LGS Project Meeting November 9, 2006. 2 Outline 1.Project infrastructure 2.PALM-3000 update 3.LGS subsystem updates –Optical bench –LGS facility –AO software.

Slides:



Advertisements
Similar presentations
Hardware Integration of the Prototype Wes Grammer NRAO September 24-26, 2012EOVSA Prototype Review1.
Advertisements

1 Keck LGS AO Planning Workshop: Overview, Requirements & Schedule December 5, 2004.
1 Parametric Oscillator Demonstration for NGAO Requirements Review Sept 9, 2010.
(Use space bar to step through presentation)
The Project Office Perspective Antonin Bouchez 1GMT AO Workshop, Canberra Nov
Laser guide star adaptive optics at the Keck Observatory Adam R. Contos, Peter L. Wizinowich, Scott K. Hartman, David Le Mignant, Christopher R. Neyman,
LBT AGW units Design Review Mar.2001 General Concept Performance specifications and goals The off-axis unit The mechanical support structure The control.
System-wide issues Before we get to the telescope System integration and verification at the telescope Operations Maintenance and support.
PALM-3000 Management Update A. Bouchez, J. Roberts Team Meeting #15 10/29/09.
PALM-3000 PALM-3000 Instrument Requirements Antonin Bouchez PALM-3000 Requirements Review November 12, 2007.
PALM-3000 PALM-3000 Management Update Antonin Bouchez, Jenny Roberts Team Meeting #7 27 February, 2008.
NIR LOWFS for Keck and TMT Roger Smith & David Hale.
PALM PALM-3000 project status 31 Jan COO All-Hands Mtg. Recent Milestones Requirements review on 12 Nov AO system offline for maintenance.
PALM-3000 Management Update A. Bouchez Team Meeting #9 10/22/2008.
LGS WFS Design Status & Issues Dekany, Delacroix, & Velur Caltech Optical Observatories.
PALM-3000 P3K Integration and Test Review Stephen Guiwits P3K System Computers and Electronics 273 Cahill September 22, 2010.
PALM-3000 Integration and Testing Status A. Bouchez Team Meeting #15 10/29/2009.
PALM-3000 PALM-3000 Instrument Architecture Antonin Bouchez PALM-3000 Requirements Review November 12, 2007.
PALM-3000 PALM-3000 Status A.H. Bouchez, J.E. Roberts Project 1640 Las Vegas Summit 1/28/2010.
PALM-3000 P3K Stimulus Design Update Rick Burruss P3K Team Meeting #7 February 27, 2008.
LGS Project Meeting February 1, 2006 Agenda 1.IPT status updates: Laser facility, AO optomechanics, AO software (Bouchez, Roberts, Trinh; 30 min) 2.Sum-Frequency.
WFS Preliminary design phase report I V. Velur, J. Bell, A. Moore, C. Neyman Design Meeting (Team meeting #10) Sept 17 th, 2007.
NGAO Alignment Plan See KAON 719 P. Wizinowich. 2 Introduction KAON 719 is intended to define & describe the alignments that will need to be performed.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
Palomar Laser Guide Star Adaptive Optics Antonin Bouchez & Mitchell Troy John Angione, Rick Burruss, John Cromer, Richard Dekany, Steve Guiwits, John Henning,
PALM-3000 Optical Bench Update Jenny Roberts Optical Bench Team: C. Baranec, A. Bouchez, K. Bui, R. Burruss Team Meeting #15 10/29/2009.
PALM-3000 PALM-3000 Software Requirements Review Thang Trinh PALM-3000 Requirements Review, Caltech Campus November 12, 2007.
LGS-AO Performance Characterization Plan AOWG meeting Dec. 5, 2003 A. Bouchez, D. Le Mignant, M. van Dam for the Keck AO team.
PALM-3000 Instruments update A. Bouchez Team Meeting #9 22 Oct
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
PALM-3000 Team Meeting #15 – Wavefront Sensor(s) C. Baranec October 29 th 2009.
Agenda (Fri., June 7) 8:00AO UI Demonstration 9:00Introductions to AO team 9:05AOWG Chair Selection 9:15Review Agenda (make changes?) 9:20Review Planned.
PALM-3000 PALM3000 Realignment Winter Jenny Roberts Optical Bench Team: C. Baranec, A. Bouchez, K. Bui, R. Burruss, R. Dekany, M. Troy Layout.
