Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.

Slides:



Advertisements
Similar presentations
Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC.
Advertisements

Rodd Pope, SLAC Undulator System April 16-17, 2007 FAC Meeting 1 Undulator System Assembly, Installation, and Integration.
Stephen Milton Undulator System 12 October 2004 Undulator System Update Stephen Milton, ANL.
XFEL Undulator Efforts at DESY and Thoughts on LCLS-II H.-D. Nuhn June 30, 2010.
Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
Geoff Pile FAC Review - Undulator 12 November 2008 LCLS Undulator System Overview and Fabrication Geoff Pile.
FAC, 4/20/06 D. Schultz 1 e-Beams System Update Linac System Preparing for downtime installation. Injector System Installation has started. Undulator System.
Marion M. White Undulator System 07 April 2005 LCLSLCLSLCLSLCLS Undulator System Tests Marion M. White ANL-ASD-LCLS.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
Zachary Wolf Undulator Tuning June 17, 2008 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, S.Kaplunenko,
Geoff Pile FAC Review - Undulator 17 June 2008 LCLS Undulator System Status and Schedule Geoff Pile.
Mark Reichanadter LCLS FAC April 20-21, 2006 Meeting of the LCLS Facilities Advisory Committee LCLS Project Management M.
FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.
John Arthur Photon October 29, Photon Systems Update FAC recommendations Current status New plan for Photon Systems.
1 Zachary Wolf 1 Undulator Tuning Status June 9, 2009 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, D. Jensen,
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Rodd Pope, SLAC Undulator System April 20-21, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC In collaboration.
Stephen Milton Undulator System 14 November, 2004 Undulator System Overview Stephen Milton.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Bob Lill LCLS FAC June 16-18, 2008 RF BPM Status and Production Test Results.
ANL HWR Cryomodule Status Update 27 January 2015 Zachary Conway On behalf of the ANL Linac Development Group Argonne National Laboratory Physics Division.
Hamid Shoaee LCLS FAC Review – October Control System Overview Hamid Shoaee Controls System Manager Injector control system commissioning & Support.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
J. Welch Talk MMF 10/14/04 LCLS Magnetic Measurement Facility Requirements Functional Temperature Vibration Earth's.
Geoff Pile LCLS Und. System Fabrication FAC 29 th, 30 th & 31 st October 2007 LCLS Undulator System Fabrication Schedule FAC.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Gek 16/6/041 ITRP Comments on Question 19 GEK 9/06/04 19) For the X-band (warm) technology, detail the status of the tests of the full rf delivery system.
1 st All Hands Meeting Milton 20 Feb st ANL LCLS All Hands Meeting 20 February, 2006.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
ASTeC Report for CLIC-UK Jim Clarke on behalf of all ASTeC & Technology Department staff contributing to CLIC-UK STFC Daresbury Laboratory, UK CERN-UK.
Option – 5m Undulators What is the optimum length for an LCLS undulator?  XFEL is using 5m undulator segments.  Is this optimum?  What are the advantages.
Mark Reichanadter LCLS FAC October 12-13, 2006 Report to the LCLS Facilities Advisory Committee LCLS Project Management.
D Walters Undulator Systems – BFW April 30, 2008 Production Status of the Quad Spool J Morgan – Engineer Bellows Module Soon-Hong.
Procurement and Manufacture of LCLS Undulators FY 04 Activity: Complete design of Second Prototype Undulator This will include field control comb Procure.
Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 1 LCLS Undulator Diagnostics and Vacuum System Overview Dean R. Walters.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
SCU 3-Lab Review Meeting, Dec. 16, 2014 SCU Presentations Today Intro. & Performance Motivations (P. Emma, SLAC, 20+5) Conceptual Cryostat Design: Option-A.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
Proposed LCLS-II SCU Schedule Soren Prestemon (LBNL) SCU 3-Lab Review Meeting December 16, 2014.
Updated with comments 22 may 2017 Updated again 29 June 2017
TBL, Status, Plans, Experiments
Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006
LCLS Undulator System Detailed Report
Undulator Scope, Management, and Organization
e-Beams Systems Update
Electron Beam Systems ETC and Methodology
Undulator System Components Status Dean Walters
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
Undulator Tuning Status Heinz-Dieter Nuhn, SLAC / LCLS for Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko, Scott Jansson, Ralph Colon, Dave.
Project Management Issues John N. Galayda, SLAC April 24, 2002
LCLS Undulator System Status and Schedule
LCLS Undulator System Production Management
Undulator Tuning Status
E-Beams Systems Manager
LCLS Undulator System Status and Schedule
Undulator System Overview
Undulator Integration Test Status
Electron Beam Systems ETC and Methodology
Undulators Subgroup Summary April FAC Review K. Robinson, J
LCLS Undulator System Detailed Report
Undulator Assembly and Installation Planning
LCLS e- Beams System Overview
e-Beams Systems Update
DOE Status Meeting of the LCLS Project
LCLS e- Beams Systems Manager
LCLS Undulator Magnetic Measurements
Presentation transcript:

Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006

Stephen Milton Undulator System 20 April, 2006 Outline Safety Slide ESH Work Authorization form 1 st Articles Initial Measurements Mu-metal shields Go forward plan SUT Quick Status Long range plan Vacuum System Single path recommendation Focus on solving all issues Full length prototype in June RF BPM Progress Mechanical Brazing Testing Beam Finder Wire Progress OTR S1 Beam Loss Monitoring System Delayed due to engineering availability SLAC Measurements MMF (SLAC) Assembly Planning

Stephen Milton Undulator System 20 April, 2006 Integrated Safety Management Damaged Translation Slide Many Causes Root Issue Did not fully follow all ISM processes Corrective Actions Retraining in ISM basics Additional engineering and administrative controls put in place

Stephen Milton Undulator System 20 April, 2006 Work Authorization Checklist

Stephen Milton Undulator System 20 April, st Articles (See White’s Talk) One each received from the two vendors Initial Measurements and Tuning x/y trajectories well under the 2 micron limit RMS phase error well under the 10 deg. limit

Stephen Milton Undulator System 20 April, 2006 Undulator Production Mu-metal Shields Will be implemented to buck Earth’s field Currently working out the tuning procedure and overall effectiveness Go Ahead Will be given shortly to the vendors pending overall acceptance Production Plans Expect 10 to 15 complete by end of fiscal year

Stephen Milton Undulator System 20 April, 2006 Single Undulator Test (See Pile’s Talk) Phase I Complete assembly with either production or mock up in magnet measurement lab Full fit up expected plan by the end of April Phase II Complete assembly with all production components Tunnel mockup included Will remain at ANL for refinement, trouble shooting, and value engineering

Stephen Milton Undulator System 20 April, 2006 Vacuum System (See Walter’s Talk) Single Path Pursued Our project management oversight group was adamant about not pursuing an alternate time. Considered too costly Make what we have work Current focus Solve all issues Prototype Full length prototype expected late June early July completion Schedule Still considered an undulator system critical path item

Stephen Milton Undulator System 20 April, 2006 RF BPM First Prototype Completed Bench Measurements No surprises Installation for Beam Test Planned to install in ITS by end of month 3 BPM Test Planned installation mid to late summer Schedule Still considered an undulator system critical path item

Stephen Milton Undulator System 20 April, 2006 Beam Finder Wire (See Walter’s Talk) Excellent Progress Testing of positioning Excellent results 5 micron repeatability Expect Prototype Mid Summer

Stephen Milton Undulator System 20 April, 2006 OTR S1 Location Near beam dump after analyzing magnet at 135 MeV point in linac Performance Similar to what ANL was designing for the undulator Plan Build what we had designed for phase I and test in operation Improve design performance if warranted in the future

Stephen Milton Undulator System 20 April, 2006 Beam Loss Monitoring System Basic concept established Details, however, are not Schedule Not yet on critical path, but we clearly are falling behind on the plan Plan Get an appropriate engineer and physicist on this This has proven difficult to maintain

Stephen Milton Undulator System 20 April, 2006 SLAC Work Measurement Bench (See Wolf’s talk) ANL bench on loan for development of overall production measurement and tuning plan Prototype undulator at SLAC Magnet Measurement Facility (See Wolf and Pope’s Talks) Building construction completed Equipment to move in in the coming weeks This will be a busy place

Stephen Milton Undulator System 20 April, 2006 Assembly Planning (See Pope’s Talk) SLAC working closely with ANL The SUT will be used heavily in refining overall assembly sequence Component delivery Schedule and assemble being refined to match planned component arrivals This is already forcing us to optimize our effort planning to improve the arrival timing

Stephen Milton Undulator System 20 April, 2006 Summary Things are getting exciting Production undulators are starting to arrive and be measured There is still much to be done There are a few kinks we need to work out Eg. The beam loss monitor work We must keep our eye on some key items BPMs Vacuum Chambers But we still believe we will meet all our critical milestones while not compromising performance