CMS at UCSB Prof. J. Incandela US CMS Tracker Project Leader DOE Visit January 20, 2004.

Slides:



Advertisements
Similar presentations
Freiburg Seminar, Sept Sascha Caron Finding the Higgs or something else ideas to improve the discovery ideas to improve the discovery potential at.
Advertisements

ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
The CMS Detector Paoti Chang National Taiwan University
Guoming CHEN The Capability of CMS Detector Chen Guoming IHEP, CAS , Beijing.
1 Stefan Spanier, 22 October 2008 Research Participation in Collider Based Particle Physics Stefan Spanier University of Tennessee, Knoxville.
March, 11, 2006 LCWS06, Bangalore, India Very Forward Calorimeters readout and machine interface Wojciech Wierba Institute of Nuclear Physics Polish Academy.
US CMS Silicon Tracker Project – Breakout session Overview - DOE/NSF Review Brookhaven - May 20, Incandela 1 CMS Si Tracker: Breakout Session Dept.
P5 Meeting - Jan , US LHC University M&O Personnel University with major hardware responsibility at CERN Based on > 10 years of US Zeus experience.
MEG Review at Brookhaven, Feb 5, 2004 : CMS Si Tracker Project: J. Incandela 1 US CMS Silicon Tracker US LHC Detector Maintenance and Operations Evaluation.
US Tracker Production Meeting, March 8, 2005 J. Incandela 1 Slides for the US Si Tracker Weekly Production Meeting J. Incandela March 8, 2005.
MEG Review at BNL, Jan. 18, 2006 : CMS Si Tracker Project: J. Incandela 1 US CMS Silicon Tracker US LHC Detector Maintenance and Operations Evaluation.
LHC SPS PS. 46 m 22 m A Toroidal LHC ApparatuS - ATLAS As large as the CERN main bulding.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 1 Slides for the US Si Tracker Institutional Group Leaders Meeting J. Incandela March.
DOE REVIEW 1/20/04 – Dean White 1 Gantry Module Assembly TOB & TEC Dean White University of California, Santa Barbara.
LHC Experiments at Liverpool E2V Visit – Nov 2005 Introduction Si Technology Upgrade/Maintenance Summary.
US CMS Silicon Tracker : Overview J. Incandela University of California Santa Barbara US CMS Silicon Tracker Project Manager Fermilab PMG April 9, 2004.
DOE/NSF Review, BNL, May 20, Incandela1 CMS Tracker: Cost, Schedule, Planning and M&O Joe Incandela, University of California Santa Barbara US CMS.
The LHCb Inner Tracker Marc-Olivier Bettler SPS annual meeting Zürich 21 February 2007.
MEG Review at FNAL, Jan. 28, 2005 : CMS Si Tracker Project: J. Incandela 1 US CMS Silicon Tracker US LHC Detector Maintenance and Operations Evaluation.
UCSB CDF Group, DOE Site visit, Jan 18, J. Incandela 1 Top Physics at CDF ++ Top Quark and New Physics with an eye toward the LHC Work completed.
UCSB Top Quark Analyses On CDF J.Lamb, C.Hill, J. Incandela, C. Mills DOE Visit January 20, 2004.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
US Module Production Status Joe Incandela University of California Santa Barbara for the US CMS Silicon Tracker Group CERN Tracker Week July 2004.
US CMS Silicon Tracker Project Joe Incandela University of California Santa Barbara Status and schedule CMS Weekly Meeting Fermilab May 14, 2004.
US Module Production Prof. J. Incandela US CMS Tracker Project Leader For the US CMS Tracker Group Tracker Meetings - CERN Feb. 13, 2004.
UCSB CMS Group, DOE Site visit, Jan 18, 2005 J. Incandela 1 UCSB in CMS.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
US CMS Silicon Tracker Project Joe Incandela University of California Santa Barbara US CMS Silicon Tracker Project Manager DOE/NSF Review of CMS Detector.
Status of TOB Modules & Rods J. Incandela For the US CMS Tracking Group Tracker Week, Feb
US Tracker Project – CERN - July 17, Incandela 1 US Production Readiness CMS Tracker Week 17/06/03 CERN J. Incandela University of California Santa.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
