1 Activity Relationship Analysis 2 The Three As of Plant Layout 1. A ffinities (Relationships) 2. A reas 3. A djustment.

Slides:



Advertisements
Similar presentations
PRODUCTION FUNCTIONAL MANAGEMENT Creation of utilities by converting raw material to final product by various scientific methods and regulations Very important.
Advertisements

Planning Production Activity Preview Planning Manufacturing Facilities Quantitative Tools in Production Planning Production Planning and Control Flexible.
Employee Services – Space Requirements
Process Selection and Facility Layout
10-1 Chapter 10 Facilities Layout and Location McGraw-Hill/Irwin Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
Activity relationship analysis
Hierarchy of Facility Planning
1 Site Selection & Area Allocation. 2 Maximizing Existing Facilities Consider the Following Areas for Cube Utilization: Under the floor. Basements are.
Process Layout Chapter 8 L L M M D D D D L L M M L L M M G G L L G G A
1 Facility Layout. 2 What Is Layout Planning Layout planning is determining the best physical arrangement of resources within a facility Two broad categories.
Operations Management
Diagram Activities.
1 Facility Layout Design using Block Diagramming Prepared by: Ryan Allen Brigham Young University March 27, 2006.
WINTER 2012IE 368. FACILITY DESIGN AND OPERATIONS MANAGEMENT 1 IE 368: FACILITY DESIGN AND OPERATIONS MANAGEMENT Lecture Notes #5 Introduction to Facilities.
Chapter 4 Office Layout.
Facility Design-Week 3 Traditional Approach for Facility Layout: Systematics Layout Planning Anastasia L.M.
Unit 4 Manufacturing Facilities Design and Analysis: Employee Office Layout and Auxiliary Services.
Traditional Approaches to Facility Layout
Chapter 10 – Facility Layout
Activity Relationship Analysis
Facility Layout Part a.
Office Layout Techniques and Space Requirements
LAYOUT TYPES PRODUCT PROCESS CELLULAR (Group Technology) MIXED ADEBCFADEBCF LAYOUT BY FIXED POSITION - Ship building - Special Structures.
Facilities Layout and Location The three most important criteria in locating a factory: Location! Location! Location!
Introduction Basic Concepts and Definitions
Chapter 10 – Facility Layout
Facility Layout Planning and Design
Facility Layout Chapter 10 pages , ,
Chapter 16 Selling the Layout. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Develop an appropriate.
10/13/2015 IENG 471 Facilities Planning 1 IENG Lecture 06 Flow: Quantitatively and Qualitatively Measured.
FACILITY LAYOUT PROBLEM
Ch. 20: Operation systems Learning Objectives Distinguish among various types of production and manufacturing processes. Describe product innovation.
Chapter 13 Area Allocation. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand the concept.
© Wiley 2007 Chapter 10 Facility Layout. © Wiley 2007 OUTLINE What Is Layout Planning? Types of Layouts Designing Process Layouts Special Cases of Process.
Designing Process Layouts Step 1: Gather information: –Space needed, space available, importance of proximity between various units Step 2: Develop alternative.
Facility Layout Chapter 10 pages ,
Technical Analysis. Technical analysis of a project idea includes an in depth study of all technical aspects related to Technical analysis of a project.
Module on Layout & Facilities Planning. 2 Operations Management: Layout & Facilities Planning In this module we will discuss: Layout types Employee &
1 Slides used in class may be different from slides in student pack Technical Note 6 Facility Layout  Facility Layout and Basic Formats  Process Layout.
Mba Facility Layout u Basic layouts u Some layout techniques u Assembly line balancing u Service Layout.
© The McGraw-Hill Companies, Inc., Technical Note 5 Facility Layout.
FOOD ENGINEERING DESIGN AND ECONOMICS
Traditional Approaches to Facility Layout
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Capacity & Facilities Operations Management Chapter 7 Roberta.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
© The McGraw-Hill Companies, Inc., Technical Note 5 Facility Layout.
ISE Operations Analysis Operations Analysis Location analysis Pareto Analysis Process Analysis Subjective Evaluation.
Chap 4 - Facility Layout: Manufacturing and Services.
Facility Layout 2 Basic Data and Layout Evaluation.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 6 Process Selection and Facilities Layout.
The main function of a business is to produce goods and services which are desired by their customers.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
Facility Design Issues. Back to the course objectives... Forecasting Strategic Planning Aggregate Production Planning Disaggregation Production Scheduling.
Facility Layout Objectives of Facility Layout Basic Types
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 8 Facility Layout.
Charting and Diagramming
LAYOUT Prepared By : Res.Asst.Hanife Demiralp. BLOCKPLAN In this lab, we are going to generate facility layout by using Block plan and POM-QM soft wares.
FACILITY LAYOUT & LOCATION PROF. DR. ORHAN TORKUL M. RAŞİT CESUR.
Definition: The physical positioning of processes, departments, equipment and work areas to optimize an organization’s effectiveness in achieving its operating.
Facility Layout Chapter 10 pages , ,
MSME  Micro small and medium enterprises
Auxiliary Services Requirement Space
Site Selection & Area Allocation
Process Layout Chapter #6.
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Cellular Layouts Cellular Production Group Technology
LOGISTICS NETWORK.
Manufacturing Facilities Design and Analysis:
GIS Day Site Layout Optimization Using GIS Sulyn Gomez Mohd Samrah
Facilities Planning and Design Course code:
Presentation transcript:

1 Activity Relationship Analysis

2 The Three As of Plant Layout 1. A ffinities (Relationships) 2. A reas 3. A djustment

3 Establishing Relationships A relationship diagram that provides a visual means to determine the intensity of flow between processed based activities.

4 Between Activities Establishing Relationships- Between Activities The fewer the lines between activities, the lower the “intensity”

5 Based on Material Flow Establishing Relationships- Based on Material Flow A method to quantity what is moving within the plant Graphically establish existing flowpaths between activities Optimize the material flowpaths Optimizing distances between activities should be based on materials handling cost

6 Activity Relationship Analysis 1. The activity relationship diagram 2. The worksheet 3. The dimensionless block diagram 4. The flow analysis

7 Activity Relationship Analysis Activity Relationship diagram shows the relationship of every department, office, or service area with every other department and area. In order to establish this relationship, we use closeness codes to “weight” the decision.

8 Closeness Codes CodeDefinition A A bsolutely required proximity E E specially important I I mportant O O rdinary importance U U nimportant XCloseness undesirable

9 Closeness Codes “A” Codes Between Departments: Restricted to massive materials movements Used for great movements of people Limit it to no more than eight (8) with one department Example- raw steel storeroom to the shearing department

10 Closeness Codes “E” Codes Between Departments: Used if there is any doubt that it is an “A” Much material or people movement, but not all at one time Example- restrooms, or break rooms

11 Closeness Codes “I” & “O” Codes Between Departments: Used when some level of importance is desired Some consultants omit these codes, however, use them on the first few layout designs

12 Closeness Codes “U” Codes Between Departments: Useful because they tell us that no activity or interface is needed Indicates that these departments can be placed far away from each other

13 Closeness Codes “X” Codes Between Departments: As important as “A” codes The opposite of “A” codes Indicates less than desired closeness Example- Welding next to flammables, or paint areas near grinding operations

Relationship Chart X Departments Activities Etc. Basic Information Painting5,769 Sq.Ft. Milling 3,898 Sq. Ft. A Relationship between painting and milling Relationship Rating XReasoning 1 & 4 1. Dust 2. Noise 3. Fumes 4. Vibration X Keys OR &

Relationship Chart Dept 1 Dept A Dept B Dept C Dept D Dept E Dept F Dept 8 X X Relationship between departments A and F Relationship A - absolutely necessary E - very important I - important O - ordinary importance U - unimportant X - undesirable A X U U I E O I E O IU I U The relationship chart is a subjective approach to defining a quantifiable relationship between departments. Cod e Percenta ge “A” “E” “I” “O” 5% 10% 15% 25%

16 Relationship Chart The total number of relationships, N, between all possible pairs of work centers in any facility can be determined as: Where n = number of departments or work centers in the facility. For example, for a facility with 25 different departments or work centers: N= n(n – 1) 2 N= 25(25 – 1) 2 = 300 total codes Facility planners rule of thumb states that you should have no more than 15 “A” codes (300 x 5% = 15). Similarly, it is reasonable to expect that the number of “E” and “I” codes should not exceed 30 and 45, respectively.

17 Activity Relationship Factors Do they share common utilities? Are they part of a common process? Does one department supply the other? What are the management and personnel common between the departments? Is the process in one department harmful to the other? Other...

18 Nonflow Factors Usually collected through interviews with the operators, management, etc. These areas include: Maintenance Tool storage Lunchroom Restrooms Offices Use the same charting/weighting concept

19 Activity Relationship Analysis 1. The activity relationship diagram 2. The worksheet 3. The dimensionless block diagram 4. The flow analysis

20 Activity Relationship Worksheet The worksheet is an interim step between the activity relationship diagram and the dimensionless block diagram. The worksheet will replace the activity relationship diagram. The worksheet interprets the activity relationship diagram and becomes the basic data for the dimensionless block diagram.

21 Activity Relationship Worksheet All activities... Relationship Codes continues

22 Activity Relationship Analysis 1. The activity relationship diagram 2. The worksheet 3. The dimensionless block diagram 4. The flow analysis