Online Monitoring of L1CT in Run IIa bonus: experience from Run I Philippe Laurens 20-Feb-2003.

Slides:



Advertisements
Similar presentations
Controller Tests Stephen Kaye Controller Test Motivation Testing the controller before the next generation helps to shake out any remaining.
Advertisements

Online Monitoring and plane checkout Online monitoring is used at the mine for: –sanity checks - “is everything working” –diagnostics - rates, hot/dead.
1 The ATLAS Missing E T trigger Pierre-Hugues Beauchemin University of Oxford On behalf of the ATLAS Collaboration Pierre-Hugues Beauchemin University.
Zero Energy Response of ADF Raw ADC and ADF Output Et & New “36 LiveX sampling mode” for Find_DAC Philippe Laurens MSU Sept 2006 (rev 20-sept-2006)
June 19, 2002 A Software Skeleton for the Full Front-End Crate Test at BNL Goal: to provide a working data acquisition (DAQ) system for the coming full.
TileCal Electronics A Status Report J. Pilcher 17-Sept-1998.
Pedestal Tracking in action a.k.a. Active Stabilization of L1Cal Trigger Tower Zero Energy Response Philippe Laurens Michigan State University 09-Nov-2007.
29 June 2004Paul Dauncey1 ECAL Readout Tests Paul Dauncey For the CALICE-UK electronics group A. Baird, D. Bowerman, P. Dauncey, C. Fry, R. Halsall, M.
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
Pulser Tools for L1Cal2b Robert Kehoe L1Cal2b Mtg. May 3, 2005 Southern Methodist University Department of Physics  Goals  Status of 2A Software  Current.
Saclay, 04 / 11 / 2002 E. Perez 1 Simulation of the performances of the upgraded L1Cal  Short reminder  Performances (jets) (see Jovan’s talk for electron.
L1Cal Pulser Diagnostics GUI.. What it is for and why do we need it. See a beautiful Bob’s presentation. –To carry out diagnostics for Run2A trigger (especially.
Beam Loss Analysis Tool for the CTF3 PETS Tank M. Velasco, T. Lefevre, R. Scheidegger, M. Wood, J. Hebden, G. Simpson Northwestern University, Evanston,
Jianchun (JC) Wang, 08/21/99 RICH Electronics and DAQ Chip Carrier Short Cable Transition Board Long Cable Data Board Crate J.C.Wang Syracuse University.
Mainz: Contributions to the LArg-Calorimeter Purity monitoring of the liquid argon and temperature measurement in the three cryostats - Old electronics.
Jianchun Wang Syracuse University 10/16/99 CLEO Meeting Outline DAQ problems solved Recent results Status of DAQ Work to be done.
General Trigger Philosophy The definition of ROI’s is what allows, by transferring a moderate amount of information, to concentrate on improvements in.
DØ L1Cal Trigger 10-th INTERNATIONAL CONFERENCE ON INSTRUMENTATION FOR COLLIDING BEAM PHYSICS Budker Institute of Nuclear Physics Siberian Branch of Russian.
Physics 434 Module 3 - T. Burnett 1 Physics 434 Module 3 Acoustic excitation of a physical system.
CCD and CCD readout : Engineering diagnostics during development, commissioning and operation Pierre Antilogus C. Juramy, H.Lebbolo, S. Russo, V.Tocut.
Preliminary Design of Calorimeter Electronics Shudi Gu June 2002.
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
TelCal Phasing Engine description Draft Robert Lucas
1 Online Calibration of Calorimeter Mrinmoy Bhattacharjee SUNY, Stony Brook Thanks to: D. Schamberger, L. Groer, U. Bassler, B. Olivier, M. Thioye Institutions:
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
ECFA Sep 2004Paul Dauncey - CALICE Readout1 CALICE ECAL Readout Status Paul Dauncey For the CALICE-UK electronics group A. Baird, D. Bowerman, P.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
Calorimeter Status Nirmalya Parua, Brook.
A. Gibson, Toronto; Villa Olmo 2009; ATLAS LAr Commissioning October 5, 2009 Commissioning of the ATLAS Liquid Argon Calorimeter Adam Gibson University.
All Experimenters MeetingDmitri Denisov Week of July 16 to July 22 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 1.6pb -1 u Recorded:
SL1Calo Input Signal-Handling Requirements Joint Calorimeter – L1 Trigger Workshop November 2008 Norman Gee.
A.Chekhtman1 GLAST LAT ProjectInstrument Analysis meeting, February, 27, 2006 CAL features and idiosyncrasies. Alexandre Chekhtman NRL/GMU Gamma-ray Large.
08-June-2006 / Mayda M. VelascoCALOR Chicago1 Initial Calibration for the CMS Hadronic Calorimeter Barrel Mayda M. Velasco Northwestern University.
DØ Algorithms Meeting March 9, Leslie Groer Columbia UniversityCalorimeter Online Software Status 1  Examines  Crate Unpacking  Calibration 
Ursula Bassler, LPNHE Paris1Collaboration Meeting - 13 Sept Calorimeter: Status & Plans Preamp/ Driver Trig. sum Filter/ Shaper x1 x8 SCA (48 deep)
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
1 EMC Trigger Summery from RunII and discussion for RunIII H.Torii, Kyoto Univ. ERT Lvl-1 meeting.
Hycal Energy Resolution, Timing, &Trigger Efficiency, A cumulative study. Chris Mauney.
Nirmalya Parua March 17, 2003 The RunII Calorimeter Nirmalya Parua (For the Calorimeter Group) Shifter’s Tutorial March 17, 2003  Overview Of the D0 Calorimeter.
1 L1CAL for DAQ Shifter By Selcuk Cihangir 3/20/2007 Representing L1CAL group (slides from many people)
DØ Calorimeter Software Meeting April 26, Leslie Groer Columbia UniversityCalorimeter Online Software Status + Needs 1  Examines  Crate Unpacking.
Anatoli Romaniouk TRT Test manual Some important information p. 2-3Some important information p. 2-3 Noise studies p.4-7Noise studies p.4-7 Operation with.
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
DØ Algorithms Meeting April 6, Leslie Groer, Columbia Univ Ursula Bassler, LPNHE, ParisCalorimeter Online Software Status 1  Examines  Crate Unpacking.
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
Overview of PHENIX Muon Tracker Data Analysis PHENIX Muon Tracker Muon Tracker Software Muon Tracker Database Muon Event Display Performance Muon Reconstruction.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
S.MonteilPS COMMISSIONING1 MaPMT-VFE-FE ELECTRONICS COMMISSIONING AND MONITORING. OUTLINE 1)Ma-PMT TEST BENCHES MEASUREMENTS 2)VFE AND FE ELECTRONICS FEATURES.
Calibration algorithm and detector monitoring - TPC Marian Ivanov.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
CALORIMETER CELL MONITORING TOOL Viacheslav Shary.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
PHOTOTUBE SCANNING SETUP AT THE UNIVERSITY OF MARYLAND Doug Roberts U of Maryland, College Park.
30GHz system improvements Jan Kovermann RF meeting
TAB-To-L3(Tape) ● At the L1Cal2b sidewalk test stand we have a setup to transmit the data coming from detector to tape using the new system. ● We installed.
 13 Readout Electronics A First Look 28-Jan-2004.
THIS MORNING (Start an) informal discussion to -Clearly identify all open issues, categorize them and build an action plan -Possibly identify (new) contributing.
Rainer Stamen, Norman Gee
Calorimeter Status Electronics Installation and Commissioning
A First Look J. Pilcher 12-Mar-2004
Status of n-XYTER read-out chain at GSI
BESIII EMC electronics
Calorimeter calibrations with Flight Software.
CMS Pixel Data Quality Monitoring
The Ohio State University USCMS EMU Meeting, FNAL, Oct. 29, 2004
Presentation transcript:

Online Monitoring of L1CT in Run IIa bonus: experience from Run I Philippe Laurens 20-Feb-2003

L1 Cal Monitoring “Monitoring” can mean many things  Anything related to observation of system’s operation Different phases and different customers –Commissioning/debugging a ton of work (probably more for Run IIa than Run I) will all have to be redone for Run IIb –Check for run-readiness between stores –Shifters Support watch for hot towers, non-uniformity, etc –Instantaneous view of operation (programming, rates) –Online Hardware Verifier –Different time scales: hours, weeks, months

Run IIa Monitoring Tools 1) Bob Kehoe's examine/offline analysis –Analyze Events Physics runs or No Beam runs Look at noise in towers Compare to Precision Readout –Detect problems: Wiring, electronics, noisy channels, timing, etc. Problems are found in L1 hardware *AND* in BLS hardware – Understand/improve energy scale, resolution, etc. Generate new L1CT gain constants –Generate Plots for Shifters

Run IIa Monitoring Tools 2a) L1 TCC serving monitoring information –Collects a fresh block of information every ~5 sec. From a triggered crossing, if possible EM and HD Et for 8 consecutive crossings …and for all Trigger Towers. 2b) Simple display program –ASCII dump of the data in each time slice or a coarse average of the 8 slices or a coarse standard deviation –use colors to highlight ranges of values –cf. "L1 Cal Trig Trigger Tower ADC Monitor:" in trics_support_programs.txt in

Run IIa Monitoring Tools 2) L1TCC monitoring information (cont.) –This is how we currently get quick system appraisal after L1 or BLS hardware changes check all pedestals adjusted to 8 counts no obviously bad channels, etc  system is (probably) ready for data taking –L1CT sill missing its "CTRO" cards For L3 (and L2) readout and monitoring of final quantities Energy and Momentum Sums and Reference Set Counts carried over whole TT coverage. And-Or Terms sent to the L1FW.

