Anthony AffolderUS CMS Meeting 12/3/2002Proposal of UCSB Short-term Testing Program Assumptions Electrical and optical hybrids not burnt-in prior to arrival.

Slides:



Advertisements
Similar presentations
Sci-Fi tracker for IT replacement 1 Lausanne 9. December 2010.
Advertisements

1/8/04Lance Simms Thermal Testing of TOB/TEC Hybrids at UCSB.
Slide 1L3 Testing Meeting March 7, 2003UCSB Status-Anthony Affolder UCSB Testing Status Anthony Affolder (for the UCSB module testing group) Current testing.
Thermal Testing of TEC/TOB Hybrids at UCSB 1/20/04 Slide 1 Thermal Testing of TOB/TEC Hybrids at UCSB.
Slide 1Module Testing Meeting March 7, 2003US Hybrid/Module/Rod Testing Model-Anthony Affolder US Hybrid/Module/Rod Testing Model Anthony Affolder (for.
Slide 1Module Testing Meeting Jan. 29, 2002CMS Module Testing Issues-Anthony Affolder CMS Module Testing Issues From a CDF Testing Experience Perspective.
Slide 1PMG Jan CMS Module Testing Issues-Anthony Affolder CMS Module Testing Issues Perspective from a large scale production project Anthony Affolder.
Slide 1X-Calibration Common Testing Issues-Anthony AffolderModule Testing Meeting, June 3, 2003 X-Calibration Common Testing Issues: Grounding, Environmental.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
Slide 1UCSB Rod Production presented by Jim LambDOE review, January 20, 2004 UCSB Rod Production UCSB Rod Production, Jan , presented by Jim Lamb.
Slide 1 Control Software for the CMS Pixel Readout 28 April 2004 R.Stone, Rutgers (J.Doroshenko, DW.Kim, U.Joshi, L.Perera, J.C. Yun, et al) CMS Pixel.
Anthony AffolderUS CMS Meeting 12/3/02Previous Burn-in Experience CDF Burn-in Experience Hybrid Burn-in à 4 days with extensive tests at start/end à ~9.
Slide 1 Anthony Affolder US Silicon Meeting, March 9, 2004 Equipment Status ARCS equipment status à Single module and 4 hybrid DAQ equipment status à Vienna.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
1 US Testing Status-Anthony AffolderModule Testing Meeting, Dec. 11, 2003 Update of US Testing Status Anthony Affolder On behalf of the US testing group.
Slide 1Rod Production presented by Jim Lamb (UCSB)April 9, 2004 Rod Production Rod Production, April , presented by Jim Lamb (UCSB)
US CMS Silicon Electronics Testing – CMS Lehman Review - May 21, Affolder1 US CMS Silicon Electronics Testing US CMS Lehman Review BNL 5/21/03 A.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
Slide 1Module Testing Meeting Jan. 29, 2002CMS Module Testing Issues-Anthony Affolder CMS Module Testing Issues From a CDF Testing Experience Perspective.
CMS Tracker Week – Module Test Meeting – April 2003 – Patrick Gartung 1 Status of US long term module testing Patrick Gartung University of California,
Anthony AffolderUS CMS Meeting 12/3/02DAQ Based Systems LV/HV Needs DAQ Power Supply Needs HV à 600 V/~1mA range –0.1-1  A Current Sensing –Over Voltage/Current.
Oct, 2000CMS Tracker Electronics1 APV25s1 STATUS Testing started beginning September 1 wafer cut, others left for probing 10 chips mounted on test boards.
AHCAL Electronics. Front-end electronics and DAQ Mathias Reinecke CALICE meeting Hamburg March 21st, 2013.
Preliminary measurements for the 8 channel prototype of SPD discriminator ASIC I.The 8 channel prototype. II.Status of the test. III.Noise. IV.Gain. V.Test.
SCT Week -CERN- September 23, Defective ASIC’s A. Ciocio - LBNL.
AHCAL Electronics. Status and Outlook Mathias Reinecke CALICE collaboration meeting Cambridge, UK March 16th-19th, 2012.
Qualification Test of UFE Board  Schematic diagram of UFE  Board types and current status  Qualification test procedures  VA & UFE test setup 
Abe Seiden December 2003 SCT Week S USA SCT Barrel Module Assembly SCT Week CERN December 2003 Presented by Abe Seiden U.C. Santa Cruz.
Preparation of Module Assembly and Stringtest Haridas, Heinz, Marge One possibility for an assembly and test line? Preparation of a full string test –aim.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
Michał Dwużnik, for the SCT collaboration
Trip-t testing progress report
AHCAL Electronics. SPIROC2 and HBU measurement results Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.
SRS Calibration Michael Phipps, Bob Azmoun, Craig Woody 1.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
Electrical Tests of Modules and Ladders Markus Friedl (HEPHY Vienna) 2 October 2014.
S-band processing electronics R. Ainsworth (summer student), S. Boogert, G. Boorman (Royal Holloway) A. Lyapine (University College London) Weekly ATF2.
NA61 PSD. Upgrade status. Institute for Nuclear Research RAS, Moscow.
CMS Module Testing & Quality Assurance
APV Lectures APV FE Basic Building Blocks How Our Testing Works
UCSB Testing Status Anthony Affolder
Update of US Testing Status
UCSB Testing Status Anthony Affolder
APV Lectures APV FE Basic Building Blocks How Our Testing Works
UCSB Short-term Testing Plan
CMS Module Testing Issues
UCSB Testing 3 Stereo Modules Tested 1 SS6 Module Tested
Results from module testing
UCSB Testing Status Anthony Affolder
Recent TOB Developments
On behalf of the US TOB testing group
First Assembled Rod in US
US Testing Update Anthony Affolder (On behalf of the US testing group)
UCSB Short-term Testing Plan
BESIII EMC electronics
UCSB Qualification Module Grading
Hybrid & Module Electrical Testing
First UCSB TEC Module (Pictures)
US Hybrid/Module/Rod Testing Model
Anthony Affolder UC Santa Barbara
US Module Testing Progress Report
Operations/Failure Analysis
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Setup for testing LHCb Inner Tracker Modules
US Module Testing Progress Report
Hybrid & Module Testing Status
Equipment Status ARCS equipment status DAQ equipment status
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
Presentation transcript:

