1-Dec-06 HEPAP Univ. Subpanel Global Design Effort 1 ILC Report Barry Barish Caltech / GDE 1-Dec-06 RDR Design Freeze.

Slides:



Advertisements
Similar presentations
10-Nov-06 GDE Valencia Global Design Effort 1 Road to Beijing and Beyond Barry Barish Caltech / GDE 10-Nov-06.
Advertisements

Discussion on EUROTeV and ILC Nick Walker (DESY) EUROTeV Kick-off Meeting DESY 1 November 2004.
6-Nov-06 FALC Resource Board Global Design Effort 1 Report from the GDE Barry Barish Caltech / GDE 6-Nov-06.
20-Nov-06 FALC - KEK Global Design Effort 1 GDE Report Barry Barish Caltech / GDE 20-Nov-06 RDR Design Freeze.
Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.
BDS GDE context LC-ABD2 : WP4 - Beam Line Design 12 th April 2007, LC-ABD Plenary, RHUL Deepa Angal-Kalinin ASTeC, The Cockcroft Institute.
13-Feb-06 RDR: Goals and Scope Barry Barish Fermilab RDR Meeting 13-Feb-06 ILC Design/Cost WBS.
8-Nov-06 GDE Valencia Global Design Effort 1 MDI Related Potential Design Changes Barry Barish Caltech / GDE 8-Nov-06.
11-Nov-06 ILCSC - Valencia Global Design Effort 1 GDE Report and Discussion of Costs Barry Barish Caltech / GDE 6-Nov-06.
6-7 April 06 MAC Review Global Design Effort 1 RDR Overview Organization, Schedule, Approach and Goals Barry Barish GDE Caltech.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
5 May 06 SLAC SPC 1 ILC Global Activities GDE, FALC Barry Barish GDE Caltech.
14-Dec-06 RDR Internal Cost Review Global Design Effort 1 GDE Internal Review ILC Reference Design Costing Barry Barish Caltech / GDE 14-Dec-06.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
The RDR Report Odyssey Nan Phinney SLAC for N^3 team of editors.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
Towards an International Linear Collider Barry Barish GDE 6-June-07.
Global Design Effort U.S. ILC Cost Translation R. Stanek, et al. Vic Kuchler 1/26/07.
6-7 April 06 MAC Review Global Design Effort 1 BCD Overview Process and Highlights Barry Barish GDE Caltech.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
Global Group 4 – Conventional Facilities and Siting V. Kuchler1 of 17 Fermilab R&D Meeting Fermilab R&D Meeting Vic Kuchler Conventional Facilities.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
27-March-10 LCWS10 - Beijing Global Design Effort 1 Barry Barish LCWS10 - Beijing 27-March-10 “Cost Containment” for the TDR.
Global Design Effort ILC: From RDR to EDR or “How to Spend the Money” Nick Walker GDE.
8 May 06 ILCSC Report Global Design Effort 1 GDE R&D Program RDR Status and Plans Barry Barish GDE Caltech.
November 17, st XFEL / ILC Meeting 1 ILC GLOBAL Design Effort The Current ILC Twin Tunnel Design Wilhelm Bialowons and Nicholas Walker · MPY.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
Date Event Global Design Effort 1 ILC Engineering Design Phase - Status & Plans Mike Harrison GDE/BNL.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
DESY_ILCW07 Global Design Effort-CF&S 1 Beam Delivery System & Interaction Region Fred Asiri CF&S Point of Contact.
6-10 Nov. 06 ILCWS Valencia Global Design Effort 1 RDR Management Board Overview K. Yokoya KEK.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
04-Feb-07 GDE/ACFA Intro Beijing Global Design Effort 1 GDE Status Barry Barish 4-Feb-07.
CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation.
Introduction and Charge Barry Barish GDE Meeting Frascati 7-Dec-05.
22 September 2006 Global Design Effort 1 The Global R&D Board Status Bill Willis GDE Columbia University.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
Introduction to the seminar ILC Detectors: Status and Prospects Akiya Miyamoto KEK IPNS 18 July
Global Design Effort September 20-22, 2006 MAC Review R&D Programme (Tools) Eckhard Elsen GDE DESY.
Tor Raubenheimer KEK Mtg Goals KEK January 19 th, 2006.
Goals of the ILC-Asia Meeting at Pohang Fumihiko Takasaki PAL, Feb. 17, 2006.
M. Ross, N. Walker, A. Yamamoto th ATF2 Project Meeting Accelerator Design and Integration – New Baseline Proposal for ILC – ‘Strawman Baseline.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
1 May 06 LCFOA - SLAC Global Design Effort 1 ILC Global Design Effort Barry Barish GDE Caltech.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
1 of 5 CONVENTIONAL FACILITIES & SITING GROUP PROGRESS OVERVIEW J.L. Baldy, A. Enomoto, V. Kuchler V. KUCHLER GDE Executive Committee Meeting
Global Design Effort1 September 20-22, 2006 MAC Review Response to 1 st MAC Mtg Barry Barish GDE.
Summary: Site Discussion Jonathan Dorfan SLAC Plenary Session, June 6, 2008.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update December.
January 9, 2006 Margaret Votava 1 ILC – NI/FNAL/ANL Brief overview of Global Design Effort (GDE) plans, dates, and organization: –Changes since Industrial.
TLCC Themes BAW-2, SLAC, 19 January 2011 Ross Walker Yamamoto 1.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
Status of GDE BDS Design Talk based on several talks presented by BDS area leaders Andrei Seryi, Hitoshi Yamamoto, Deepa Angal-Kalinin at and after Vancouver.
19Jul06 Vancouver GDE meeting 1 S2 Task Force Status (String test definition) Tom Himel.
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
Oct 22 Group Leaders Planning meeting
LCWS11 AWG9 PARALLEL SESSION SUMMARY
Technical Design Report preparation
ILC Global Design Effort
Presentation transcript:

1-Dec-06 HEPAP Univ. Subpanel Global Design Effort 1 ILC Report Barry Barish Caltech / GDE 1-Dec-06 RDR Design Freeze

1-Dec-06 HEPAP Univ. Subpanel Global Design Effort 2 Progress toward RDR

1-Dec-06 HEPAP Univ. Subpanel Global Design Effort 3 Baseline to a RDR Jan JulyDec 2006 Freeze Configuration Organize for RDR Bangalore Review Design/Cost Methodology Review Initial Design / Cost Review Final Design / Cost RDR Document Design and CostingPreliminary RDR Released FrascatiVancouverValencia

1-Dec-06 HEPAP Univ. Subpanel Global Design Effort 4 Vancouver Cost Data

1-Dec-06 HEPAP Univ. Subpanel Global Design Effort 5 Costs by Area System

1-Dec-06 HEPAP Univ. Subpanel Global Design Effort 6 Costs by Technical & Global System

1-Dec-06 HEPAP Univ. Subpanel Global Design Effort 7 Optimizing Cost to Performance RDR MBCCB 2  14mr IRs supported central injectorssupported Removal of service tunnelrejected conventional e+ sourcerejected RF unit modifications (24  26 cav/klys) supportedsubmitted reduced RF in DR (6  9mm  z ) supportedin prep DR race-track lattice (CFS)supportedin prep reduced static cryo overheadsupportedin prep removal linac RF overheadsupportedin prep single-stage bunch compressorrejected e- source: common pre-acceleratorsupportedin prep

1-Dec-06 HEPAP Univ. Subpanel Global Design Effort 8 Vancouver Costs for BDS Cost drivers –CF&S –Magnet system –Vacuum system –Installation –Dumps & Collimators Total Cost Additional costs for IR20 and IR2

