Robert Ruland MMF Introduction, Schedule, Budget October 14, 2004 MMF Review 1 MMF Introduction, Schedule, Budget Robert Ruland.

Slides:



Advertisements
Similar presentations
Zachary Wolf Undulator Tuning November 12, Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, D. Jensen,
Advertisements

Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC.
Rodd Pope, SLAC Undulator System April 16-17, 2007 FAC Meeting 1 Undulator System Assembly, Installation, and Integration.
Multipole Girders - Alignment & Stability (Multipole Girder Alignment technology & R&D) S. Sharma ASD: J. Skaritka, D. Hseuh, V. Ravindranath, G. Miglionico,
XFD – XF Engineering Group November 15-th, 2004LCLS Undulator Final Design Review1 Undulator for the LCLS project - design of the support and mover system.
Experience Report with the Alignment Diagnostic System Georg Gassner September 17 th 2010.
Robert Ruland MMF Bench/CMM Procurement Plan October 14, 2004 MMF Review 1 MMF Bench / CMM Procurement Plan Robert Ruland Procurement.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
Jo Beth Folger MMF Site and October 14, Conventional Facilities – MMF Presentation Outline Facility Design.
Marion M. White Undulator System 07 April 2005 LCLSLCLSLCLSLCLS Undulator System Tests Marion M. White ANL-ASD-LCLS.
Undulator Alignment Strategy – April 20, 2006 Heinz-Dieter Nuhn, SLAC / LCLS FAC 1 Undulator Alignment Strategy Heinz-Dieter Nuhn,
Zachary Wolf Undulator Tuning June 17, 2008 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, S.Kaplunenko,
LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Introduction to the LCLS Undulators Heinz-Dieter Nuhn,
Yurii Levashov Undula t or fiducialization test Oct. 14, 2004 Undulator Fiducialization Test Results Fiducialization Tolerances.
Zack Wolf Quadrupole Fiducialization October 20, A Vibrating Wire System For Quadrupole Fiducialization Zack Wolf,
Isaac Vasserman Magnetic Measurements and Tuning 10/14/ I. Vasserman LCLS Magnetic Measurements and Tuning.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Systems.
Yurii Levashov LCLS Undulator Fiducialization October 20, 2005 *Work supported in part by DOE Contract DE-AC02-76SF LCLS.
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Rodd Pope, SLAC Undulator System April 20-21, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC In collaboration.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics.
Robert Ruland Intra Girder Assembly and Alignment - October 20, 2005 Internal LCLS Undulator Alignment and Motion Review 1 Intra.
Robert Ruland MMF Layout, Workflow October 14, 2004 MMF Review 1 MMF Layout, Workflow Robert Ruland Magnetic Measurements Facility.
Zack Wolf Undulator Bench October 14, Undulator Bench Requirements Zack Wolf SLAC.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
J. Welch Talk MMF 10/14/04 LCLS Magnetic Measurement Facility Requirements Functional Temperature Vibration Earth's.
Zachary Wolf LCLS Undulator October 30, LCLS Undulator Tuning And Fiducialization Zack Wolf, Yurii Levashov, Achim.
Zack Wolf Undulator Magnetic April 11, 2006 LCLS Undulator Magnetic Measurements Zack Wolf, Scott Anderson, Ralph Colon,
Geoff Pile LCLS Und. System Fabrication FAC 29 th, 30 th & 31 st October 2007 LCLS Undulator System Fabrication Schedule FAC.
Javier A. Sevilla April 5, Magnetic Measuring Facility (MMF) Outline Organizational Chart Facility Design Criteria,
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Zack Wolf BFW Fiducialization October 20, Beam Finder Wire (BFW) Fiducialization Zack Wolf, Dean Walters, James.
PACMAN Workshop OUTLINE Introduction ESR 3.1 Challenges - Stability budget and Precision Mechanical Design - Precision Assembly of MBQ and BPM - System.
Zachary Wolf Undulator Oct 12, LCLS Undulator Tuning Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko,
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
Undulator Orientation & Electron Beam Spacing Should the undulator frames be toward the central aisle or the tunnel walls? What is the optimum spacing.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
Technical Challenges and Concerns S. Sharma and R. Alforque, R. Beuman, C. Foerster, E. Haas, E. Hu, P. Montanez, P. Mortazavi, S. Pjerov, J. Skaritka,
Marion M. White Undulator System 27 October FAC LCLSLCLSLCLSLCLS Progress on the Undulator Module System Test Marion M.
STATUS of the final PACMAN bench integration PACMAN meeting 11/06/2015 Hélène Mainaud Durand.
Option – 5m Undulators What is the optimum length for an LCLS undulator?  XFEL is using 5m undulator segments.  Is this optimum?  What are the advantages.
13 September 2006 Global Design Effort 1 ML (x.7) Goals and Scope of Work to end FY09 Nikolay Solyak Fermilab Peter Tenenbaum SLAC.
Magnetic Field Stability Measurements Joe DiMarco 23Oct07.
SCU 3-Lab Review Meeting, Dec. 16, 2014 SCU Presentations Today Intro. & Performance Motivations (P. Emma, SLAC, 20+5) Conceptual Cryostat Design: Option-A.
Catherine LeCocq, SLAC Alignment Plan for the LCLS Undulator IWAA 2006,1 Alignment Plan for the LCLS Undulator Catherine.
October 27-28, 2005 FAC Meeting Undulator Metrology Catherine LeCocq, SLAC 1 Undulator Metrology Catherine LeCocq, SLAC October.
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
NCSLI 2007 In House Capability of an Optical CMM Calibration for any Company Shawn Mason Boston Scientific.
Magnetic Measurements At SLAC
Tutorial On Fiducialization Of Accelerator Magnets And Undulators
In Vacuum Magnetic Field Measurement System for CPMU of HEPS-TF
Stages for the SSW translation system for PACMAN
Magnetic Measurements For The LCLS Undulator System
Background With new accelerators delivering beams always smaller and more energetic, requirements for very precise beam alignment become more and more.
LCLS Undulator Fiducialization
Beam-Based Alignment Results
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
Magnetic Measurements and Alignment at SLAC Robert Ruland & Zack Wolf
Undulator Tuning Status Heinz-Dieter Nuhn, SLAC / LCLS for Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko, Scott Jansson, Ralph Colon, Dave.
LCLS Undulator System Status and Schedule
LCLS Undulator System Status and Schedule
Undulator Integration Test Status
Undulator Assembly and Installation Planning
Physics Requirements for Conventional Facilities
Undulator Alignment Plan
Alignment Diagnostic System Status
Breakout Session SC3 – Undulator
LCLS Undulator Magnetic Measurements
Presentation transcript:

