PEANUT meeting Fermilab Giovanni and Komatsu 23/Jan./2007.

Slides:



Advertisements
Similar presentations
May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of.
Advertisements

1 Status report of the PEANUT analysis Giovanni De Lellis Collaboration Meeting, June 5th 2007, Maiori.
PEANUT Nagoya 2006/12/08 M. Komatsu. Scanning trials Feb : BL039,040,041,050,052,060 –PL1 and 2 scanned with S-UTS prototype. –SFT matching.
Muon Identification Antoine Cazes Laboratoire de l’ Accelerateur Lineaire OPERA Collaboration Meeting in Frascatti Physics coordination meeting. October.
Carbon ion fragmentation study for medical applications Protons (hadrons in general) especially suitable for deep-sited tumors (brain, neck base, prostate)
Emulsion scanning: present status and plans for the coming run Giovanni De Lellis.
Vertex location status of Japan Nagoya vertex hunting team Y.Nonoyama, K.Hamada, S.Takahashi, H.Kubota, R.Komatani 2009 Jan 22 OPERA Japan Meeting.
Performance of Compton Alignment in OPERA CS, 2008 run Seigo Miyamoto Jan., 2009, MIZUNAMI.
PEANUT 2nd RUN proposal Oct. 12, 2006 M. Komatsu.
OPERA brick (16215) scanning results Luisa Arrabito on behalf of Lyon Scanning Group Emulsion Workshop Nagoya 22th-23th January 2008.
Cristiano Bozza – European Emulsion Scanning Group – Nagoya Jan OPERA brick scanning by the European Scanning System.
Gyaku(Inverse) Data Base Y.Nonoyama Nagoya Univ. New idea of Emulsion track link to SFT trigger in PEANUT.
CSd analysis Natalia for the European CS Scanning Team.
NetScan for BL118 PEANUT Fermilab 22-23/Jan/2007.
Stack to Stack connection O.Sato. Motivation Emulsion coordinate aligned to TT coordinate by Komatsu :: CTransEmulToTT(*); Emulsion tracks.
Plan for Jan. to Mar. Dec. 11, 2005 M. Komatsu. Current status We have no manpower after end of Dec. –Nonoyama should finish his master thesis. New Muon.
Reconstruction of neutrino interactions in PEANUT in general scanning (unbiased) mode Giovanni De Lellis on behalf of Andrea Russo Naples University.
CS LNGS Current status and perspectives.
I. Kreslo, LHEP, Bern Bern Scanning Laboratory Hunting muonless interactions...
Kouji Narita Nagoya University, Japan CHORUS collaboration Study of charm production in neutrino interactions.
Location in CSD of electronic detector reconstructed events Scanning results from LNGS scanning lab N. D’Ambrosio, N. Di Marco, L.S. Esposito, P. Monacelli.
1 ECC NuMI near hall Second life of DONUT detector DONUT members, (Nagoya) and Lyon Nagoya University M. Komatsu.
Study of the fragmentation of Carbon ions for medical applications Protons (hadrons in general) especially suitable for deep-sited tumors (brain, neck.
Film Storage and book-keeping Scanning Quality Control Cosmic Ray Density Vertex Confirmation Vertex Location WG4 summary.
Vertex localization in Lyon Emulsion Workshop 7th-9th Dec. 2006, Nagoya Luisa Arrabito – IPN Lyon.
NC like event location 9 th /Dec/2006 OPERA Emulsion Work Shop T. Fukuda, K. Morishima, N. Nagoya univ.
Evaluation of SySal efficiencies for 1  sample Chorus Collaboration Meeting Ishigaki,7-8 April 2003 Emiliano Barbuto, Chiara Sirignano, Salvatore Sorrentino.
Time stamping for Emulsion Tracks with Gyaku Data Base method Y.Nonoyama.
BL007, BL039 and BL040 PL01-PL02 Scanning Result K. Narita Nagoya University Dec PEANUT meeting.
Neutrino Event location Connection from Electric Detector to Emulsion Detector Tsutomu FUKUDA Fundamental Particle Physics Lab, Nagoya-univ 9th March,
Status of Napoli scanning laboratory OPERA Emulsion Workshop, Nagoya, 7/12/2006 F. Di Capua on behalf of Napoli group.
Status of “Full scanning” 2007/ 03/ 26 Y.Nonoyama.
Umut Kose Neutrino interaction location in the OPERA Experiment New Development of Flavor Physics, , Tennomaru, Gamagori Nagoya University.
PEANUT exposure summary and brick distribution and Situation of PEANUT analysis Fermilab.
Scanning status in Europe Giovanni De Lellis University of Naples.