Run IIa Monitoring Tools 3) “Find_DAC” Because L1CT adds constant voltage to each channel Using “Pedestal DAC” programmable by TCC To compensate for each trigger tower individual analog offset. To allow processing of “negative energies” Find_DAC tunes the Pedestal DAC to produce uniform 8 counts of digitized energy for analog input of zero GeV for all EM and HD Towers. This happens before the memory lookup for correction, low energy cut, Px/Py Scaling.

Run IIa Monitoring Tools 3) “Find_DAC” (continued) Runs on TCC independently of the DAQ system Scan through specified Trigger Towers Start with “sanity check” of front-end Uses fast VME access to build set of histograms Produces ASCII file later used to initialize system Also report amount of noise in each tower Companion tools to compare separate result files Helpful during commissioning to find problems Helpful during maintenance phase as diagnostics between stores

Run I Monitoring Tools Two types A) Low Level: –test the electronics by itself, –prove that the system is operating as designed, –independently of any beam physics. –Independently of DAQ B) High Level: –look at the collected physics and special run data –try and prove that it is all consistent with itself, has the right symmetries, the right distributions, the right physics, etc.

Run I Monitoring Tools Low Level Tests (BEFORE beam) 1) L1CT system Test/Exerciser/Diagnostics –Run on TCC between stores –WITHOUT interfering with rest of DAQ system –Randomly modify the simulated trigger tower energies AND randomly modifies the L1CT programmable COOR resources –Built-in hardware assistance to change system’s inputs for one single crossing and capture result of THAT Crossing in monitoring registers –Test loop: Compromise between changing more conditions and processing more crossings –Configurable in TT coverage, what gets checked

Run I Monitoring Tools Low Level Tests (BEFORE beam) 1) L1CT System Tester/Exerciser (continued) –Crucial points to design such tests: Maximize amount of electronics switching at once Hardware runs at full speed Capture response at first chance to process THIS information (as opposed to DC response as TCC gets around to reading thousands of registers). Needs hardware assistance built into the system –Capturing multiple time slices is even better Monitoring data captures the switch to different inputs for one single crossing and go back to the background conditions

Run I Monitoring Tools Low Level Tests (BEFORE beam) 2) Pulser runs for precision calibration of Cal –Dan Owen wrote test program and led the L1CT commissioning effort for Run I. –The pulser injects charge at pre-amp of Cal Front-End We see pulser patterns in the L1 CT data. Set the pulser to mid-scale on a few channels at a time Go through a list of pulser patterns –Use mapping of calorimeter cells into trigger towers Predict where and about how much energy L1CT should see Find noisy channels, dead channels, mis-wiring, cross-talk, channels were half the differential signal was missing 1)Cannot calculate exactly how much energy the L1CT should measure (Qualitative, not Quantitative) but LEARN how much we get then be alerted by departure from nominal.

Run I Monitoring Tools Low Level Tests (BEFORE beam) 3) Find_DAC –cf. Description for Run IIa –Compare successive runs: e.g. slow drift = detect problems with L1CT analog front-end capacitors slowly going bad, and replaced them before they completely failed.

Run I Monitoring Tools Low Level Tests (BEFORE beam) Usage: –Between stores, especially after we had worked on L1CT, or after BLS cards were fixed or replaced Run a number of loops of the L1CT Exerciser, take a special L1CT pulser run and analyze data. –Know right then we are ready for physics –First line of defense BEFORE next store, and before any physics runs.

Run I Monitoring Tools High Level Tests (after-the-fact tests) 1) Analysis of L1CT readout data –Kathy Streets led this effort –calculate energy scale, saturation, resolution –studied and watched L1CT on scale of weeks. –Understood and improved L1CT energy scale over the course of Run I and replaced all 1280 hand made precision resistor networks (note: energy gain is now programmable).

Run I Monitoring Tools High Level Tests (after-the-fact tests) 2) Calorimeter Examine –Jan and Joan Guida were also routinely building L1CT histograms to track the L1CT output as part of their watch of Cal electronics –alert us when pedestals would drift –or when we had noisy or dead towers –Jan and Joan kept watching the system on the scale of months/years.

Run I Monitoring Tools High Level Tests (after-the-fact tests) 3) L1CT verifier –Amber and Jill Perkins put together a L1CT Verifier running on Examine An extension of L1SIM (L1FW+L1CT simulator) Compare the computations made by the hardware L1CT to the results from the software simulator. run this program on a subset of the most recent data. –e.g. alerted us of intermittent Missing Pt problem and we found a cable that had worked itself loose

Run I Monitoring Tools High Level Tests (after-the-fact tests) 3) L1CT verifier (continued) –Verifier was an important bit-level check of BOTH the simulator and the L1FW+L1CT hardware, mutually against each other –also confirmation of validity of trigger and MC studies based on L1SIM.