raised strip on the PWB): 0.55 mm –Temperature range from cure (125 C) to the thermal-cycle low (  30 C): 155 C –CTE mismatch between the PWB and encapsulation along the cliff: 37 ppm –Strain: 37×10  6 ×155 = 0.57% –Relative displacement if free: ×0.55 mm = mm = 3 microns Polyimide-glass PWB: Arlon 35N Encapsulation: Hysol FP-4450 CTE in plane16 ppm18 ppm CTE out of plane55 ppm18 ppm

January 3, 2005MRB, SLAC NCR X-Ray Cross Section of an MCM Flex Circuit Internal Cu Planes ASIC and Conductive Glue Wire Bond Encapsulation Fill Encapsulation Dam Fiberglass The “Cliff”

January 3, 2005MRB, SLAC NCR Stress Analysis The FEM shows the expected stress at the cliff, where the CTE mismatch is. But it is not quantitatively conclusive, since we do not know at what stress this bond will fail. If the bond along the cliff failed, then we would expect the pitch adapter to start to peel away from the encapsulation starting at the corner. cliff Pitch adapter Corner

January 3, 2005MRB, SLAC NCR Destructive Physical Analysis Chip 12 Section, bond 30 S/N 775 Copper trace Circuit board Wire bond fracture Delamination The wire bond is lifted up by the delamination. The foot remained welded to the copper trace, so the bond broke. In the case of broken bonds, the delamination extends all the way to the dam, as seen in the CSAM images 25  m Al wire Diane did not see evidence of delamination on the “cliff”.

January 3, 2005MRB, SLAC NCR Silicone Contamination NASA QA noticed last autumn that the Teledyne Kapton masking tape had a silicone-based adhesive. This was found at the time of the production stop, so as far as we know, all MCMs built to date used this masking tape. Prior to soldering, the pitch adapter was covered 100% by that tape. The tape remained on in the reflow oven and during vapor degreasing afterwards. The pitch adapter was wiped with acetone and alcohol afterwards, and plasma cleaning was done before wire bonding. NASA found evidence of silicone residue at the encapsulation-pitch- adapter interface during DPA of MCM S/N 775. From experience, even a thin residue of silicone can prevent proper bonding of epoxies, so this is the leading hypothesis for the failure of the encapsulation.

January 3, 2005MRB, SLAC NCR Impacts to Inventory 72 MCMs have been mounted on Tower-A and Tower-B trays. Enough MCMs remain for 3 more complete towers. Part of a 6 th tower could also be equipped. Changing the requirement from <16 broken wires to <9 broken wires would eliminate an estimated 18 MCMs, including at least one tall. This may still allow 5 towers to be equipped.

January 3, 2005MRB, SLAC NCR Corrective Action MCM screening at SLAC –100% test of all signal and bias traces on the existing stock following thermal cycles and burn-in. Reject all MCMs with >15 dead or disconnected signal channels or with >0 disconnected bias traces. MCM mounting at G&A –Mount the MCM to the jig very carefully, working from center outward. –Reduce the amount of adhesive, so that less pressure is required on the MCM and pitch adapter to squeeze it down. –Visually inspect for delamination using a microscope before committing SSD ladders to the tray. Pitch-Adapter Test Fixture

January 3, 2005MRB, SLAC NCR Corrective Action New Teledyne production –Eliminate the tape with silicone adhesive from the production line (done). –Procure tape with acrylic adhesive and test that it really is acrylic (done). –Clean the MCM tooling with acetone and use a water-break test to ensure that the tooling surfaces are not contaminated (done). –Implement the 100% test of the pitch-adapter connections at the MIP-3 stage (the second test fixture has been procured). –Develop a back-up plan using fiberglass covers in place of encapsulation, in case the encapsulation continues to fail (in progress). Environmental testing –Change the Tower qualification test lower limit from  30C to  20C and the acceptance test lower limit to  15C. This change was made because of ladder issues, but it also helps reduce stress on the MCMs. –Change the MCM test range to  25C  +60C, still with 20 cycles. Burn- in remains +85C for 168 hours.

January 3, 2005MRB, SLAC NCR Effectiveness of Corrective Action The worst delaminations on Tower-A were caused by stress from MCM mounting. Those delaminations propagated up to 50% during thermal testing. New procedures prevented breakage during mounting for Tower-B. The SLAC screening was mostly effective, but in a couple of cases small existing regions of broken wire bonds expanded by up to 70%. Vibration had no effect in any case. TowerMCM SNSLACG&AT-CycleVibeT/V A A A A A B not yet B not yet B not yet The table shows the wire-bond breakage history for all flight layers with >8 disconnected channels.

January 3, 2005MRB, SLAC NCR Effectiveness of Corrective Action Flight Tower Quality: Tower A: –3 of 36 SSD layers have >2% disconnected channels in the MCM. –Other problems exist in connections within some ladders on heavy trays (subject of a different NCR). –Only 5 of 36 SSD layers on the tower have <98% efficiency for detection of a minimum-ionizing particle. –The average efficiency over all layers is 98.7%, so while some individual layers do not meet our goal of 98%, on average we satisfy our goal. –Monte-Carlo studies show negligible impact on science even with all 16 towers having this degree of inefficiency. Tower-B: –After tray thermal cycles and testing of stacked trays, the worst case is a 1.8% loss of MCM channels in a single layer. –Assuming little change in tower environmental testing, we can anticipate a tower with all layers having >98% efficiency and an average efficiency >99%.

January 3, 2005MRB, SLAC NCR Effectiveness of Corrective Action New MCM production –We have no results yet, but our goal is to eliminate wire-bond breakage from delamination of encapsulation. (There probably will be some residual loss of channels from cracked pitch-adapter traces, but that problem has not been observed to increase during environmental testing.) –We are setting up a plan to bond and wire bond non-flight chips to some PWBs immediately, followed by encapsulation and then CSAM before and after thermal cycles for verification. –The first batch of ~25 MCMs will undergo qualification testing: Complete MCM thermal-cycle and burn-in routine, followed by the 100% electrical test. Send at least 2 MCMs for CSAM. We assume that they will have no broken wire bonds. Thermal cycle at least 2 MCMs 200 times, followed by the 100% electrical test.

January 3, 2005MRB, SLAC NCR Recommended Disposition Scrap (use for EGSE) MCMs with >15 bad channels (dead or disconnected) or >0 disconnected bias traces. After this screening, use the remaining stock of MCMs for flight towers A, B, 1, 2, and 3, subject to success in all other tests and inspections. Continue using the MCM mounting procedures that were successful in Tower-B trays.