Chairman: G. Patsiavos, Head of International Affairs Division, Greek Ministry of Transport and Communications Secretary: Ch. Taxiltaris, Professor AUTh.

Slides:



Advertisements
Similar presentations
WTO - TBT Committee Ana Maria Vallina, PhD Coordination Among Regulatory Bodies: The Chilean Experience Ana Maria Vallina PhD Head of Foreign Trade Department.
Advertisements

Regional Policy EUROPEAN COMMISSION 1 EGTC regulation EGTC regulation ESF and EGTC regulations Regulation of the European Parliament and of the Council.
European Commission Directorate-General for Energy and Transport n°126/6/2003 TEN Policy Development Introducing the draft MoU for the South East Europe.
LLM 2010/11 EU Environmental Law I The EU on the International Stage.
The governance of metadata management in the S-DWH
Challenging the Budget Creating Incentives for Results Rwandas Experience Elias Baingana - Budget Director.
MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS DG “PROGRAMMING OF THE REGIONAL DEVELOPMENT” OPERATIONAL PROGRAMME “REGIONAL DEVELOPMENT” EVALUATION.
TAMARA ĆAPETA JEAN MONNET CHAIR FACULTY OF LAW, UNIVERSITY OF ZAGREB 2014 The External Powers of the EU.
Arrangements regarding ECP 2014–2020 implementation 1.Implementation of the Republic of Slovenia Budget Act Specific section for the period:
EU: Bilateral Agreements of Member States
Regulatory Body MODIFIED Day 8 – Lecture 3.
“Framework for mainstreaming Ireland's experience" Siobhan Barron Director National Disability Authority Ireland.
1 Swiss-Slovak Cooperation Programme April SWISS-SLOVAK COOPERATION PROGRAMME  New possibilities of financial support for the 10 new member states.
DEVELOPMENT OF THE NATIONAL INVENTORY SYSTEM IN THE REPUBLIC OF BELARUS Belarus has signed UNFCCC in June, 1992 Ratified in May, 2000.
COST (European Cooperation in Science & Technology) An Introduction to the COST Grant System Dr. Mafalda Quintas (TD Science Officer) Ms. Andrea Tortajada.
December To share best practices from the experience of 100 NSDS implemented over the last years. To take into account international community.
CEBS in Brief. The Lamfalussy approach The Lamfalussy approach was first implemented in the securities field following the recommendations of the Committee.
Implementation Section Romania-Bulgaria Cross-Border Cooperation Operational Programme Joint Approval Committee, Bucharest, 3 April 2007.
International Multilateral Organizations Plan: 1. Features of international intergovernmental organizations 2. The objectives of the IMO 3. Functions of.
Market Design of SE Europe: Reflections from the 3rd Forum on the Way Forward 6 th Permanent High Level Group Meeting Athens, 07 December 2003.
Building Sustainable Inspection Reforms Jordan Coordination Model Wafa’a M. Aranki June 2014 Amman – Jordan.
INT 3131 INT 313: INTERNATIONAL ORGANIZATION Fall November 2002 The United Nations I: An Introduction.
| 1 Transeuropean Transport Network Alain Baron, European Commission, Directorate General for Mobility and Transport (DG MOVE) NDPTL : strengthening the.
Ministry of Enterprise, Energy and Communications Sweden Small Business Act – Think Small First in Sweden Håkan Hillefors Division for Entrepreneurship.
Institutional structures for Structural Funds assistance Ministry of Finance September 10, 2003.
Contracts FP6. PRESENTATION OUTLINE è Legal Framework è Participation è Contract Structure è Collective Approach l signature and entry into force l collective.
Acquis communautaire Community Acquis DEFINITION.
Mounir BENHAMMOU Director of Administrative and Financial Department Secretariat General of the Arab Maghreb Union EN/CSC2/2014/Pres/05.
Preparation of future ENI CBC programmes - State of Play Vanessa De Bruyn (DG DEVCO) 3 December 2012.
Eurostat ESTP course on International Trade in Goods Statistics April 2013 Point 2 of the agenda Legal framework for EU trade statistics.
Ratification There are two normative acts which regulate the ratification, accession, approval and acceptance of the international treaties in the Republic.
United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September.