Anthony AffolderUS CMS Meeting 12/3/2002Proposal of UCSB Short-term Testing Program Assumptions Electrical and optical hybrids not burnt-in prior to arrival at UCSB/FNAL à No burn-in program for foreseen before full production Rod components currently scheduled to arrive much later than module components (~6 month) à Large supply of finished modules prior to rod construction à Minimal information of long-term stability of most components –Necessitates burn-in of a fraction of modules prior to rod construction Sample each construction jig periodically Vienna cold box and rod burn-in only systems viable for such a program à Vienna cold box software already tested and written

Anthony AffolderUS CMS Meeting 12/3/2002Proposal of UCSB Short-term Testing Program UCSB Short-term Testing Plan Characterize hybrid (+PA) on arrival à Basic functionality and deep test (ARC) –Specific bad channel requirements for hybrid (+PA) Re-characterize module on completion of construction à Basic functionality, deep test, IV curves (ARC) –Different bad channel requirement for module Vienna cold box test fraction of modules (DAQ) à Acts as ~24 hour module burn-in –Scaled bad channel requirements for change in gain, grounding, etc. –Identifies mechanical/bond/electrical weaknesses prior to production of large number of modules –Reduces reworking of rod/retrofitting of modules

Anthony AffolderUS CMS Meeting 12/3/2002Proposal of UCSB Short-term Testing Program Deep Test Modifications Make bad channel requirements specific to component type tested à (hybrid, hybrid+PA, module) Remove/loosen relative percentage/sigma requirements Tighten/add fixed requirements Motivate requirements on silicon tracker performance

Anthony AffolderUS CMS Meeting 12/3/2002Proposal of UCSB Short-term Testing Program Pedestal/Noise Test Increase minimum noise test à Fractional requirements too wide to discern saturated/dead FE preamplifier Replace fractional pedestal requirements with |P i -P chip |<P cut à P cut motivated by decrease in dynamic range of channel Special requirements on chip edges if necessary

Anthony AffolderUS CMS Meeting 12/3/2002Proposal of UCSB Short-term Testing Program Pulse Shape Test Remove current pulse shape requirements à Include rise-time/fall-time/peak-time requirement Replace pulse shape with gain measurement à Measure pulse heights at 6-13 calibration injection setting between 0-3 MIPs and fit à Require gain between G low and G high –Gain uniformity specification Calibration circuit may not be uniform  Require  2 <  2 cut (  2 based on noise measurement) –Finds non-linear charge response and gain non-uniformities Should be relatively simple to include in ARC software See following example

Anthony AffolderUS CMS Meeting 12/3/2002Proposal of UCSB Short-term Testing Program Hybrid Gain Measurement(1) 0-3 MIPs MIPs

Anthony AffolderUS CMS Meeting 12/3/2002Proposal of UCSB Short-term Testing Program Hybrid Gain Measurements(2) Three channels’ pulse height vs. MIP injected à First ‘regular’ à Second 1 st channel of chip 3 à Third 63 th channel of chip 3 Gain non-uniform and bad  2 if 0 MIP point included for chip 3 Improved if 0 MIP excluded Mostly likely calibration circuit non-uniformities

Anthony AffolderUS CMS Meeting 12/3/2002Proposal of UCSB Short-term Testing Program Pipeline Test Add pipeline capacitor pedestal/noise requirement à Widen relative to channel requirement according to decreased statistics Add pipeline column pedestal/noise requirement Remove bad capacitors/columns from channel pedestal/noise calculation

Anthony AffolderUS CMS Meeting 12/3/2002Proposal of UCSB Short-term Testing Program Ladder Grading Grade ladders by fraction of bad capacitors à Bad channel=190 capacitors à Bad column=128 capacitors Treat chip edges differently (if necessary)

Anthony AffolderUS CMS Meeting 12/3/2002Proposal of UCSB Short-term Testing Program Necessary Infrastructure DAQ with 10 hybrid channels LV/HV power supplies à Reusable for rod burn-in Vienna cold box DI/O PC board 1.5 kW chiller Module carriers