Workbench følgegruppemøde - 28.04.2010 Esben Auken GeofysikSamarbejdet, Geologisk Institut, Aarhus Universitet.

Slides:



Advertisements
Similar presentations
Workshop: Preventive Maintenance
Advertisements

National Environmental Research Institute, University of Aarhus, Denmark GIS Guidance update.
26 February 2003 APNIC 15 Taipei, Taiwan RWhois Database SIG Tim Christensen Database Administrator ARIN.
JTX Overview Overview of Job Tracking for ArcGIS (JTX)
High Availability Options for JD Edwards EnterpriseOne Shawn Scanlon, GSI.
Large Scale Mapping of Groundwater Resources Using a Highly Integrated Set of Tools Verner H. Søndergaard Geological Survey of Denmark and Greenland, Denmark.
© 2008 RightNow Technologies, Inc. Title Best Practices for Maintaining Your RightNow Knowledge Base Penni Kolpin Knowledge Engineer.
Nyeste erfaringer med processering af SkyTEM data Esben Auken GeoFysikSamarbejdet Geologisk Institut, Aarhus Universitet.
D. Düllmann - IT/DB LCG - POOL Project1 POOL Release Plan for 2003 Dirk Düllmann LCG Application Area Meeting, 5 th March 2003.
GLAST LAT Project CCB Review – June 28 th, 2005 GLAST LAT I&T Online A.T.Kavelaars 1 GLAST Large Area Telescope: I&T CCB Review June 28 th, 2005 E-Logbook.
WSN Simulation Template for OMNeT++
SDLC. Information Systems Development Terms SDLC - the development method used by most organizations today for large, complex systems Systems Analysts.
Marine GIS Applications using ArcGIS Global Classroom training course Marine GIS Applications using ArcGIS Global Classroom training course By T.Hemasundar.
Integrated planning on hydrogeophysical data on a national scale: From processing, interpretation and storage to visualisation Ingelise Møller, Flemming.
Collections Management Museums EMu New Developments EMu (and beyond!) Bernard Marshall Chief Technical Officer KE Software.
Introduction to the course January 9, Points to Cover  What is GIS?  GIS and Geographic Information Science  Components of GIS Spatial data.
Overview SAP Basis Functions. SAP Technical Overview Learning Objectives What the Basis system is How does SAP handle a transaction request Differentiating.
E-Con Roadmap to Success Roadmap for the e-Con Sales and Product Configurator.
February Marta Garcia Carnero (CAD Support) 1.General 2.CATIA field 3. SmarTeam field February
SSIS Over DTS Sagayaraj Putti (139460). 5 September What is DTS?  Data Transformation Services (DTS)  DTS is a set of objects and utilities that.
Cube Enterprise Database Solution presented to MTF GIS Committee presented by Minhua Wang Citilabs, Inc. November 20, 2008.
 On Wednesday, June 4, 2014, we will upgrade both version 10.2 and version 10.3 during the same time period. After the upgrade has finished, we will.
13 ° COSMO General Meeting Rome VERSUS2 Priority Project Report and Plan Adriano Raspanti.
The Asset Inventory Management module assists with data collection and discovery management processes. Collected information is interpreted and automatically.
Understand Application Lifecycle Management
Max Planck Institute for Psycholinguistics Tool development report H. Brugman MPI Nijmegen.
1 Software Development Configuration management. \ 2 Software Configuration  Items that comprise all information produced as part of the software development.
Client Data System: Progress and Plans for the Future Eric Burgess Sr. Product Manager Esther Chang Product Manager.
EGEE is a project funded by the European Union under contract IST Testing processes Leanne Guy Testing activity manager JRA1 All hands meeting,
Yokogawa Electric Corporation Copyright © Yokogawa Electric Corporation Release 2.10 Functionality Overview September 2004.
Marcelo R.N. Mendes. What is FINCoS? A Java-based set of tools for data generation, load submission, and performance measurement of event processing systems;
Copyright © Yokogawa Electric Corporation Release 2.10 Functionality Overview September 2004.
4.1 Advanced Operating Systems Desktop Scheduling You are running some long simulations. In the mean time, why not watch an illegally downloaded Simpsons.
1 MassChallenge Technology Review MassChallenge Technology Review (April July 2011) MassChallenge Web Technology Review April July 2011 Johnny.
QUALITY ASSURANCE PRACTICES. Quality Plan Prepared and approved at the beginning of project Soft filing system approach followed. Filing location – –
Lecture Introduction to Software Development SW Engg. Development Process Instructor :Muhammad Janas khan Thursday, September.
Ganda ERP Project | ERP Project Status Report for CFC Oct 2014.
NCI Clinical Trials Reporting Program CTRP User Group June 14, 2010.
T Progress Demo Byte-Pit T Progress demo 2 Agenda  Introduction (3 min)  Project status (5 min)  Status of project requirements.
Electrical and Computer Engineering Klaus Kristo Clem Leung Adam Frieden Chris Davidson Faculty: Professor Ramgopal Mettu Project: iPlanAhead Midway Design.
Rev Advanced User Training We’ll Start at 9:00AM Mike Horan Pictometry Trainer.
H. Thiemann (M&D) / / 1 Hannes Thiemann M&D Statusseminar, 22. April 2004.
Surface Water Quality Monitoring Information System (SWQMIS) Cindi Atwood Tetra Tech, Inc. (703) Nancy Ragland TCEQ.
] COREY PEARSON [ ASUG INSTALLATION MEMBER MEMBER SINCE: 2008 CHAVONE JACOBS [ ASUG INSTALLATION MEMBER MEMBER SINCE: 2003 ALLAN FISHER [ ASUG INSTALLATION.
Deploy Mobil Apps Presented by: Dani Lakeberg Director of Services
CMap Version 0.16 Ben Faga. CMap CMap Version 0.16 Bug fixes and code optimizations More intuitive menu system Asynchronous loading of comparative map.
REPORTING SOFTWARE for BUILDING & INDUSTRIAL AUTOMATION.
ProShell Procedure Framework Status MedAustron Control System Week 2 October 7 th, 2010 Roland Moser PR a-RMO, October 7 th, 2010 Roland Moser 1.
Nikolaj Foged, and Esben Auken HydroGeophysics Group, Department of Earth Sciences, Aarhus University, Denmark Coil response inversion in Aarhus Workbench,
Ocean Observatories Initiative R2.0 Beta Session 2 January 9, ION R2.0 Beta Test Session 2: Working with Marine Resources Susanne Jul, Lynn Morgan,
Orchestrated 4.2 Release Overview Presented by: Glen Thonis Solutions Expert January 29 th, 2015.
T Project Review MalliPerhe Iteration 3 Implementation
Marcelo R.N. Mendes. What is FINCoS? A Java-based set of tools for data generation, load submission, and performance measurement of event processing systems;
Keeper Functionality DAILY KEEPER DATA ENTRY.
The VVSG 2005 Revision Overview EAC Standards Board Meeting February 26-27, 2009 John P. Wack NIST Voting Program National Institute.
Patrick Desbrow, CIO & VP of Engineering October 29, 2014
Welcome POS Synchronize Concept 08 Sept 2015.
Software Engineering (CSI 321)
Design Components are Code Components
Online Monitoring : Detector and Performance check
Comparing AEM with lithological data using a comprehensive database system for geological and downhole geophysical information Esben Auken, Professor HydroGeophysics.
Olof Bärring LCG-LHCC Review, 22nd September 2008
CAR Phase 22 Release Notes
SAEG 7th June 2016 Item 5.2 Eurostat migration to JD+: state of the art By Dario Buono.
Orchestrated 4.2 Release Overview
Design Components are Code Components
Workday 32 Alicia Maule January 14, 2019
SOFTWARE DEVELOPMENT LIFE CYCLE
Allscripts EHR: comprehensive solutions
Presentation transcript:

Workbench følgegruppemøde Esben Auken GeofysikSamarbejdet, Geologisk Institut, Aarhus Universitet

Agenda 1. Finished and ongoing projects 2. 2 nd half year of Eventual 4. Next meeting

Support and drift l Update releases - 2 Major new developments l Maintenance releases - 5 Minor bug fixes of a character which has required an immediately fix l Support through Intension to keep a response time of less than 24 hours Fixes (always) takes longer - unfortunately - so be patient

Major new developments - SCI l New user interface for the SCI module - setup is made in a comprehensive wizard l A-priori information from three sources directly from the GIS by selecting a number of models attaching a grid to a layer interface attaching a seismic interface to a layer interface conductivity log attached to a number of models l A large number of optimizations in the database and inversion engine itself l Stabilizations of the inversion engine - ongoing work

Major new developments - DOI l Implementation of DOI calculation in the inversion kernel l DOI calculated during an LCI or SCI run

Major new developments - DOI l Implementation of DOI calculation in the inversion kernel l DOI calculated during an LCI or SCI run l DOI themes is created in the model visualization system DOI

Visualization of LCI/SCI inversions nodes l A number of new themes added - e.g DOI l Changed the internal format so themes integrates with profile sand GIS

Inversion kernel l Implementation of the Depth of Investigation (DOI) concept l Integration over finite gate length for TEM - will be used for all data collected after February 2010 l Response re-sampling for accurate modeling of front gate for very early gate times l Update of the documentation

Upcoming release l Hyper threaded batch gridding l Profiles - sections dramatically increased load speed duplicate function size and scale synchronization integration with GIS interpolation of models fading of models using DOI seismic bitmaps layer order

Upcoming release l SCI + LCI has new inversion kernel configuration editor l SCI has increased stability and run logs are automatically saved l Help for LCI and SCI l Scheduled for June 1 st. Developments stops at May 12 th.

Agenda 1. Finished and ongoing projects 2. 2 nd half year of Eventual 4. Next meeting

2 nd half year - high priority Deadline medio September 2010: l Full DOI implementation with fading of grids - requires rewriting the thematization functionality l GERDA data reporting system alternative models SCI inversions l New DBQ functionality supporting search in alternative models - requires rewriting l Creation of 3D grids for GeoScene3D

2 nd half year - already scheduled projects l SSV - support for grid calculations l QC of TEM, SkyTEM and PACES on the raw data level l Processing system for PACES data (major project) l New GIS component (major project) l Need some rescheduling by the steering group of GFS to accommodate the high priority projects

Agenda 1. Finished and ongoing projects 2. 2 nd half year of Eventual 4. Next meeting

Agenda 1. Finished and ongoing projects 2. 2 nd half year of Eventual 4. Next meeting

Next meeting l November 10th, 2010 l Minutes and ppt on the GFS homepage