1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS MANAGING AUTHORITY FOR COHESION FUND (REGULATION 1164/94) MANAGEMENT OF PROJECTS, FINANCED BY COHESION.
1 Performance elements in budget and reporting process - Norway 5TH ANNUAL MEETING OF OECD SENIOR BUDGET OFFICIALS NETWORK ON PERFORMANCE&RESULTS – 28.
The partnership principle and the European Code of Conduct on Partnership.
Mr Jonathan Scheele - Director for the Trans-European Network - Transport POLICY ON THE EXTENSION OF THE MAJOR TRANS-NATIONAL AXES Council Working Group.
1 Vienna Economic Forum –VEF- ERE AND THE REGULATORY FRAMEWORK FOR THE PRIVATISATION OF DSO Bujar Nepravishta Chairman of ERE Tirana-8 th and 9 th June.
Application procedure From theory to practice Dieter H. Henzler, Steinbeis-Transfercenter Cultural Resources Management, Berlin.
Experience of Accessing EU Financial Support in Lithuania 4th PG Funding Meeting , Paris.
The FAO and the EU; interaction between legal orders & how does FAO see the EU? Françoise D. Schild Permanent Representation.
MR THEMBA WAKASHE DIRECTOR-GENERAL DEPARTMENT OF ARTS AND CULTURE PRESENTATION OF THE DAC LEGISLATIVE PROGRAMME 2010 TO THE PORTFOLIO COMMITTEE OF ARTS.
1 World Bank Workshop - 14 March 2006 The disclosure of financial information according to the Transparency Directive by Mina Filippa Legal Advisor/ Rapporteur.
NEW SACU AGREEMENT. PROVISIONS OF 1969 AGREEMENT RETAINED Free trade in locally produced goods Free movement of goods once cleared by customs Common external.
Recent sucessful steps taken by Republic of Serbia in implementation of Balkans project Prepared by Jasmina Bogdanovic Workshop to Promote the Ratification.
DG ENV Environmental assessment procedures for energy infrastructure projects of common interest (PCIs)
WTO Structure Highest level: Ministerial Conference Second level: 1) General Council; 2) Dispute Settlement Body; 3) Trade Policy Review Body Third level:
Draft fiche on delegated act on the European code of conduct on partnership (ECCP) Structured Dialogue Brussels, 19 September
Lecturer: Lina Vladimirovna Zhornyak, associated professor.
Croatia: Result orientation within the process of preparation of programming documents V4+ Croatia and Slovenia Expert Level Conference Budapest,
LEGISLATIVE PROCESS IN BANGLADESH By Kazi Arifuzzaman, Deputy Secretary, Legislative and Parliamentary Affairs Division, Ministry of Law, Justice & Parliamentary.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 31 – Common Foreign and Security Policy.
African Centre for Statistics United Nations Economic Commission for Africa Session 2 How to meeting countries needs: What has been done and way forward.
TAIEX-REGIO Workshop on Applying the Partnership Principle in the European Structural and Investment Funds Bratislava, 20/05/2016 Involvement of Partners.
History of the European Union (EU) 1948 – Organization for European Economic Cooperation (OEEC) founded to administer U.S. Marshall Plan 1957 – Treaty.
Hallgrímur Snorrason Management seminar on global assessment Session 6: Institutional and legal framework of the national statistical system Yalta
Annex III to BS/SC/PDF/A(2003)1
EU-Russia Cooperation in the Areas of Science, Research and Innovation
WORKING PRINCIPLES ECONOMIC COOPERATION ORGANIZATION REGIONAL COORDINATION CENTRE FOR IMPLEMENTATION OF THE ECO/FAO REGIONAL PROGRAMME FOR FOOD SECURITY.
Business environment in the EU Prepared by Dr. Endre Domonkos (PhD)
Presentation by: Marios Miltiadou Greek Ministry of Transport
Setting up an ERIC 11 May 2012 Richard Derksen
The role of the ECCP (1) The involvement of all relevant stakeholders – public authorities, economic and social partners and civil society bodies – at.
SOCIAL DIALOGUE WITHIN EUPAN
Mandate for European affairs and international cooperation division
THE ETF – HELPING countries develop through learning
Hungarian Association of NGOs for Development and Humanitarian Aid
SOCIAL DIALOGUE WITHIN THE SCOPE OF EUPAN
Comitology and the Treaty of Lisbon
Hellenic Statistical Authority (ELSTAT)
Role of Evaluation coordination group and Capacity Building Projects in Lithuania Vilija Šemetienė Head of Economic Analysis and Evaluation Division.
Presentation transcript:

Chairman: G. Patsiavos, Head of International Affairs Division, Greek Ministry of Transport and Communications Secretary: Ch. Taxiltaris, Professor AUTh Extension of the major trans-European transport axes to the neighbouring countries REPUBLIC OF GREECE MINISTRY OF TRANSPORT AND COMMUNICATIONS INTERNATIONAL AFFAIRS DIVISION Workshop 4 “Strengthening of cooperation and monitoring”

Workshop 4: Diary 20 March 2007: Definition of Workshops by DG TREN 17 May 2007: Call for participation - Set of basis of work [HLG-2 report, DG TREN guidelines at the last Coordinators meeting, COM(2007)32 final ] 1 June 2007: 1 st call for input on three issues: 1. Institutional framework (type of binding document) 2. Coordination framework (structures) 3. Integration of existing structures Inputs received  Corridor I (by Mr. Miettinen, 11 June 2007)  Corridor III (by Mrs. Wunderlich, 12 June 2007) – the initial position within the public consultation  Corridor VI (by Mr. Zarnoch, 6 June 2007)  Corridor X – the initial position within the public consultation 22 August 2007: Summary of inputs received and 2 nd call for input Other inputs received after 2 nd call  Corridor IV (by Mr. Nowak, 18 October 2007)  Corridor VII (by Mr. Dionelis, 24 August 2007) – the initial position within the public consultation 24 October 2007: This summary of all views expressed up today within Workshop 4

1. Institutional framework (type of binding document) PEC I: A new MoU for the entire axis is necessary. The simple and light type of agreement of an MoU is more likely to be achieved within reasonable timeframes. The will to cooperate is that matters and not the agreement, since, regardless of the type of agreement, if any country cannot or will not adhere the agreement for any reason the axis structures cannot react in anyway. Stronger agreements can be drawn for projects and specific corridor development programs between affected countries and when they are ready for it. PEC III: An MoU between the Commission and the countries along a priority axis should be concluded. The alternative to an MoU would be an agreement or a settlement to be legally binding but it would be problematic due to possible conflicts with the prevailing planning laws of the participating countries and due to procedural obstacles (ratification). PEC IV: An MoU can contain a binding commitment. It has the advantage that becomes legally valid more quickly than a multilateral agreement, which might take years to ratify. PEC VI: Cooperation can be performed only on the base of existing structures. More binding decisions can be taken within ECMT, and neighboring countries can be occasionally invited for taking necessary decisions with the EU countries. PEC VII: Signing of a binding document (International Agreement, Treaty or any other type of Legal Instrument), which will set the rules for the operation of the general system. In this International Agreement or Treaty, a clear reference should be made for the existing MoUs of the Corridors function, in order to keep in force their power. PEC X: There is need for a more binding document, where there is relevant maturity of the concerned countries, i.e. accession countries, the Energy Treaty could be extended to the Transport sector.

2. Coordination framework (structures) 1/2 PEC I: Does not quite agree with the framework outlined by the Commission. Ministerial meetings are difficult to organize (number of Ministers increases). Main coordinating body would be a Steering Committee of the Axis, composed by high-level officials of all countries acting on behalf of Ministers of Transport. Coordinator would be an ideal Chairman of the Steering Committee for political networking. Secretariat assists in technical and administrative matters the Committee and the Coordinator. Regional working groups include existing PECs Steering Committees. PEC III: DG TREN representatives are responsible for the coordination with the neighboring countries along the priority axes. A Steering Committee with national representatives and EU representative is established (in the case of Central Axis by extension of PEC III SC). A Secretariat for the entire axis is recommended. National coordinators (not the members of the SC) would be the direct partners of the Secretariat. PEC IV: Axes should be realized by broken down into several sections of stronger political, economic and cultural homogeneity, in order to prevent problems arising in individual sections from affecting other sections or an entire Axis. The existing structures of Steering Committees and Technical Secretariats should be maintained in principle. Every Axis should be assigned such a structure for each one of the sections of an Axis, supported by Regional Committees. The coordination framework should be reinforced: The Steering Committee should receive the active support of the Commission DG TREN, be granted decision making authority, competences to funding of proposed measures and control of construction activities. The Secretariat should be given a sound financial basis. The rights and obligations of the Steering Committee and the Secretariat should be briefly regulated by the agreement of the Axis.

2. Coordination framework (structures) 2/2 PEC VII: A High Level Group composed by countries’ and major international organizations’ representatives will steer the work of all the system should be the only decision making body, permanently chaired by a Senior Official of the European Commission and responsible to define the final alignment and standards of the axes comprising the Corridors. A Regional Steering Group with a Chairman and a Secretary per Axis should be established with only technical duties, as well as one Technical Secretariat to provide technical support to all the Regional Steering Groups (in which Corridors’ Chairs permanently should participate) and fully financed by the European Commission. PEC VI: Agrees with the framework outlined by the Commission. Crucial point is financing of Secretariats. The coordinators’ scheme could be introduced for certain projects of European interest. Finds PEC VII proposal for structures too complicated. PEC X: A Steering Group composed by high-level officials of all countries acting on behalf of Ministers of Transport and EU representative would be the coordination – implementation body, supported by a Regulatory/ Administrative Unit (Secretariat) for technical and administrative support. Sectorial (regional) TS act under the Regulatory/ Administrative Unit, comprising the existing PECs Secretariats. Financing could come from EU funds and national resources, in the model of the Energy Treaty and SEETO.