H.J.Simonis, CMS Collaboration, Novosibirsk Feb.08 Status of the Silicon Strip Detector at CMS INSTR08 Novosibirsk, Feb08 Hans Jürgen Simonis Universität.
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
Performance of ATLAS & CMS Silicon Tracker Alessia Tricomi University and INFN Catania International Europhysics Conference on High Energy Physics EPS.
The SLHC and the Challenges of the CMS Upgrade William Ferguson First year seminar March 2 nd
EPS 2003, July 19, 2003David Buchholz, Northwestern University Performance of the D0 Experiment in Run II Detector Commissioning and Performance Accelerator,
Jornadas LIP, Dez P. Martins - CFTP-IST The NA60 Silicon Vertex Telescopes Dimuon measurements Dimuon measurements Vertex telescope used in: Vertex.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
Roger Rusack – The University of Minnesota 1.
Surrounding the tracker, the calorimetry system measures with high accuracy the energy of electrons and photons as well as individual hadrons with 7500.
US CMS Silicon Tracker Project Regina Demina KSU Florida State University May 11, 2002.
C. K. MackayEPS 2003 Electroweak Physics and the Top Quark Mass at the LHC Kate Mackay University of Bristol On behalf of the Atlas & CMS Collaborations.
Operation of the CMS Tracker at the Large Hadron Collider
Design and development of micro-strip stacked module prototypes for tracking at S-LHC Motivations Tracking detectors at future hadron colliders will operate.
The CMS detector as compared to ATLAS CMS Detector Description –Inner detector and comparison with ATLAS –EM detector and comparison with ATLAS –Calorimetric.
CLICdp achievements in 2014 and goals for 2015 Lucie Linssen, CERN on behalf of the CLICdp collaboration CLIC workshop, January 30 th
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
Searching for New Matter with the D0 Experiment Todd Adams Department of Physics Florida State University September 19, 2004.
CP violation in B decays: prospects for LHCb Werner Ruckstuhl, NIKHEF, 3 July 1998.
The Standard Model of the elementary particles and their interactions
1. Efficient trigger for many B decay topologies Muon System CALORIMETERS PRS + ECAL+ HCAL RICH1 VERTEX LOCATOR Efficient PID Good decay time resolution.
From the Standard Model to Discoveries - Physics with the CMS Experiment at the Dawn of the LHC Era Dimitri Bourilkov University of Florida CMS Collaboration.
The CMS Silicon Strip Tracker Carlo Civinini INFN-Firenze On behalf of the CMS Tracker Collaboration Sixth International "Hiroshima" Symposium on the Development.
Fabiola Gianotti, 14/10/20031  s = 28 TeV upgrade L = upgrade “SLHC = Super-LHC” vs Question : do we want to consider also the energy upgrade option.
DØ Beauty Physics in Run II Rick Jesik Imperial College BEACH 2002 V International Conference on Hyperons, Charm and Beauty Hadrons Vancouver, BC, June.
PH/DT2 Scientific Tea PH-DT2 Scientific Tea, 29 April 2005 : The CMS Tracker - Mechanical Aspects Antti Onnela, PH-DT2: 1. CMS Tracker and.
A New Inner-Layer Silicon Micro- Strip Detector for D0 Alice Bean for the D0 Collaboration University of Kansas CIPANP Puerto Rico.
An Overview of the FPIX Detector Upgrade – CMS Experiment
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
IOP HEPP Conference Upgrading the CMS Tracker for SLHC Mark Pesaresi Imperial College, London.
Silicon Pixel Detector for the PHENIX experiment at the BNL RHIC
Commissioning and performance of the CMS silicon microstrip detector
FNAL Production Experience
On behalf of the US TOB testing group
Results from module testing
On behalf of the US TOB testing group
Electrical Testing at UCSB: Hybrids, Modules, & Rods
Performance of ATLAS & CMS Silicon Tracker
SUSY SEARCHES WITH ATLAS
Presentation transcript:

CMS at UCSB Prof. J. Incandela US CMS Tracker Project Leader DOE Visit January 20, 2004

UCSB CMS Group January 20, 2003, J. Incandela 2 Experimental Focus Some of the questions LHC Experiments could resolve: What is the origin spontaneous symmetry breaking ? What sets the known energy scales ?  QCD ~ 0.2 « VEV EWK ~ 246 « M GUT ~ « M PL ~ GeV What comes next ? Supersymmetry ? Is this what explains the galactic dark matter ? Extra dimensions ? Something completely unexpected? Big questions nowadays require big machines…

CERN Large Hadron Collider

27 km around 1100 dipole magnets 14 m long 8.4 T field dual aperture Proton on proton: 14 TeV 25 ns between beam crossings Peak Luminosity cm -2 s collisions per beam crossing

UCSB CMS Group January 20, 2003, J. Incandela 5 Challenge and Reward Higher Energy Broadband production BUT Total cross-section is very high! What’s interesting is rare The ability to find any of these events is a consequence of evolved detector design and technological innovations: Multi-level trigger systems and high speed pipe-lined electronics Precision, high rate, calorimetry Radiation-tolerant Silicon microstrips and Pixel detectors

UCSB CMS Group January 20, 2003, J. Incandela 6 SM Higgs at the LHC Production and Decay To a large extent, the quest for the Higgs drives the design of the LHC detectors. Nevertheless, essentially all other physics of interest require similar capabilities

UCSB CMS Group January 20, 2003, J. Incandela 7 Light SM Higgs Lepton id, b tagging and E T are crucial Energy resolution must be exceptional, tracking is crucial Difficult (or impossible)

UCSB CMS Group January 20, 2003, J. Incandela 8 CMS Experiment at CERN Most Ambitious Elements: Calorimetry & Tracking

UCSB CMS Group January 20, 2003, J. Incandela 9 CMS Inner Detector Inside of the 4 Tesla field of the largest SC Solenoid ever built Pixels: at least 2 Layers everywhere Inner Si Strips: 4 Layers Outer Si Strips: 6 Layers Forward Silicon strips: 9 large, and 3 small disks per end EM Calorimeter: PbWO 4 crystals w/Si APD’s Had Calorimeter: Cu+Scintillator Tiles Outside: Muon detectors in the return yoke

UCSB CMS Group January 20, 2003, J. Incandela 10

UCSB CMS Group January 20, 2003, J. Incandela 11 Tracking “Golden Channel” Efficient & robust Tracking  Fine granularity to resolve nearby tracks  Fast response time to resolve bunch crossings  Radiation resistant devices Reconstruct high P T tracks and jets  ~1-2% P T resolution at ~ 100GeV (  ’s) Tag b jets  Asymptotic impact parameter  d ~ 20  m

UCSB CMS Group January 20, 2003, J. Incandela 12 CMS Tracker 5.4 m End Caps (TEC 1&2) 2,4 m Inner Barrel & Disks (TIB & TID) Pixels Outer Barrel (TOB) volume 24.4 m 3 running temperature – 10 0 C

UCSB CMS Group January 20, 2003, J. Incandela 13 Pixels Why Pixels ? IP resolution Granularity Peak occupancy ~ 0.01 % Starting point for tracking Radiation tolerance CMS Pixels 45 million channels 100  m x 150  m pixel size Barrel: 4, 7 and 11 cm 2 (3) disks per end

UCSB CMS Group January 20, 2003, J. Incandela 14 Silicon Strips 6 layers of 500  m sensors high resistivity, p-on-n 4 layers of 320  m sensors low resistivity, p-on-n Blue = double sided Red = single sided 9+3 disks per end Strip lengths range from 10 cm in the inner layers to 20 cm in the outer layers. Strip pitches range from 80  m in the inner layers to near 200  m in the outer layers