Design Team Report: AO Operational Tools (aka Acquisition and Diagnostics) Christopher Neyman W. M. Keck Observatory (for the Operational tools team) Keck.
Keck Laser Guide Star Adaptive Optics System: 1 st & 2 nd Milestones AOWG Telecon Oct. 17, 2003 A. Bouchez, J. Chin, A. Contos, S. Hartman, E. Johansson,
PALM-3000 Systems Engineering R. Dekany, A. Bouchez 9/22/10 Integration & Testing Review.
PALM-3000 Budget and Schedule Update A. Bouchez, J. Roberts Team Meeting #10 1/8/2009.
P. Wizinowich & D. Le Mignant for Keck AO Team AOWG – June 6, 2002 Keck AO Overview to support summit tour.
LGS diagnostics Results (so far) Anna Moore, Hal Petrie LGS facility meeting 30 th Jan 2007.
AO Opto-mechanical System Design Status, Issues, and Plans Don Gavel UCO/Lick Observatory (for the opto-mechanical design team) Keck NGAO Team Meeting.
Design Team Report: AO Operational Tools (aka Acquisition and Diagnostics) Christopher Neyman W. M. Keck Observatory (for the Operational tools team) Keck.
5 th February 2010 FP7 Prep WP9000 Progress Meeting 1 Update Tim Morris Durham University FP7 Prep WP 9340.
The Gemini MCAO System (EPICS Meeting, SLAC, April 2005) 1 The Gemini MCAO System Andy Foster Observatory Sciences Ltd.
NGAO Controls Team Kickoff Meeting August 5, 2008 Erik Johansson.
Keck AO Operations D. Le Mignant for the Keck AO team.
E-LABORATORY PRACTICAL TEACHING FOR APPLIED ENGINEERING SCIENCES W O R K S H O P University of Oradea, Romania February 6, 2012 G E N E R A L P R E S E.
MCAO Adaptive Optics Module Mechanical Design Eric James.
1 FRIDA Engineering Status 17/05/07 Engineering Status May 17, 2007 F.J. Fuentes InFraRed Imager and Dissector for Adaptive Optics.
1 Palomar Tomograph V. Velur 1, B. Platt 2, M. Britton 1, R. Dekany 1 1 Caltech Optical Observatories, California Institute of Technology 2 Interferometry.
Herschel Space ObservatoryPACS Science Verification ReviewMPE 22/23 June 2006 GJ / MPE 1 PACS Test Facility Capabilities – Cryogenics and OGSE Gerd Jakob.
MARS Design Review PP-1 Requirements Definition Performance: –Tip/Tilt error < 0.06″ rms mirror coordinates 0.12″ rms image coodinates 0.28″ fwhm image.
Telescope Integration and Tests Tuesday Afternoon.
AO review meeting, Florence, November FLAO operating Modes Presented by: S. Esposito Osservatorio Astrofisico di Arcetri / INAF.
FLAO system test plan in solar tower S. Esposito, G. Brusa, L. Busoni FLAO system external review, Florence, 30/31 March 2009.
04. November 2004 A. Freise A. Freise, M. Loupias Collaboration Meeting November 04, 2004 Alignment Status.
Hobby - Eberly Telescope MARS Software Design Review November 2002 Michael H. Ward Systems Analyst McDonald Observatory MHW 04-November
Nov 3, 2009 RN - 1 Jet Propulsion Laboratory California Institute of Technology Current Developments for VLBI Data Acquisition Equipment at JPL Robert.
1 Virgo Commissioning progress ILIAS, Nov 13 th 2006 Matteo Barsuglia on behalf of the Commissioning Team.
AO188/LGS Status and Schedule 1 Yutaka Hayano January 31, 2008.
D. Measurement Approach Phil Hinz Principal Investigator.
The DIAMON Project Monitoring and Diagnostics for the CERN Controls Infrastructure Pierre Charrue, Mark Buttner, Joel Lauener, Katarina Sigerud, Maciej.
Wiimote/Kinect Lab Midterm Update Senior Design December 2011, Group 16 Adviser: Dr. Tom Daniels Brenton Hankins Rick Hanton Harsh Goel Jeff Kramer.
1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.
Correlator GUI Sonja Vrcic Socorro, April 3, 2006.
Theme 2 AO for Extremely Large Telescopes Center for Adaptive Optics.
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
Theme 2 AO for Extremely Large Telescopes
NGS AO Control Light from Telescope Telescope pointing offload
LGS Project Meeting December 21, 2006 Agenda SWIFT update - A. Bouchez
Presentation transcript:

LGS Project Meeting November 9, 2006

2 Outline 1.Project infrastructure 2.PALM-3000 update 3.LGS subsystem updates –Optical bench –LGS facility –AO software 4.CfAO retreat talks 5.LGS calendar

3 LGS project infrastructure COO Twiki site is running smoothly again: AO lab at Palomar has been been cleaned up, and outfitted with new cabinets and tools. Tool cabinet will be locked. Optics and optomechanics will be available to all with a check-out system. AO lab at JPL has been similarly outfitted.

4 PALM-3000 update PALM-3000 kickoff meeting was held on Nov Rich and Mitch are leading the project. Primary activity this fiscal year is: –Requirements definition. –LOWFS development. –Wavefront processor development. –Re-layout of the AO relay for SWIFT (design only).

5 AO Bench Opto-mechanics The MGSU has been removed For the December run –Dichroic Realign after MGSU removal –LOWFS Mount and realign LOWFS to the bench rather than the MGSU Potentially change orientation to stay within the area of the bench and allow full range of motion Add focus/z adjustment –Acquisition Camera Mount and realign the field lens to the bench rather than the MGSU For January –Dichroic Separate reflecting spot and dichroic capabilities into 2 optics Use a motorized stage to switch between the two optics Optics will have adjustments for x and y tilt and translation –LOWFS Testing to determine the cause of the observed loss of light in the LOWFS path –Acquisition Camera Mounting acquisition optics on a single plate for ease of realignment Potentially obtain a new acquisition camera to increase the FOV –Requirement: Camera can be controlled via the current setup in the AO system

6 Laser characterization and power improvements Laser power during Oct. engineering run was W (down ~1 W after installation of the optical isolator). Renu has been researching clean room facilities and the laser optical design. Potential power improvements: –Replace 1.32 µm laser intracavity NLX (Renu: next few weeks). –Measure laser bandwidth and pulse length (Ed, Renu: Dec. 3-7). –Replace laser heads with Mach 3 design (Ed, Renu: Dec. 8-11). –Clean laser optics (Renu: Jan-Feb?).

7 Laser automation Thermal control of 6 optics (4 TEC and 2 heaters) has been implemented and tested. More channels may be needed. Micropulse phasing lock implemented in hardware and tested during October engineering run. New sodium cell components have been ordered, and will be assembled and tested next week (Renu, Chris: Nov ). LGS computer functionality is being defined: –Temperature control: enable/disable, display and log temps. –Frequency lock: enable/disable, scan, offload to etalon temp. –Power diagnostics: display and log 8 avg. power at ~10 Hz. –Video diagnostics: log 6 channels at ~1 Hz, display 4 at 30 Hz. –Program delay generator. –Provide operator GUI (display data from database)

8 Laser diagnostics and LLT Coude and Prime Focus diagnostics benches have been installed, with preliminary tests during Oct. engineering run. Goal is to finalize the diagnostics bench optical layouts, and camera and photodiode calibration by the December run. LLT modification plans for December run include a new “flip-out” mount for the LLT lens, better alignment tools, and a modified mirror cover (Hal). We decided against testing full LLT+PF bench in the Coude lab. Instead, PF bench will be tested alone (Anna, Antonin, Renu: Nov.).

9 Laser safety systems Communication/privilege problem between ASCAM and interlock system has been solved. IRCAM detection threshold has been reduced to eliminate false positives. Both cameras are ready to go “live” (run via VNC) for the Dec. engineering run. Main task ahead: Develop a test plan for camera sensitivity verification (Cromer, Bouchez).

10 AO Software System Start-up –AO start-up problem (TT) –AO version switching (TT) AOCP (JA) –white light power save/restore (completed) –white light command bug –ASCII save/restore Wavefront Processing (HWFP/LWFP) (TNT/CS) –Add new centroiding capabilities to the LWFP –Modifications to use of centroid offsets Telemetry Subsystem (SG) –Add message IDs to "late message" warnings –BTO/aodr data recording "late message" error –Condense repeated "late message" of the same kind External Interface –BTO I/F TCS raw angle data to BTO (completed) Receive BTO status data –PHARO I/F Update I/F document for PHARO (SWIFT) take_image command/data (completed) reset_foi command Control –Display both NGS/LGS status –Display BTO status

11 AO User Interface Proposed Changes to the NGS GUI – December ‘06 –Adjusting the time to take a sky based on the framerate –Replacing slider in servo loop GUI with a text input box –GUI will show current values (servo loops, etc) –Method to load tables from the GUI –Default log rates set based on frame rate –GUI for choosing log rate and data types Proposed Additions and Changes for an LGS GUI – February ‘07 * This list is in process * –Separate mode/GUI from NGS –Additional buttons for new servo loops (UTT, LOWFS focus) –WFS camera settings (HOWFS and LOWFS) accessible from a single GUI panel –All servo loop parameters accessible from a single GUI panel –Additional status displays for LOWFS, LGS loops, BTO

12 CFAO Retreat Palomar Talks Friday –Antonin Bouchez, Laser Guidestar Results –Jenny Roberts, NGS Low Order Wavefront Sensor –Sidd Bikkannavar, Phase Retrieval Results at Palomar –Chris Shelton, Optimal Faint-Object AO Saturday –Gene Serabyn, ExAO and the Palomar well-corrected subaperture Other Projects –Kent Wallace, Calibration system testbed –Ian Crossfield, ExAO contrast on segmented telescopes Poster –Chris Shelton, Atmospheric Dispersion Correctors for Extreme AO

13 LGS Calendar

14 LGS Calendar

15 LGS Calendar