CS to brick and track follow-up ● Cosmic ray test ● CS scanning ● CS to brick connection ● Track following Napoli Scanning Lab.
MonteCarlo simulation of neutrino interactions in PEANUT Giovanni De Lellis on behalf of Alberto Marotta and Andrea Russo Naples University.
Hybrid emulsion detector for the neutrino factory Giovanni De Lellis University of Naples“Federico II” Recall the physics case The detector technology.
Reconstruction of neutrino interactions in PEANUT G.D.L., Andrea Russo, Luca Scotto Lavina Naples University.
Status of the OPERA experiment Yoshiaki Nonoyama Nagoya Univ.
EM shower reconstruction and located neutrino event analysis Ciro Pistillo (Bern LHEP) on behalf of the Swiss OPERA groups.
BOLOGNA Scanning Lab INFN - Sezione di BOLOGNA Physics Dep. of Alma Mater Studiorum Università di Bologna M.Pozzato – Ankara – 09/04/02.
1 RUN 2008 OPERA events: Status Report M. Ieva on behalf of Bari Emulsion Lab OPERA Collaboration Meeting, April 1st - 5th, 2009.
Status of the NO ν A Near Detector Prototype Timothy Kutnink Iowa State University For the NOvA Collaboration.
OPERA Experiment, Brick Finding Program A. Chukanov Joint Institute for Nuclear Research ISU, 12 th February, 2007.
OPERA Emulsion Workshop – Nagoya, 7-9 Dec From CS to Brick: first results from low density cosmic ray exposure at LNGS M. De Serio from Bari emulsion.
Preliminary Results from the MINER A Experiment Deborah Harris Fermilab on behalf of the MINERvA Collaboration.
LM Feb SSD status and Plans for Year 5 Lilian Martin - SUBATECH STAR Collaboration Meeting BNL - February 2005.
Muon absolute flux measurement in anti-neutrino mode A.Ariga 1, C. Pistillo 1, S. Aoki 2 1 University of Bern, 2 Kobe University.
OPERA Physics Coordination, CERN, 03/05/2006 Effect of  and  radiation on the on-line emulsion scanning M. Cozzi for the Bologna group.
European Scanning System: status report. DRY Fill factor 92.4 ± 1.6 % DB-driven Scan-back and Total Scan in Bari OIL Fill factor 93.1 ± 1.2 % Brick #8,
T2K muon measurement 2014 Momentum module A.Ariga, C. Pistillo University of Bern S. Aoki Kobe University 1.
04/04/2008LNGS, OPERA Collaboration Meeting1 Simulation/Reconstruction Software activity of JINR group /Dmitry V.Naumov A.Chukanov, S.Dmitrievsky, Yu.
Event Location Rehearsal in PEANUT Bricks OPERA collaboration meeting Gran Sasso, May 2006 Kodama, Sato, Fukuda, Komatsu, Narita, Nonoyama NAGOYA.
T2K Status Report. The Accelerator Complex a Beamline Performance 3 First T2K run completed January to June x protons accumulated.
OPERA Experiment, Brick Finding Program A. Chukanov Joint Institute for Nuclear Research Dubna, 25 th January, 2007.
BENE MECC detector Pasquale Migliozzi INFN – Napoli.
NBI2006 Starting OPERA data-taking with the CNGS beam D.Autiero IN2P3/IPN Lyon 5/9/2006.
G.Sirri – INFN Bologna LNGS /19 Status Report of the Bologna Scanning Lab Bologna Scanning Lab Last activities in the Bologna scanning lab.
Emulsion Test Beam first results Annarita Buonaura, Valeri Tioukov On behalf of Napoli emulsion group This activity was supported by AIDA2020.
Minerva Test Beam 2 Status Geoff Savage for the Test Beam 2 Team March 23, /23/2015AEM - Minerva Test Beam 2 Status1.
Electromagnetic shower reconstruction with emulsion films in the OPERA experiment F. Juget IPH Université de Neuchâtel On behalf of the OPERA collaboration.
Characterization of muon beam in T2K with emulsion detectors A. Ariga, T. Ariga, C. Pistillo AEC-LHEP University of Bern 1.
Measuring Nuclear Effects with MINERnA APS April Meeting 2011 G. Arturo Fiorentini Centro Brasileiro de Pesquisas Físicas On behalf of the MINERnA collaboration.
Nuclear emulsions One of the eldest particle detectors, still used in particle physics experiment (CHORUS, DONUT, OPERA) for its unique peculiarities:
T. Ariga AEC-LHEP, University of Bern
Status of the OPERA experiment
Pure  exposure for e/ separation
Chris Smith California Institute of Technology EPS Conference 2003
OPERETTE TEST BEAM EXPERIMENT :
Presentation transcript:

PEANUT meeting Fermilab Giovanni and Komatsu 23/Jan./2007

Agenda 1. NuMI - MINOS Short summary of NuMI-MINOS status... Gina 2. PEANUT summary Situation of PEANUT analysis... Komatsu European Scanning System(ESS)... Giovanni SUTS status... Komatsu 3. SFT based analysis PoT of PEANUT... Gina Scanback result of BL Fukuda Time stumping for Emulsion tracks... Nonoyama Activity in Naples... Giovanni Summary of European lab analysis... Giovanni 4. Non-bias analysis Full area scanning in Naples... Giovanni SUTS scanning of BL Morishima NetScan for BL Komatsu 5. Discussion for paper 6. New exposure NuMI-MINERvA plan and schedule... Vittorio Exposure plan Gina reported about PoT of NuMI She will provide PoT corresponds to PEANUT exposure period. Giovanni and Komatsu made a review of Scanning system we have. Two main analysis scheme is reported, One is SFT based analysis and the other is general scan. Then we discussed work sharing between US side and Japan and Europe side.

PEANUT period

Situation of PEANUT analysis Before last December, works in each lab was not synchronized. –We re-form PEANUT analysis working group to work for physics output. –Regular meeting (video link) is scheduled. We decided to do PEANUT analysis in OPERA frame work at least for all labs. –CS(PL2 and 2) scanning –Scanback First phase : SFT matching required Second phase : All CS tracks Non-bias analysis, apart from OPERA

Scanning status in Europe Giovanni De Lellis University of Naples

Brick number Brick wall Lab Exposure days Cosmic rays (h) SFT align ment SFT trigger Emulsion-SFT position offset (resolution) μm Emulsion-SFT angular offset (resolution) mrad Scanning modeIn progress BL0892Bari2812OK3-D tracks5310 (792), 3359 (735)3 (17), 5 (15)predictiontotal scan BL0422Bari212not yetgeneral 37cm 2 for 3 platesSFT alignment BL0912Bari2812not yetgeneral 26cm 2 for 3 platesSFT alignment BL0922Bern3012OK BL0341Bologna182OK9/20 planes9072 (770), 1755 (890)6 (8), 6 (9)general 80cm 2 for 26 platesgeneral scan BL0442Bologna212OKgeneral 30cm 2 for 57 plates BL0882Bologna2812OK9/20 planes10564 (474), 3456 (566)10 (7), 10 (10) general 80cm 2 for 23 plates; scan-back from triplets (250) total scan Lyon BL0452LNGS202not yet general: 16cm 2 for 3 plates; 80cm 2 for 2 plates; 16cm 2 for 3 plates with new filter SFT alignment BL0563LNGS2112not yetgeneral 16cm 2 for 2 platesSFT alignment BL0331Naples182OK9/20 planes (605), (443)-24. (5.), -3. (8.) general 48cm 2 for 43 plates and 24cm 2 for 57 plates general BL0462Naples182OK7/20 planes-6830 (430), (430)-3. (6.), -3. (8.)general 100cm 2 for 3 plates BL0543Naples2112not yet general 9cm 2 for 7 plates (efficiency) BL0432Neuchatel212not yet general 16cm 2 for 18 plates scan-back from 3 first plates volume scan - SFT alignement BL0811Salerno3612OK3D Tracks-6164 (491), (482)-7. (7.), -7. (7.)General on 2 plates BL0821Salerno3612OK3D Tracks-4237 (490), (484)-8. (7.), -13. (7.)General on 2 plates BL0472Salerno212OK3D Tracks-5700 (745), (465)-12. (5.), -9. (4.)General on 2 plates

Conclusion 17 bricks under analysis in Europe (about 1000 events expected) Emulsion to SFT alignment performed for the majority of them The scan-back has been performed in a few bricks only Different criteria have been used: SFT triggers, SFT- emulsion matching and volume around the stopping point to be scanned (skewed, how many, etc..) Unification of all the cuts is ongoing: trigger conditions, SFT matching criteria and volume scanning standardized After a quick revision of the analysis, it will be possible to merge all the data

Time stamping for Emulsion Tracks with Gyaku Data Base method Y.Nonoyama

Residual of Emulsion track to hits of directory below plane This showed residual. extension emulsion track to below SFT plane. Select tracks matching with SFT trigger as Rock Muon type by eyes. y x x y 2 3 mm If matching is real, its residual will be into 500  m. mm

PL 43 I.P. 1.5  m

summary Now looking for good separation parameter. One is below SFT plane hits. This selection power is very good. Bud SFT link efficiency is effected by SFT efficiency. So, other selection parameter will be needed for efficiency.