1-Dec-06 HEPAP Univ. Subpanel Global Design Effort 9 2/20 mrad  14/14 mrad Motivation –Reduce costs 2 mrad beam line expensive, risky, especially extraction line Common collider hall –Advantages Improved radiation conditions in the extraction lines Better performance of downstream diagnostics Easier design and operation of extraction optics and magnets Reduced back scattering from extraction line elements –Disadvantages Impact on physics (appears minor at present). Simpler incoming beam optics R&D on small crossing angles will continue as alternative

1-Dec-06 HEPAP Univ. Subpanel Global Design Effort 10 On-surface Detector Assembly Vancouver WBS considered the underground halls sized at 32m (W) x 72m (L) each to allow underground assembly of the largest considered detector. Conventional Facilities Schedule gives detector hall is ready for detector assembly 5 yrs from project start –If so, cannot fit our goal of “7years until first beam” and “8years until physics run” Surface assembly allows to save years and allows to fit into this goal –The collider hall size may be smaller (~40-50%) in this case –A building on surface is needed, but savings may be still substantial Optimization needs to be done

1-Dec-06 HEPAP Univ. Subpanel Global Design Effort 11 CMS assembly approach Assembled on the surface in parallel with underground work Allows pre-commissioning before lowering Lowering using dedicated heavy lifting equipment Potential for big time saving Reduce size of underground hall required On-surface assembly

1-Dec-06 HEPAP Univ. Subpanel Global Design Effort 12 Cost details of new 14/14 baseline Updates from CF&S Magnets to be included Should we go to a single IR and push pull system and save 30% of BCD costs?

1-Dec-06 HEPAP Univ. Subpanel Global Design Effort 13 Push-Pull Evaluation Initiated by GDE & WWS at the end of September Detailed list of questions to be studied developed: Large group of accelerator and detector colleagues, from ILC and other projects, is participating in design and discussion of these question The task force of detector experts was formed to contribute to detailed evaluation of the whole set of technical issues

1-Dec-06 HEPAP Univ. Subpanel Global Design Effort 14 Cost Reductions Logged Our efforts at Valencia identified another 4.91%!

1-Dec-06 HEPAP Univ. Subpanel Global Design Effort 15 ILC Documents Several reports for different audiences Brochure – non-technical audiences, ready now “Quantum Universe” level booklet ~30 pages Executive Summary ~ 30 pages Physics motivation, accelerator and detectors RDR Report ~ 300 pages high level description of the accelerator DCR Report ~ 250 pages physics and detectors

1-Dec-06 HEPAP Univ. Subpanel Global Design Effort 16 RDR Report RDR is a high level description of the accelerator, CFS, sites and costs A snapshot of what we propose to build –not a history of R&D, design evolution, and alternatives Editors: –Nan Phinney (SLAC), Nobu Toge (KEK), Nick Walker (DESY) Original schedule was complete draft now, but has been pushed back because of cost iterations

1-Dec-06 HEPAP Univ. Subpanel Global Design Effort 17 Reviewing RDR & Costs

1-Dec-06 HEPAP Univ. Subpanel Global Design Effort 18 Plans until Beijing (Feb. '07) NovemberDecemberJanuaryFebruary Valencia Further cost consolidation CCR preparation & submission Cost & Design Freeze 30/11 Prepare for Full Cost Review SLAC Cost Review 14-16/12 MAC 10-12/01/07 Final cost corrections and documentation Agency cost briefings Beijing: RDR draft published RDR final editing RDR prepare 1 st drafts

1-Dec-06 HEPAP Univ. Subpanel Global Design Effort 19 Charge for MAC Review On Wednesday 10, Thursday 11 and Friday 12 (until noon) January 2007, there will be an ILC MAC meeting at the Cockcroft Institute, Daresbury, UK. The major item for the meeting is the ILC cost and overall design, with specific MAC tasks: –Review the soundness of the overall RDR concept, identify any areas of concern, note what R&D is still needed, and comment on whether the performance parameters can be met. –Review the cost methodology and identify any areas of concern. This will be the first occasion at which costs will be presented outside of the GDE.