UCSB CMS Group January 20, 2003, J. Incandela 15 Some Tracker Numbers 6,136 Thin wafers 300 μm 19,632 Thick wafers 500 μm 6,136 Thin detectors (1 sensor) 9,816 Thick detectors (2 sensors) Thin modules (ss +ds) Thick modules (ss +ds) 10,016,768 individual strips and readout electronics channels 78,256 APV chips ~26,000,000 Bonds 470 m 2 of silicon wafers 223 m 2 of silicon sensors (175 m m 2 ) FE hybrid with FE ASICS Pitch adapter Silicon sensors CF frame

UCSB CMS Group January 20, 2003, J. Incandela 16 APV  m radiation-hard CMOS technology 128 Channel Low Noise Amplifier ~8 MIP dynamic range 50 ns CR-RC shaper 192 cell analog pipeline Differential analog data output

UCSB CMS Group January 20, 2003, J. Incandela 17 Efficiency, Purity, Resolution

UCSB CMS Group January 20, 2003, J. Incandela 18 CMS Physics Reach HIGGS The Standard Model Higgs can be discovered over the entire expected mass range up to about 1 TeV with 100 fb -1 of data. Most of the MSSM Higgs boson parameter space can be explored with 100 fb -1 and all of it can be covered with 300 fb -1. SUSY squarks and gluinos up to 2 to 2.5 TeV or more SUSY should be observed regardless of the breaking mechanism

UCSB CMS Group January 20, 2003, J. Incandela 19 Squarks and Gluinos SUSY could be discovered in one good month of operation … The figure shows the q, g mass reach for various luminosities in the inclusive E T + jets channel. ~ ~

UCSB CMS Group January 20, 2003, J. Incandela 20 Gluino reconstruction M. Chiorboli ~ p p b b - l  l  l ~ Event final state:  2 high p t isolated leptons OS  2 high p t b jets missing E t ~ bb g pp   0 1 ~ (26 %) (35 %) (0.2 %)    llll ~ ~ (60 %)  ll UCSB could play a significant role here…

UCSB CMS Group January 20, 2003, J. Incandela 21 CMS Physics Reach Extra dimensions: LED: Sensitive to multi-TeV fundamental mass scale SED: Gravitons up to 1-2 TeV in some models And more. If Electroweak symmetry breaking proceeds via new strong interactions something new has to show up New gauge bosons below a few TeV can be discovered If the true Planck scale is ~ 1 TeV, we may even create black holes and observe them evaporate… This is an outstanding program. It requires unprecedented cost and effort. It is not guaranteed…

UCSB CMS Group January 20, 2003, J. Incandela 22 Our Responsibility 5.4 m 2.4 m Outer Barrel (TOB) ~105 m 2 NEW:End Caps (TEC) 50% Modules for Rings 5 and 6 and hybrid processing for Rings 2,5,6

UCSB CMS Group January 20, 2003, J. Incandela 23 Module Components Kapton-bias circuit Carbon Fiber Frame Silicon Sensors Front-End Hybrid Pitch Adapter Kapton cable Pins

UCSB CMS Group January 20, 2003, J. Incandela 24 Rods & Wheels 0.9 m 1.2 m

ROD INTEGRATION AachenKarlsruheStrasbourgZurichWien PETALS INTEGRATION Aachen Brussels Karlsruhe Louvain LyonStrasbourg Brussels Wien Lyon TECassembly TECassembly CERN Frames: Brussels Sensors: factories Hybrids: Strasbourg Pitch adapter: Brussels Hybrid: CF carrier TK ASSEMBLY At CERN Louvain Strasbourg Pisa PerugiaWien BariPerugia BariFirenzeTorinoPisaPadova TIB-TID INTEGRATION FNAL UCSB TOBassembly TIB-IDassembly At CERN PisaAachenKarlsruhe.--> Lyon Karlsruhe Pisa Sensor QAC Module assembly Bonding & testing Sub-assemblies FNAL US and UCSB in the CMS tracker Integration into mechanics KSU UCSB carries majority of US production load FNAL UCSB

