Estimating Site work. Major Components Erosion & Sediment Control Fencing Clearing and grubbing Excavation Backfill Grading Trucking.

Slides:



Advertisements
Similar presentations
Construction Damage & Prevention Construction damage is one of the greatest causes of tree death and decline in urban areas. Presented by: Courtney Blevins,
Advertisements

Using Large Landscape Maintenance Equipment. Next Generation Science/Common Core Standards Addressed! CCSS.ELA Literacy.RST.9‐10.1 Cite specific textual.
Loading and Hauling.
HYDROELECTRIC PROJECT
A section has been added regarding Stream Restoration Design Criteria: A. Designs for stream restoration try to mimic natural conditions present in stable.
NITROGEN & PHOSPHORUS REMOVAL FROM SHALLOW GROUNDWATER.
Ground-Supported Slabs • Exterior Flatwork
Earthwork Operations & Equipments
Horticulture CD Unit C 6-3: Nursery, Landscaping, and Gardening.
Lecture 4 Excavating and Lifting
Lecture 7 Loading and Hauling
Chapter 3 Measuring Excavation and Sitework
Measuring Sitework, Excavation, and Piling
Foundations and basements
Chp.12 Cont. – Examples to design Footings
Estimating the Cost for a Foundation and Footing.
Evolution of the Williston Basin Drilling Pad ;. Drilling Pad What affects a drilling pad Types of pads in North Dakota Advances in pad construction.
Rainwater Harvesting Methods. What do we need to do with water? Slow it, Spread it, Sink it!
Foundation Systems.
CONSTRUCTION BEST MANAGEMENT PRACTICES (BMPs) CONSTRUCTION GUIDE TO CLEANER WATER Information compliments of: WaterWorks! WaterWorks! Center for Environmental.
ESTIMATING EARTHWORK Prof Awad S. Hanna.
Foundations. Foundation supports weight of structure –Includes soil and rock under foundation –Building construction described by foundation type Slab.
MAINTENANCE PART 2. Inlet free of obstructions Inlet free of obstructions Adequate scour protection provided.
Foundation Fundamentals GSD 6204 Building Technology Harvard Graduate School of Design.
Estimating Ahmed Elyamany, PhD, AVS. EARTHWORK AND EXCAVATION bank  Earth that is to be excavated is called bank measure. loose  Earth that is to be.
Chapter 18 Foundations.
CONSTRUCTING A FIVE CABIN LATRINE
1 Class Exercise  Soil Stabilization  Sediment Controls  Verify the contractors calculations for the quantity of material need to stabilize a Disturbed.
EDMUND FINLEY TRISHA LOWE NICK MENCHEL ANNA SLEETER BOLIVIA BRIDGE: FINAL DESIGN.
Constructing Homes and Other Buildings
Intro to Concrete 18.0 & 19.0 Class notes.
Wes Marshall, P.E. University of Connecticut March 2007
Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.
Planning for Earthwork Construction
Horticulture CD Unit C 6-3: Nursery, Landscaping, and Gardening.
Road Construction Technology
Contents: 2-1E, 2-5E, 2-9P, 2-13P, 2-33P, 2-36P*
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
Highway Subgrade (1) Introduction
Weathering and Erosion
ESTIMATING EARTHWORK DR. Nabil Dmaidi.
نظام المحاضرات الالكترونينظام المحاضرات الالكتروني Construction Methods By Ruqaya ALZubaidi.
NITROGEN & PHOSPHORUS REMOVAL FROM GROUNDWATER LITTLE BOGUE, MS. CONSTRUCTED NOVEMBER 2009.
1 Common Issues on Site Re-certification Training For Level IA Fundamentals Certified Personnel Issued May 2009.
View of well and location from the northern slope. According to a company representative, the location size has not been reduced because the well still.
4/26/061 presents Project Crimson April 26, 2006 Sarah Grace Cade Harrelson Cochrane Jamison Libby Probst Justin Williams.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 5 ESTIMATING EARTHWORK.
Retaining Wall Construction Building A Block Retaining Wall Developed by: Dr. Teri Hamlin Georgia Department of Education.
COFFERDAMS.
Soil Erosion. Objective 1: Explain soil erosion.  What is soil erosion?  I. Soil erosion is the process by which soil is moved.  As soil is eroded,
Retaining Wall Construction Building A Timber Retaining Wall Developed by: Dr. Teri Hamlin Georgia Department of Education.
Riprap Installation Construction Inspection for Field Office Activities Will use Riprap Gradation and Riprap Subgrade Problems from Class Problem Section.
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
Leads Institute of Technology & Engineering
Foundation – jay Desai.
Substructure Groundworks - Hazards
In the Name of Allah The Most Beneficent & Merciful
Site Grading of Terrace
KENNESAW MOUNTAIN TRAIL CLUB WORKDAY DRAFT
CONSTRUCTION METHODS & TECHNOLOGY
Scheduling Project Assignment 3 Team A.
Schaefer Lake Lot Owners Association
Concrete A structural material made by combining cement, sand, aggregate, and water.
Hornaday Weekend Conservation Project
ESTIMATING EARTHWORK Prof Awad S. Hanna.
PWCS Fifth Edition DIVISION 1000 Edits
WASTE DISPOSAL No matter what processing is done, there will be some residue that needs to be disposed of safely Options for disposal Modern, engineered.
ESTIMATING EARTHWORK Prof Awad S. Hanna.
Steps To Prepare Site For Site Work Construction Calhoun GA.
Presentation transcript:

Estimating Site work

Major Components Erosion & Sediment Control Fencing Clearing and grubbing Excavation Backfill Grading Trucking

Erosion & Sediment Control Silt fencing – Around site perimeter on downhill side – Must be dug into ground 6 inches Stabilized Construction Entrance – 2” - 3” clean stone w/ fabric below Sediment traps/basins – 3” – 6” clean stone – Check dams

Fencing Does site need to be enclosed? – What are hazards? – Risk of theft – Type of fencing

Clearing and grubbing Must clear site – Clearing is cutting down trees Tree size Clearing method – chips, saw trees – Grubbing is removing stumps Method – dozer, excavator Where do stumps and tops go?

Excavation Need to know soil type and excavation type – Soil type will affect productivity – Excavation type will determine equipment Dozer Scraper Excavator Shovel – Trenches may require 2 -3 pieces of equipment Excavate, place material, backfill

Backfill Compaction – Type of equipment required Fill required – Gravel – Native material – Top soil

Grading Rough grading Final grading Stabilization – Seed and mulch – Rip rap banks – Grass mats

Trucking – How much soil needs to be removed from the site or moved to another location on site Does it need to be trucked? How far – what is round trip distance? On road or off road?

Excavation Quantities – Need to find volume of soil to be cut, filled Average end area – By contour – By cross section – What does fill material need to be? – Trucks required Based on size round trip Want to keep excavators busy

Math Question: A Backhoe weighing 8 tons is on top of a flatbed trailer and heading east on Interstate 70 near Hays, Kansas. The extended shovel arm is made of hardened refined steel and the approaching overpass is made of commercial-grade concrete, reinforced with 1 1/2 inch steel rebar spaced at 6 inch intervals in a criss-cross pattern layered at 1 foot vertical spacing. Solve: When the shovel arm hits the overpass, how fast do you have to be going to slice the bridge in half?? (Assume no effect for headwind and no braking by the driver...) Extra Credit: Solve for the time and distance required for the entire rig to come to a complete stop after hitting the overpass at the speed calculated above? Yes, you can neglect friction.