1-Dec-06 HEPAP Univ. Subpanel Global Design Effort 20 What Happens after Beijing? Public Release of Draft RDR and Preliminary Costing at Beijing –Cost Reviews, etc –Finalize RDR by Summer 2007? Enter into Engineering Design Phase –Planning underway internally –Design will evolve through value engineering and R&D program –General Goal is to have Construction Proposal ready by 2010

1-Dec-06 HEPAP Univ. Subpanel Global Design Effort 21 Proposed RDR Review Process

1-Dec-06 HEPAP Univ. Subpanel Global Design Effort 22 Siting Aspects of RDR & Candidate Sites

1-Dec-06 HEPAP Univ. Subpanel Global Design Effort 23 Site Aspects of RDR Three Samples Sites –ILC Conventional Facilities Group: Jean-Luc Baldy (CERN), Vic Kuchler (Fermilab) and Atsushi Enomoto (KEK) + Support Group –Sample Site Analysis - Europe (CERN); Japan (?); US (Fermilab) also, TESLA for reference and Russia unsolicited –Conventional Facilities are expensive! Make narrow definition for “host costs” - goal ~ 25% of total.

1-Dec-06 HEPAP Univ. Subpanel Global Design Effort 24 Costs by Technical & Global System

1-Dec-06 HEPAP Univ. Subpanel Global Design Effort 25 Site Aspects of RDR Three Samples Sites –ILC Conventional Facilities Group: Jean-Luc Baldy (CERN), Vic Kuchler (Fermilab) and Atsushi Enomoto (KEK) + Support Group –Sample Site Analysis - Europe (CERN); Japan (?); US (Fermilab) also, TESLA for reference and Russia unsolicited –Conventional Facilities are expensive! Make narrow definition for “host costs” - goal ~ 25% of total. Costing Regional – Best estimates in “own” system of costing. They are close to equal, meaning the RDR siting chapter can concentrate on requirements, technical features, cost drivers, safety issues, other issues etc. Need “true” candidate sites within ~ 1-2 years for realistic engineering design. How do we solicit candidate sites

1-Dec-06 HEPAP Univ. Subpanel Global Design Effort 26 Coordinating Global R&D

1-Dec-06 HEPAP Univ. Subpanel Global Design Effort 27 The ‘S’ R&D Task Forces S0 High-Gradient Cavities S1 High-Gradient Cryomodule S2 Test Linac S3 Damping Ring S4 Beam Delivery S5…Sn To address priority R&D items, RDB has convened several ‘task forces’. S0-S3 will report on Friday AM GDE plenary

1-Dec-06 HEPAP Univ. Subpanel Global Design Effort 28 The ‘S’ R&D Task Forces Addresses current ‘poor’ yield for EP cavities Primary goal: establish parameters for routinely producing 35 MV/m EP’d cavities –required  80% yield S0 High-Gradient Cavities S1 High-Gradient Cryomodule S2 Test Linac S3 Damping Ring S4 Beam Delivery S5…Sn H. Hayano, T. Higo, L. Lilje, J. Mammosser, H. Padamsee, M. Ross, K. Saito

1-Dec-06 HEPAP Univ. Subpanel Global Design Effort 29 Summary Status of Costing –First costing available at Vancouver (July) –Cost to performance optimization Status & Plans for design modifications –Several proposals accepted and some rejected –Changes having physics impact (Valencia) –Complete RDR by Beijing Meetings Global planning for critical R&D beginning –Formation of ‘S’ task forces

1-Dec-06 HEPAP Univ. Subpanel Global Design Effort 30 Some Key Issues The RDR –The RDR is a snapshop of the concept and scope of the costs; NOT A MATURE DESIGN –It is an “optimized concept” for the physics scope (ILCSC parameters) without doing detailed engineering (value engineering) and future R&D (demonstrations and alternatives) –Engineering Design will be more cost effective, lower risk and maintain the physics scope. Next Phase – Expensive –Resources and Organization ??? –Involve University Community in Acc Design/ R&D –Detector R&D  Road map - collaborations/detectors