Robert Ruland MMF Introduction, Schedule, Budget October 14, 2004 MMF Review 1 MMF Introduction, Schedule, Budget Robert Ruland Design Driving Requirements Magnetic Measurements Facility (MMF) Capabilities Magnetic Measurements Fiducialization Storage Magnetic Measurements Facility Location, Construction Schedule Implementation Schedule Manpower Summary Design Driving Requirements Magnetic Measurements Facility (MMF) Capabilities Magnetic Measurements Fiducialization Storage Magnetic Measurements Facility Location, Construction Schedule Implementation Schedule Manpower Summary

Robert Ruland MMF Introduction, Schedule, Budget October 14, 2004 MMF Review 2 MM Test Bench Design Driving Requirements Magnetic Measurements / Tuning The measured values for K eff shall be within ± (i.e., ± 0.015%) of the design values (LCLS Undulator Requirements PRD 1.4 – 001) Alignment / Fiducialization -Undulators- Relative alignment of undulator to BBA quadrupole driven by sensitivity of K to position, 1.5*10 -4 is correlated to 70µm in Y, to achieve this requires finding the magnetic CL und to 20µm and the CL quad to 10µm

Robert Ruland MMF Introduction, Schedule, Budget October 14, 2004 MMF Review 3 MMF Design Driving Requirements Undulator – to – Quad Relative Alignment Quadrupoles are aligned to straight line using BBA Undulators need to follow quadrupole position Critical relative alignment tolerance of 70 µm in Y Extremely difficult to achieve in tunnel environment with conventional alignment methods Solution: Undulator and Quad integrated on common support, relative alignment performed in laboratory using CMM Design requirement: accurate magnetic CL determination for quad, undulator as well as CMM for control of relative alignment

