DM - COA Housing. DM - COA Housing with mirrors and alignment devices installed Alignment cubes Alignment devices Dummy chopper.

Slides:



Advertisements
Similar presentations
Sound Card Calibration. Determine computer audio device. Determine computer audio device. In XP, go to Control Panel – Sounds & Audio Devices – Audio.
Advertisements

PACS IIDR, Noordwijk 1-2 Mar 2001 Chopper R. Hofferbert D. Lemke, U. Grözinger, O. Krause, U. Klaas J. Katzer (ZEISS) Max-Planck-Institut für Astronomie,
PACS IHDR MPE, 12/13 Nov 2003 PACS ICC1 ICC - EGSE, PCSS, HCSS, IEGSE - Otto H. Bauer MPE Garching.
LWIR FPA Mirror Image Problem & Recovery April 11, 2011 Roy W. Esplin Dave McLain.
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Treater Oil & Water Valves
Dishwasher Rework. Identify Unit Disconnect Power Turn off Breaker… … or unplug power cord.
Cable Channel tests ____________________________________________________________ 17/Apr/07 Pisa Group Four configurations of insulation has been tested.
Test Cryostat, OGSE and MGSE PACS IHDR: MPE 12/13 Nov 2003 AIV1 PACS Test Cryostat, OGSE and MGSE Gerd Jakob MPE.
1. Common Optics Assembly (COA) Main optics housing riveted on channel housing (with rod) QM delivered
PALM-3000 P3K Team Meeting #16 Stephen Guiwits Dean Palmer, Ernest Croner, Antonin Bouchez Team Meeting # Cahill March 05, 2010.
Insert A tree starts with the dummy node D D 200 D 7 Insert D
PACS IBDR 27/28 Feb 2002 PACS FPU FPU R. Graue, D. Kampf Kayser-Threde.
W. Aalders FPU CDR 1-3 July 2003 HIFI 1 FPU CDR MCS HIFI MECHANISMS 1.Focal Plane Chopper (FPC) 2.Diplexer Rooftop Mirror Translator (DRT) 3.Pivot development.
Development of the IF2 Chain for the FPU of the HIFI Instrument Alexander Megej July 1 st, 2003, Groningen.
Scanning apparatus. Final tune ups Repeatability: move in a given steps and see if we can get the same amounts. Calibration: mainly to convert any given.
Integration and Test 14 October 2008 Martin Nordby.
Integration and Alignment of Optical Subsystem Roy W. Esplin Dave McLain.
Receiving Equipment.
PACS IHDR 12/13 Nov 2003 PACS FPU Mirrors and Black Paint R. Graue, D. Kampf Kayser-Threde.
PACS IHDR 12/13 Nov 2003 PACS FPU Optics: Concept and Alignment R. Graue, D. Kampf Kayser-Threde.
With Bluetooth Connectivity
Advisor: Peter Klomberg Client: Alex Converse, Ph.D.
E-MAS Cooled Optical Bench (COB) System Overview Nov. 15, 2010 Roy W. Esplin Mike Watson Dave McLain Monte Frandsen.
PACS IBDR 27/28 Feb 2002 PACS Photometer1 PACS PHOTOMETER J.L Auguères L.Rodriguez CEA/DSM/DAPNIA Service d’Astrophysique.
PACS IIDR 01/02 Mar 2001 Instrument Interfaces1 PACS FPU Opto-mechanical Design Overview and Interfaces J. Schubert MPE.
PACS IHDR 12/13 Nov 2003 PACS FPU FPU Structure, Baffle and Straylight R. Graue, D. Kampf Kayser-Threde.
Assembling and Disassembling a PC
Alignment (results by Jo van den Brand) Preparing IP 8 Velo arrived at IP 8 Preparing UXA C3 Installation transfer lines for the cooling system Next steps.
PACS IBDR, Garching 27/28 Feb 2002 Chopper R. Hofferbert D. Lemke, U. Grözinger, O. Krause J. Katzer (ZEISS) Max-Planck-Institut für Astronomie, Heidelberg.
Herschel Space ObservatoryPACS Science Verification ReviewMPE 22/23 June 2006 GJ / MPE 1 PACS Test Facility Capabilities – Cryogenics and OGSE Gerd Jakob.
M1M3 Status & Near Future Milestones C.Araujo/ J. Sebag 1.