Reconstruction of neutrino interactions in PEANUT in general scanning (unbiased) mode Giovanni De Lellis on behalf of Andrea Russo Naples University

Scanning areas All 57 plates have been general scanned: 5.55 x 4.30 cm^2 = 23.9cm^2 General scanning mode Measured density of aligned base-tracks: 4 base-track / mm 2 (transportation order) 0.7 base-track / mm 2 (assembly order) 38 plates have been general scanned: 11.1 x 4.30 cm^2 = 47.8 cm^2

Beam tracks at least 4 segments in the plots shown NuMI beam peak (  x,  y ) ~ (-50,0) mrad MIP particles: ~ 24 Tracking efficiency Density of aligned base-tracks ~ 0.7 / mm 2

Expected number of events in the brick BeamBeginEndDuration (days) NEUTRINO 2005/10/20 16: /11/07 09: COSMIC 2005/11/07 09: /11/07 11: Neutrino interaction rate in an iron target exposed to NuMI in the near hall (2 * 10 5 ) / (year * ton) 43 ± 7 neutrino interactions expected in the analyzed volume N mes /  total = 44 ± 9 neutrino interactions estimated from the 24 observed events after efficiency correction This value (increased by 8%) accounts for the lead target

Conclusions A volume of 413 cm 3 (58% of the brick volume) was general scanned in one PEANUT brick Detailed single brick Monte Carlo simulation of PEANUT used to define a procedure to identify neutrino interactions 24 neutrino interactions with SFT matching have been identified in the volume After the efficiency correction, we estimate (44 ± 9) neutrino interactions happening in the volume Good agreement with the number of expected events (43 ± 7) computed from the flux 8 events with larger multiplicity found without any match with the SFT (6 with 3 tracks, 1 with 4 and 1 with 9 tracks)

NetScan for BL118 PEANUT Fermilab 22-23/Jan/2007

Possibility of non-bias analysis Naples already did full scanning for one brick. –Giovanni’s report Pilot analysis of BL118 NetScan is started. –5x5 25cm 2 area is scanned by SUTS Today I report first 21 plate data. We used base track for NetScan framework –For the first attempt. –How much we can reduce scanning power is next subject.

Nagoya->Fermilab Fermilab->Nagoya Pulse Height distribution

Nagoya->Fermilab Fermilab->Nagoya Efficiency as a function of slope

Alignment in exposure Virtual erasing is applied –3,530,479 base track remains for 21 plate. –Right table shows number of base tracks for each plate. –Still large amount of junk base track is there. ECFSAL –139,777 track (nseg>=2) are reconstructed. 128,015(2seg), 8,294 track (3seg) 3,468 track (nseg>=4) –Too large amount of nseg<=3 To reduce junk track, I applied 30mrad angular much for nseg<=3 tracks Reduced to 37,125(2seg), 1,475(3seg) f f f f f f f f f f f f f f f f f f f f f total

4 segment or more track

Eff. As a function of slope Eff. As a function of plate

Preliminary vertex hunting ECVTXA is used for preliminary vertex hunting Another 23 two track vertex IP<20 is exist. Local alignment is not done.

Summary Apart from OPERA, NetScan is good method to perform non-bias neutrino interaction analysis. –Especially for electron neutrino location. NetScan with SUTS is feasible. –But, currently noise track density is bit too high to do clean analysis.SUTS scanning should be well tuned. –Also, cut applied for base track is too tight.Should be revised.

Discussion for paper We agree on two types of output –SFT track based scanback. –General scan to detect electron neutrino flux. US provide PoT and SFT-MINOS matching information soon. –Komatsu (Luca) provide list of SFT 3D tracks. Already sub-sample matching has done in year ago. One target date to make summary is mid April (MINOS-meeting is scheduled)

Location of MINERvA

Schedule of various MINER A detectors… Calibration DB Slow Controls, Monitoring Core Reconstruction Software Neutrino Beam Simulations, Measurements Detector Simulation “Real” DAQ (From December 2006 Miner a collaboration meeting)

Possibility of new exposure There is interference between PEANUT and MINERvA. –MINERvA installation will start on end of 2007 –Summer shutdown is foreseen in June or July. –PEANUT detector should move to somewhere before MINERvA installation start. Komatsu propose possible configuration for new exposure with lighter brick (not OPERA brick). –T952 second run needs some paper works to be approved.