Robert Ruland MMF Introduction, Schedule, Budget October 14, 2004 MMF Review 4 Required MMF Tasks Tune Implement magnetic measurements equipment to measure and tune K eff to within ± Determine magnetic CL Implement magnetic measurements equipment to determine magnetic centerline for quadrupole and undulator to within ± 10 µm and ± 20 µm, respectively. Mechanical Fiducialization Correlate magnetic axis to fiducials for quadrupole and undulator Alignment Control Perform control of relative alignment quadrupole to undulator Assembly Implement assembly capability to integrate components on common support

Robert Ruland MMF Introduction, Schedule, Budget October 14, 2004 MMF Review 5 MMF Set-up Magnetic Measurements Undulator Test Bench #1 (7 m) final gap setting, final tuning Undulator Test Bench #2 (4 m) – existing prototyping procedures, software development, initial gap setting Hall Probe Calibration System Test magnet and NMR system Quad Integrated Field Strength Bench Stretched Wire Quadrupole Fiducialization Platform Vibrating Wire Pointed-Magnet Fixture Calibration Bench Fiducialization & Assembly Fiducialization CMM 4.2 m Quadrupole Fiducialization Platform Vibrating Wire mounted on CMM BPM, Diagnostics Fiducialization Assembly Cradle Assembly Bench Vacuum Chamber Alignment Bench Granite table with Height Gauge Undulator Segment / Cradle Storage At least 2 Und. Segments in MM lab (0.1º C) At least 2 Und. Segments in F&A lab (1º C) 8 Cradles, quads, BPMs, Vacuum chamber and misc. supports in F&A lab (1º C) About 20 undulator segments / cradles in storage area (2.5º C) Magnetic Measurements Facility Requirements, PRD

Robert Ruland MMF Introduction, Schedule, Budget October 14, 2004 MMF Review 6 Layout Floor plan divided into three functional areas Magnetic Measurements (± 0.1º C) Fiducialization and Assembly (± 1º C) Storage (± 2.5º C) Test stand lay-out is driven by requirement to match the Earth Magnetic Field conditions in lab to Undulator Hall, i.e. azimuth and gap orientation need to be identical

Robert Ruland MMF Introduction, Schedule, Budget October 14, 2004 MMF Review 7 Undulator Test Bench 8m Test Bench Implementation Schedule First article undulators will arrive at SLAC around March 2006 Production undulator delivery commences in summer 06 BO MMF estimated Febr. 06 Not enough time to complete integration, software development, testing and commissioning before first undulators arrive Upgrade 4m bench obtained from APS with equivalent hardware as 8m bench to serve as test bed for software development and procedure testing. Will be using second bench for preliminary gap setting will help production schedule

Robert Ruland MMF Introduction, Schedule, Budget October 14, 2004 MMF Review 8 Undulator Fiducialization Proposed Method: Pointed Magnet Fixture Step 1: measure offset between undulator axis and pointed-magnet reference fixture on MM Bench Step 2: Measure pointed-magnet reference fixture wrt undulator fiducials on CMM

Robert Ruland MMF Introduction, Schedule, Budget October 14, 2004 MMF Review 9 Quadrupole Fiducialization Finding the axis Based on Vibrating Wire or Pulsed Wire Have Pulsed Wire prototype setup. Routinely achieve repeatabilities even in environment with wide temperature swings of better than 5 µm Also have Vibrating Wire prototype set- up. It promises better yaw and pitch resolution. Implementation based on setup by Dr. Temnykh from Cornell Transfer onto quadrupole fiducials Use Wire Finders (developed for VISA) to locate wire and reference to its tooling balls Use Coordinate Measurement Machine (CMM) to transfer information from WF to Quad fiducials. Vibrating Wire system will be mounted onto optical table which can be set-up on undulator fiducialization CMM

Robert Ruland MMF Introduction, Schedule, Budget October 14, 2004 MMF Review 10 SLAC LCLS Magnet Measurements Facility SLAC presently does not have a facility to perform the magnetic measurements tasks necessary for LCLS with the required accuracy: Need to build new facility. Proposed Location: Bldg 81, about 0.8 km away from tunnel Sufficient power for HVAC & test equipment Ground motion and vibration measurements did not indicate potential problems Manageable space constraints

