Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.

Slides:



Advertisements
Similar presentations
Unit 4 - I Said Stop!. Introduction New Topics Timing Parallelism Sequence of Operations New Features NXT terminals New Functions Wait For.
Advertisements

Using the Arduino to Make an LED Flash Work in teams of two! living with the lab digital I/O pins (I/O = input / output) USB cable plug power pins.
1 Electrical and Computer Engineering Cam Proctor Ramsey Khudairi Tom Gilbert Chad Young Project Orion TekBand.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Molly, Gwyn, Sam, and Eric.  Sam will have soldered all parts onto our PCB so that we can test it at the meeting  Eric finished MUX code in PIC C and.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
I-heliostat 6/30 update Amy Whitcombe, Kendall Pletcher, Eric Kolker, Kiefer Hicks.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
I-heliostat 6/15 update Amy Whitcombe, Kendall Pletcher, Eric Kolker, Kiefer Hicks.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Raphael Finished and ordered the MCA PCB!. Dan Working on the UV PCB Determined an appropriate resistor value Read over Chen’s python code Estimated wavelength:
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
I-heliostat 6/16 update Amy Whitcombe, Kendall Pletcher, Eric Kolker, Kiefer Hicks.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Molly, Gwyn, Sam, and Eric.  We ordered everything we need to make a first prototype (1 or 2 extras of all components)  Spent $775 on Digikey (includes.
I-heliostat 6/23 update Amy Whitcombe, Kendall Pletcher, Eric Kolker, Kiefer Hicks.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
I-heliostat 6/18 update Amy Whitcombe, Kendall Pletcher, Eric Kolker, Kiefer Hicks.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
I-heliostat 6/21 update Amy Whitcombe, Kendall Pletcher, Eric Kolker, Kiefer Hicks.
Molly, Gwyn, Sam, and Eric.  Tested and analyzed enough of our system to make sure that it will work  Finished thermal testing of one of our converters.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Interface 1: Knobs GUI: link the buttons/knobs to “an action”; prompt MCA.py USB Client: do bit-masking and packet formation; send data as a control transfer.
Molly, Gwyn, Sam, and Eric.  We’ll need 2 PCBs  The main board will have all the converters, current and temperature monitors, and MUXs  The second.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
I-heliostat 6/29 update Amy Whitcombe, Kendall Pletcher, Eric Kolker, Kiefer Hicks.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
I-heliostat 6/17 update Amy Whitcombe, Kendall Pletcher, Eric Kolker, Kiefer Hicks.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Molly, Gwyn, Sam, and Eric.  We had assumed that components should have a rated current no more than mA above the requirement.  Fred says that.
I-heliostat 6/25 update Amy Whitcombe, Kendall Pletcher, Eric Kolker, Kiefer Hicks.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
I-heliostat 6/28 update Amy Whitcombe, Kendall Pletcher, Eric Kolker, Kiefer Hicks.
Molly, Gwyn, Sam, and Eric.  Configure DACs to have their digital input set to zero (2.5V) when they receive power  Ramp up to higher voltage at a “user.
I-heliostat 6/14 update Amy Whitcombe, Kendall Pletcher, Eric Kolker, Kiefer Hicks.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Completed TasksTasks in Progress Raphael Build peak-and-hold circuit on PCB Configure external ADC and interface w/ PIC Dan Write PIC code for constant.
1 Arduino Board: Arduino UNO Arduino Programing Environment: Arduino 0022
Wireless Telemetry System for Solar Vehicle
RGB LED Cube Team 15: C an’t U ndo B ad E lectrons Luke Ausley BSEE Joshua Moyerman BSPE Andrew Smith BSPE Sponsored by Stellascapes.
Arduino Uno Team 9: Adam Desouky & Keith Kaiser. Arduino Hardware Digital Pins Analog Pins Power Connect to Computer.
Subsystem Design Review P16203 Andre Pelletreau, Kerry Oliviera, Jeremy Willman, Vincent Stowbunenko, Kai Maslanka.

Arduino libraries Datatekniker Udvidet hardware/software.
Files in Python The Basics. Why use Files? Very small amounts of data – just hardcode them into the program A few pieces of data – ask the user to input.
Programming in Arduino Materials:Arduino Board Casperelectronics Pre Pres. Notes Photos from workshop?
A LECTURE ON Arduino Interface With LabVIEW (Used Boards: Arduino UNO & Arduino MEGA 2560) By Satish Kumar Rai Assistant Professor Department of ECE BKBIET,
Arduino + Bluetooth TYWu. Connection Arduino + Bluetooth Module.
:Blink Blink: Er. Sahil Khanna
ME 120: Arduino Programming Arduino Programming Part 1 ME 120 Mechanical and Materials Engineering Portland State University
全面推开营业税改征 增值税试点政策培训. 什么是营改增? “营改增”中的“营”指的是营业税,“ 增”指的是增值税。对大多数企业来说,增 值税所带来的税负远低于营业税。 减税本身就是积极的财政政策。营改增所 实现的减税,不仅规模大、范围广,它本质 上是一种“结构性减税”,从而构成“结构 性改革”攻坚战中的实招。
[LAB 2] Cloud9 IDE  Cloud9 IDE introduction  Example and Exercise.
Test 2 Review Outline.
ICT meeting Business needs
Computer Science I CSC 135.
using the Arduino to make LEDs flash
Using AMOS With SPSS Files.
HOW TO CREATE A CLASS Steps:
Use USB_DAQ to Complete the Calibration of PGA309 EVM
funCTIONs and Data Import/Export
The trace of a reaction path calculated in React can be overlain on Act2 or Tact diagrams.
Let’s use a PUSH-Button!
CTY SAR FCPS Vedant mathur, Juliana schalkwyk
Presentation transcript:

Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe

Progress  PIC code for LED: Right now, we can set LED voltages to loop through; output starts/stops when specified; delays a user-specified amount of time Time resolution improved from 3 ms to 25 us Need to improve storage – Keith wants around 250 data points, we have 50 now  Tested 2 PICs with USB connection  PCB outline  GUI progress: ASCII file running, saving HK to file in format specified by Keith, all HK information = set up Started constant updating

Next steps  Test GUI with PIC together  Order PCB  Get MCA GUI working  testing