PACS SVR 22/23 June 2006 PACS FPU Subunits1 FM FPU Subunits A. Poglitsch.
PACS IQR ESTEC 13 January 2005 Mech Qual Status 1 PACS IQR Mechanical Qualification Status and Plans for PFM Reinhard Katterloher R. Graue, D. Kampf, R.
Central Processing Unit (CPU)
PACS SVR 2 18 Jan 2007 FM ILT: Spectrometer1 Spectrometer Performance H. Feuchtgruber, T. Müller, A. Poglitsch.
Powers and roots. Square each number a) 7 b) 12 c) 20 d) 9 e) 40 a) 49 b) 144 c) 400 d) 81 e) 1600.
Activating The Modern Return Plant Presented By Michael E. McCracken Eastern Show ‘96 Presented By Michael E. McCracken Eastern Show ‘96.
PACS IHDR MPE, 12/13 Nov 2003 Overall Schedule1 Otto H. Bauer MPE Garching.
Online System Status LHCb Week Beat Jost / Cern 9 June 2015.
1 Using In-situ Cryogenic Radiometers to Measure the Performance of a Large Thermal Vacuum Chamber Michael DiPirro 1, Edgar Canavan 1, James Tuttle 1,
ITE1v4 Computer Assembly Module 3 JEOPARDY RouterModesWANEncapsulationWANServicesRouterBasics RouterModesWANEncapsulationWANServicesRouterBasics.
Page 1HMI/AIA Science Meeting – February 13, 2006 HMI Instrument Status HM/AIA Science Meeting February 13, 2006 Barbara Fischer HMI Deputy Program Manager.
Weighline Rail Scale Installation. Track prior to the scale installation.
PACS IBDR MPE 27/28 Feb 2002 AIV 1 PACS IBDR Test Cryostat and OGSE Gerd Jakob MPE.
PRESENTATION. Parts of the PCOS (3) Operator LCD Screen with Counter (4) Printer Compartment (5) Transmission Port (9) “RETURN” Button (8) “CAST” Button.
Tomelleri S.r.l. ® Copyright 2007 © ASTRONOMY AND RESEARCH July 23rd 2008 VST Meeting1.
Swish Sleeve Packaging Design Stephen MacNeil, Michael Kobit, Sriharsh Achukola, Augustus Hong.
PLUS Tutorial: How to build an fCal calibration phantom Author: Andras Lasso.
LBT Q Engineering Review Swing Arms (SWA). 10-Jul-2007LBT Q Engineering Review Highlights (Q2/2007) The right secondary arm is wired and the.
Learning to read Installing a wired modem router.
Status of Mechanical Design of LEBT Rich Andrews, Matt Alvarez, Tim Hamerla, Danny Snee.
HF “Slice test box” installation
MULTIPOINT ND THOMSON SCATTERING ON HT-7
HF “Slice test box” fabrication and installation
Open Issues Modification of Cactus Arm bending tool required
Solving Word Problems Using the CUBES method.
Phase Change – depends on heat energy
SLAC DOE Program Review
Pump House wall before installation.
68-76 Pocket Goniometer PGX
Chapter 17.
Status of Readout Boards
Not so easy it seems… Windmill Energy.
WP2 – Operational Context & Scenario
Chapter 9.
CHIC: Possibilities of Supply
Repairing the Electrical Components
Presentation transcript:

DM - COA Housing

DM - COA Housing with mirrors and alignment devices installed Alignment cubes Alignment devices Dummy chopper

DM - COA with diplexer box installed Diplexer box

Chopper DM - FPU final configuration Alignment cubes COA Alignment devices MSA 5 MSA 1 Thermal straps For “4” and “2 K” Calibration Source IF cabling IF2 Box

CQM- COA Housing

CQM- COA Housing with dummy mirrors and alignment devices Alignment devices Alignment cubes

CQM- COA with Diplexer box installed Diplexer box

CQM- FPU with diplexer box, IF2-box and straps Alignment devices Alignment cubes IF2 Box Diplexer box Thermal straps For “4” and “2 K”

CQM- FPU final configuration Mirrors IF2 Box Alignment devices Alignment cubes Calibration Source Chopper Thermal straps IF cabling 12 Dummy MSA’s 2 MSA’s (band 3)