UCSB CMS Group January 20, 2003, J. Incandela 26 Active Group Fermilab (FNAL) L. Spiegel, S. Tkaczyk + technicians Kansas State University (KSU) T.Bolton, W.Kahl, R.Sidwell, N.Stanton University of California, Riverside (UCR) Gail Hanson, Gabriella Pasztor, Patrick Gartung University of California, Santa Barbara (UCSB) A. Affolder, A. Allen, D. Barge, S. Burke, D. Calahan, C.Campagnari, D. Hale, (C. Hill), J.Incandela, S. Kyre, J. Lamb, C. McGuinness, D. Staszak, L. Simms, J. Stoner, S. Stromberg, (D. Stuart), R. Taylor, D. White University of Illinois, Chicago (UIC) E. Chabalina, C. Gerber, T. T University of Kansas (KU) P. Baringer, A. Bean, L. Christofek, X. Zhao University of Rochester (UR) R.Demina, R. Eusebi, E. Halkiadakis, A. Hocker, S.Korjenevski, P. Tipton Mexico:3 institutes led by Cinvestav Cuidad de Mexico 2 more groups are in the process of joining us

UCSB CMS Group January 20, 2003, J. Incandela 27 Outer Barrel Production Outer Barrel Modules 4128 Axial (Installed) 1080 Stereo (Installed) Rods 508 Single-sided 180 Double-sided US Tasks  UCSB leadership All hybrid bonding & test All Module assembly & test All Rod assembly & test Joint Responsibilities with CERN Installation & Commissioning Maintenance and Operation ~20 cm Modules Built & Tested at UCSB (more in talk by Dean White)

UCSB CMS Group January 20, 2003, J. Incandela 28 End Cap Construction Some Central European groups failed to produce TEC modules. TEC schedule was threatened. Central European Consortium requested US help We agreed to produce up to 2000 R5 and R6 modules After 10 weeks UCSB successfully built the R6 module seen above. We’re nearly ready to go on R5 Module Built & Tested at UCSB (more in talk by Dean White)

UCSB CMS Group January 20, 2003, J. Incandela 29 UCSB Production Leadership Gantry (robotic) module assembly Redesigned More robust, flexible, easily maintained Surveying and QA Automated use of independent system (OGP) More efficient, accurate, fail-safe Module Wirebonding Developed fully automated wirebonding Faster and more reliable bonding Negligible damage or rework Taken together: Major increase in US capabilities Higher quality

UCSB CMS Group January 20, 2003, J. Incandela 30 Testing & QA UCSB the leader (cf. talk by A.Affolder) Testing macros and Test stand configurations now used everywhere Critical contributions Discovered and played lead role in solution of potentially fatal problems! Defective hybrid cables Vibration damage to module wirebonds (cf. Talk Andrea Allen) Discovered a serious Common Mode Noise problem and traced it to ST sensors Other Important contributions; First to note faulty pipeline cells in APVs Led to improved screening Taken together Averted disaster (financial, and schedule) Higher quality 4-Hybrid test stand and thermal cycler (subject of talk by Lance Simms) Improved testing (see talk by Tony Affolder)

UCSB CMS Group January 20, 2003, J. Incandela 31 Rods UCSB Efforts Building single rod test stands for both UCSB and FNAL Designed and built module installation tools (for CERN, FNAL and UCSB) Will lead in the definition of tests and test methods Production Will build and test half of the 688 rods (+10% spares) in the TOB

UCSB CMS Group January 20, 2003, J. Incandela 32 Summary CMS is designed to maximize LHC physics The tracker is one of the main strengths of CMS UCSB is making critical contributions Have proven to be essential to the success of the project Subsequent talks Details of the important aspects of the project and the important achievements of the UCSB CMS group in the past year as presented by the people responsible for them.

UCSB CMS Group January 20, 2003, J. Incandela 33 Schedule of CMS Presentations Overview (25’) - Joe Incandela Module Fabrication (20’) - Dean White Electronic Testing (20’)– Tony Affolder Rod Assembly and Testing (10’)– Jim Lamb Wirebonding (10’)– Susanne Kyre Database (10’)– Derek Barge Hybrid Thermal and Electronic Testing (10’) – Lance Simms OGP Surveying and Module Reinforcing (10’)– Andrea Allen Schedule and Plans (10’) – Joe Incandela