3. Integration of existing structures PEC I: Cooperation framework for the Northern Axis needs to be established on entirely new basis, by creating a single axis level cooperation structure under the auspices of the Commission. PEC III: Reference is made only for the case of PEC III, where in the case of Central Axis the Steering Committee of PEC III is extended to cover the additional countries along the Axis. PEC IV: The existing Steering Committees become Regional Committees to support the Steering Committee of the Axis. “Steering Committees and Secretariats should be also responsible for any Corridors that might be located in the area of an Axis so that diverging activities are not carried out for Corridors and Axes by different committees and to guarantee a uniform procedure for Corridors and Axes.” PEC VI: We should be based on the five new axes than existing structures if we decide to appoint Regional Steering Groups. PEC VII: The Chairs (or other key-persons) of the existing PECs and other international bodies should be permanent participants in one or more Regional Steering Groups. A special budget for the operation of the Technical Secretariat shall be allocated for services of a pool of experts (with Secretaries of the existing Corridors on top) to assist the function of the Secretariat when necessary. PEC X: Existing Technical Secretariats would be in the future Sectorial Technical Secretariats under a central Regulatory/ Administrative Unit.

Positions summary 1/3 PEC INew MoU per Axis. Stronger agreements on specific projects or corridors. PEC IIINew MoU per Axis. PEC IVAn MoU can contain a binding commitment. PEC VIExisting MoUs. More binding decisions can be taken within ECMT PEC VIIA binding document (International Agreement, Treaty etc.), with reference to the existing MoUs. PEC XA binding document where there is maturity of the concerned countries (e.g. extension of Energy Treaty to the Transport sector. Institutional framework (type of binding document)

Positions summary 2/3 PEC ISteering Committee for the entire Axis. Coordinator ideal Chairman. Secretariat for the SC technical/ administrative support. Regional working groups. PEC IIIDG TREN responsible for the coordination with countries along all axes. Steering Committee and Secretariat for the entire Axis. National coordinators for cooperation with the Secretariat. PEC IVEvery Axis should be assigned Steering Committee and Technical Secretariat supported by Regional Committees for each one of the sections of an Axis. PEC VIEC proposal (Ministerial Meetings, Regional Steering Groups, Secretariat). Coordinators for certain projects of European interest. PEC VIIHLG (countries, international organizations) permanently chaired by EC. Regional Steering Groups, per Axis (incl. Corridors’ Chairs) with only technical duties. One Secretariat to provide technical support to all the Regional Steering Groups. PEC XSteering Group per Priority Axis, supported by a Regulatory/ Administrative Unit (Secretariat) for technical and administrative support. Sectorial (regional) Technical Secretariats. Coordination framework (structures)

Positions summary 3/3 PEC IRegional working groups (including existing PECs SCs) if they decide to continue their work. PEC IIIIn the case of Central Axis the SC of PEC III is extended to cover the additional countries. PEC IV“Steering Committees and Secretariats should be also responsible for any Corridors that might be located in the area of an Axis.” PEC VICooperation of Regional Steering Groups with other organizations. PEC VIIExisting international bodies participants in Regional Steering Groups. Pool of experts (PECs Secretaries on top) to assist the Secretariat when necessary. PEC XExisting Technical Secretariats included in the Sectorial ones. Convergence to the view of Integration of existing structures

Discussion 1/2 1.It seems more realistic to retain the existing volunteer-based framework with the signing of an MoU per priority axis. That could be achieved in reasonable timeframes, while stronger agreements could be signed for specific projects or group of countries when the situation is mature enough. 2.Concerning the structures proposed by the Commission: PEC VI agrees, PEC IV proposes the establishment of a High Level Group, while the rest are additionally in favor of establishing a Steering Committee/ Group for the implementation of the MoU and the coordination of the activities. In the latter the ministerial meetings are avoided through the representation of high-level representatives of the Ministers to the Steering Committees.

Discussion 2/2 A Secretariat supports the Steering Committee: - PECs III and VI support one Secretariat for the entire axis, while PECs I and X propose Regional Working Groups and Sectorial Technical Secretariats incorporating the existing structures, Steering Committees and Technical Secretariats, respectively. - PECs IV and VII propose Regional Steering Groups (Committees). - PECs I and VI talk about Coordinators scheme introduction, the first to be an ideal permanent Chairman of the Steering Committee and the second for certain projects. Also PEC IV suggests the assignment of a Coordinator for the case of the Balkan region. Convergence to the view of integration of existing structures Finally, concerning the extension of existing structures to the non- covered regions PEC X suggests a combination with creation of new structures in some cases and extension of others where the geographical coverage and linkage allows it. Also PEC’s III structures are extended (only) in the case of Central Axis.