Robert Ruland MMF Introduction, Schedule, Budget October 14, 2004 MMF Review 11 Facility Construction & Design Goals Funding Long Lead Procurement Funds, available in FY05 Building & Climate Control K$1,400 Construction Schedule T1 Aug 04 (Engineering) T2 Dec 04 (Final Construction Drawings) T3 May 05 (Construction Start) Beneficial Occupancy February 2006 (early finish 11/05) Design Specifications Full set of specs: LCLS-TN-04-1 Z. Wolf, R. Ruland, "Requirements for the Construction of the LCLS Magnetic Measurements Laboratory“.LCLS-TN-04-1 Magnetic Measurements Lab: Temperature stability of ± 0.1º C, short term temperature swings of up to 0.3 ºC with less than 1 hour duration are acceptable Fiducialization Lab and Assembly Area: Temperature stability of ± 1º C Storage Area: Temperature Stability of ± 2.5º C

Robert Ruland MMF Introduction, Schedule, Budget October 14, 2004 MMF Review 12 Measurement Equipment

Robert Ruland MMF Introduction, Schedule, Budget October 14, 2004 MMF Review 13 Test Stand Implementation Schedule

Robert Ruland MMF Introduction, Schedule, Budget October 14, 2004 MMF Review 14 Test Stand Implementation Schedule Schedule needs to be adjusted for effect of Continuing Resolution

Robert Ruland MMF Introduction, Schedule, Budget October 14, 2004 MMF Review 15 Test Stand Implementation Schedule Schedule needs to be adjusted for effect of Continuing Resolution

Robert Ruland MMF Introduction, Schedule, Budget October 14, 2004 MMF Review 16 Manpower We have mostly ramped up the staffing in the Magnetic Measurements Group to cope with the MMF work and at the same time to allow our conventional work to continue. MMF Development 1 Senior Physicists 2.5 Engineering Physicists 1 add. Eng. Physicist (starts Jan. 1, 2005) 1 Metrology Engineer 2 Technicians 1 add. Technician (starts Jan 1, 2005) Conventional Work 1 Senior Physicist 0.5 Engineering Physicist 1 Technician 1 Research Assistant Will be able to handle Undulator Production Measurements with existing manpower, supplemented with help from the Alignment Engineering and Quality Inspection Groups. There is no other significant competing work scheduled.

Robert Ruland MMF Introduction, Schedule, Budget October 14, 2004 MMF Review 17 END of Presentation

Robert Ruland MMF Introduction, Schedule, Budget October 14, 2004 MMF Review 18 Fiducialization Accuracy Requirement Required fiducialization accuracy is driven by error budget for aligning undulator wrt to beam-based-aligned quad, i.e. in order to stay within the total error budget of 70µm vertically, quadrupole fiducialization needs to done to 25µm and undulator segments need to be done to 40µm ( see PRD General Undulator System Requirements)General Undulator System Requirements

Robert Ruland MMF Introduction, Schedule, Budget October 14, 2004 MMF Review 19 7 m Test Bench Specifications Outline Total travel length in Z 7000 mm. Make carriage as long as cost wise reasonable to minimize yaw, at least 1000 mm Make bench cross-section as large as reasonable, min 800 mm wide, 500 mm high Travel length in X as much as bench width permits, min 300 mm Travel length in Y: 100 mm or more if w/o loss of accuracy Granite base straightness in Z and X: ± 10 µm Position accuracy at probe tip required Z, X, Y: 5 µm, 20 µm, 20 µm, desired: 3 µm, 10 µm, 10 µm. Z-axis drive linear motor with 1 µm positioning resolution X, Y axes drive lead-screw with 1 µm positioning resolution No stepping motor on any axis Z position measurement with incremental encoder type Heidenhain LIDA, a second encoder on opposite side of bench could be considered to monitor yaw rotation of carriage X, Y axes motion measured with Heidenhain glass scale encoders Perpendicularity of X and Y axes to be better than 0.1 mrad Probe axis be equipped with rotary stage with 0.01º resolution and 4-axes goniometer Support bench on foundation separate from laboratory floor Support undulator independent from bench on common foundation Support cable carrier independent from bench on common foundation Equip cable carrier with drive system synchronized as slave to Z-axis drive