CMS Tracker Week – Module Test Meeting – July 2003 – Patrick Gartung 1 Long term rod testing software Patrick Gartung University of California, Riverside.

Slides:



Advertisements
Similar presentations
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Advertisements

CMS Week March presented by John Coughlan RAL FED Hardware Status Pre-Series Manufacture Final Production Plans.
Sezione di Bari September 16, 2002D. Elia - DCS workshop / ALICE week 1 SPD PS system and Controls Domenico Elia, INFN-Bari.
TEC X5 Setup (1) 1 Front + 1 Back petal, fully equipped (28 modules F.P modules B.P. + AOH + DOHM) Petal assembly IPN-Lyon (F.P.), RWTH-Aachen I.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
HV-LV DCS Workshop – 16/03/2004 G. De Cataldo, A. Franco, A.Tauro - INFN Bari Progress report on the HMPID LV System Cabling and LV sectorsCabling and.
HV Report F.Cavallari (INFN Roma). High Voltage set-up in M0’ 2 channels each driving 50 crystals (100 APDs) 1 Crate hosting 1 board (final system). 1.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
Status of UCSB LT Testing All 10 slots are equipped with UTRI, PAACB and adapter boards. All 10 UTRI connected to multiplexer. All 10 slots have HV connections.
Juan Valls 1 TOB System Test Status Report  DS ROD System Test Setup  DAQ Software  DS ROD Characterization PLL, FED Timing Scans OPTO Scans  Noise.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
Slide 1UCSB Rod Production presented by Jim LambDOE review, January 20, 2004 UCSB Rod Production UCSB Rod Production, Jan , presented by Jim Lamb.
Slide 1Rod Production presented by Jim Lamb (UCSB)April 9, 2004 Rod Production Rod Production, April , presented by Jim Lamb (UCSB)
US CMS Silicon Electronics Testing – CMS Lehman Review - May 21, Affolder1 US CMS Silicon Electronics Testing US CMS Lehman Review BNL 5/21/03 A.
CMS Tracker Week – Module Test Meeting – April 2003 – Patrick Gartung 1 Status of US long term module testing Patrick Gartung University of California,
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 17 June Sam Burke UCSB HEP Group.
CMS Tracker Week – L3 Meeting – April 2003 – Patrick Gartung 1 UC Riverside Testing Facilities Patrick Gartung University of California, Riverside.
Giovanni Polese 1 HV cabling multiconductor connettorization (600 ch) : pretest and fixing: 1 month * 2 people connectorization: 2 months * 2 people HV.
8/11/2006 FPIX TB meeting L. Perera 1 Pixel Power Supply Response Measurement Lalith Perera - Univ. of Iowa Carlos Florez, Simon Kwan, Charles Newsom,
DAQ Status. F.S. Cafagna, Coll. Meeting 16 March Hardware  In 555, one equipped crate for VME readout  top crate  9U crate  Power Supply 
John Coughlan CMS Week Mar FED Update FED Production Status Transition Card.
RPC STATUS AT PANJAB UNIVERSITY Panjab University, Chandigarh India-CMS Meeting, 28 th July, 2011.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
S. Zelepoukine CMS Electronics Status Report: ECAL Detector Control System S. Zelepoukine IHEP Protvino/ETHZ
The LST High Voltage System LST Readiness Review May 5, 2004 Klaus Honscheid Ohio State University.
John Coughlan Tracker Week Feb FED Status FED Production Status Transition Card.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
Technical Board Meeting, 14/06/07 Kristján Gulbrandsen, NBI 1 Progress on and Status of the Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr.
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002.
All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule.
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Power supplies dismounted Shipped to Orsay this week Refurbishment work to start.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
G. Dissertori ETHZ CMS Electronics ECAL DCS : Plans for 2003 G. Dissertori ETHZ
G. Dissertori ETHZ CMS Electronics ECAL DCS Software Planning G. Dissertori ETHZ
RPC Electronics Link system RPC Annual Review, CERN, June 13, 2006 Maciek Kudla for Lappeenranta and Warsaw University.
Juan Valls - LECC03 Amsterdam 1 Recent System Test Results from the CMS TOB Detector  Introduction  ROD System Test Setup  ROD Electrical and Optical.
Cables Ian Crotty 8 May 2012 Cables for the RE4 Upscope in CMS News. The HV cables are in the Integration DB (INB/904) The Hv order is confirmed. Need.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
Electronics Status New DCM daughter card works. –Three cards has been assembled. –One daughter card has been send to Jamie yesterday by FedEx overnight.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
Stefano Bianco for the Frascati and Napoli groups June 29, 2012 In collaboration with Richard Fortin - PH-DT-DI CERN AIDA ENVIRONMENTAL SENSORS STATUS.
FPix DCS Subgroup Report
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
LKr status R. Fantechi.
DAQ for ATLAS SCT macro-assembly
Electrical and electronic systems projects
System Tests at Lyon From Aachen: ICB for front petal side A, disks 4-6, rings 4 and 6 From CERN: CCU25 Tests (M. Ageron): FEC ring and I2C addressing.
ROD assembly and test in US
On behalf of the US TOB testing group
UCSB Testing Status Anthony Affolder
UCSB Testing Status Anthony Affolder
Pierluigi Paolucci - I.N.F.N. Naples
Hardware Needs (Near Term)
On behalf of the US TOB testing group
RPC Detector Control System
First Assembled Rod in US
RPC Detector Control System
US Module Testing Progress Report
Operations/Failure Analysis
Operations/Failure Analysis
RPC Detector Control System
US Module Testing Progress Report
Operations/Failure Analysis
US Rod Burn-in Readiness DAQ Hardware/Power Supplies
RPC Detector Control System
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
Prepared for CSC by Fred Borcherding FNAL
Presentation transcript:

CMS Tracker Week – Module Test Meeting – July 2003 – Patrick Gartung 1 Long term rod testing software Patrick Gartung University of California, Riverside

CMS Tracker Week – Module Test Meeting – July 2003 – Patrick Gartung 2 Current Software Status Installing CERN Redhat v7.2 and Daq_CMS_Like software on rod assembly test stand computer 2 graduate students assisting Control of CAEN SY127 HV crate with A1303 Integrated with Daq_CMS_Like software Temperature control of Rochester “freezer” and software interlocks being developed using Labview See Ricardo Eusebi’s talk

CMS Tracker Week – Module Test Meeting – July 2003 – Patrick Gartung 3 Current Software Use XROD for readout during rod assembly No multiplexer support To readout 1 SS4 rod (12 UTRI connections) need 2 FED (16 UTRI connections) To readout 1 DS4 rod (24 UTRI connections) need 3 FED (24 UTRI connections) Use Long Term Test for Rods Interface with Rochester “freezer” controls via TCP/IP Currently works with 1 FED and 1 FEC Only tested with 1 CCU -> 6 modules Cable length could be an issue with 2+ CCU on one FEC Limited to 80 UTRI connections with 1 FED+multiplexer 4x10 = 40 pairs or 2x10 = 20 triplets Readout 6 SS4 rods (6 rods x 6 mods x 1 pair = 36 pairs) Readout 3 DS4 rods (3 rods x 12 mods x 1 pair = 36 pairs) Readout 3 SS6 rods (3 rods x 6 mods x 1 triplet = 18 triplets)

CMS Tracker Week – Module Test Meeting – July 2003 – Patrick Gartung 4 Software Considerations Extend Long Term Test to multiple rods Add support for N FED with N multiplexers Gives Nx80 UTRI connections Extend XROD to multiple rods Add multiplexer support to readout multiple rods(?) Or add support for 4+ FED(?) Need separate temp and voltage control programs No unattended readout Use XDAQ? No experience using it

CMS Tracker Week – Module Test Meeting – July 2003 – Patrick Gartung 5 Conclusions Current software can support initial rate of rod assembly testing and long term testing Need to extend software to support full rate of rod long term testing