NGAO operations thoughts D. Le Mignant, E. Johansson, C. Neyman.

Slides:



Advertisements
Similar presentations
Standard stars for the ZIMPOL polarimeter
Advertisements

1 Keck LGS AO Planning Workshop: Overview, Requirements & Schedule December 5, 2004.
Science Group: Status, Plans, and Issues Claire Max Liz McGrath August 19, 2008.
The Project Office Perspective Antonin Bouchez 1GMT AO Workshop, Canberra Nov
Laser guide star adaptive optics at the Keck Observatory Adam R. Contos, Peter L. Wizinowich, Scott K. Hartman, David Le Mignant, Christopher R. Neyman,
AO Controls: Status and Issues Erik Johansson, Jimmy Johnson, Doug Morrison and Ed Wetherell NGAO PD Team Meeting #6 Thursday, March 19, 2009.
NGAO Controls Team Meeting August 29, 2008 Erik Johansson.
João Frazão Rescue Project Software Architecture João Frazão.
NGAO System Design Review Response Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max for NGAO Team SSC Meeting June 18, 2008.
LGS AO Operations Transition: Introduction to Meeting April 15, 2005.
NGAO 1-tier Draft Optical Relay Design P. Wizinowich 12/7/07.
Trying to connect WBSs with people and phases Relevant questions to my work: How the realistic NGAO strategies will/should affect the work in progress?
Observing Operations Concept Document Elizabeth McGrath NGAO PD Team Meeting #6 March 19, 2009.
NGAO Report February 18, 2009 Waimea NGAO Report February 18, 2009 Waimea P. Wizinowich for the NGAO Team.
Science Operations Update NGAO - Meeting 11 D. Le Mignant, E. McGrath & C. Max W. M. Keck Observatory 11/05/2007.
Planning “Science Operations” tasks for the PD phase NGAO PD Phase D. Le Mignant W. M. Keck Observatory 08/19/2008.
Demonstration of Science Observing Modes AOWG meeting Dec. 5, 2003 D. Le Mignant, A. Bouchez for the Keck AO team.
WBS 3.3 Laser Facility Jim Bell, Jason Chin, Erik Johansson, Chris Neyman, Viswa Velur Design Meeting (Team meeting #11) November 05, 2007.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
NGAO Management Update Peter Wizinowich NGAO Meeting #11 November 5, 2007.
WBS 3.3 Laser Facility Jim Bell, Jason Chin, Erik Johansson, Chris Neyman, Viswa Velur Laser Architecture Meeting Oct 1 st, 2007.
Science Operations Replan NGAO - Meeting 6 D. Le Mignant W. M. Keck Observatory 04/25/2007.
LGS-AO Performance Characterization Plan AOWG meeting Dec. 5, 2003 A. Bouchez, D. Le Mignant, M. van Dam for the Keck AO team.
NGAO System Design Phase Management Report - Replan NGAO Meeting #6 Peter Wizinowich April 25, 2007.
Science Operations Plan NGAO - Meeting 10 D. Le Mignant W. M. Keck Observatory 09/17/2007.
NGAO interface control documents: Christopher Neyman W. M. Keck Observatory Keck NGAO PD phase Meeting #6 March 19, 2007 Videoconference.
Real Time Controller Functional Requirements Don Gavel & Marc Reinig UCO Lick, laboratory for Adaptive Optics. Keck NGAO Team Meeting December 13, 2007.
Observing efficiency for NGAO 1.Definitions 2.Lessons learned a)Keck LGS AO “efficiency” b)Keck AO brute conclusion 3.Observing efficiency budget 4. Observing.
NGAO Status R. Dekany January 31, Next Generation AO at Keck Nearing completion of 18 months System Design phase –Science requirements and initial.
NGAO discussion: Science Operations NGAO Meeting #4 D. Le Mignant 22 Jan
Agenda (Fri., June 7) 8:00AO UI Demonstration 9:00Introductions to AO team 9:05AOWG Chair Selection 9:15Review Agenda (make changes?) 9:20Review Planned.
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
NGAO System Design Phase System & Functional Requirements Documents NGAO Meeting #6 Peter Wizinowich April 25, 2007.
Design Team Report: AO Operational Tools (aka Acquisition and Diagnostics) Christopher Neyman W. M. Keck Observatory (for the Operational tools team) Keck.
WBS 3.3 Laser Facility Jim Bell, Jason Chin, Erik Johansson, Chris Neyman, Viswa Velur Design Meeting (Team meeting #10) Sept 17 th, 2007.
Design Team Report: Laser Facility Chris Neyman Jim Bell, Erik Johansson, Jason Chin W. M. Keck Observatory Viswa Velur Caltech Optical Observatories Keck.
Encouraging “System Level” Thinking Christopher Neyman, Erik Johansson, David Le Mignant W. M. Keck Observatory Viswa Velur California Institute of Technology.
NGAO topical discussion: Observing Efficiency and Uptime Budgets Telecon Meeting 12/7 D. Le Mignant and E. Johansson 7 Dec Attendees; R. Campbell,
California Association for Research in Astronomy W. M. Keck Observatory NGAO Next-Generation Adaptive Optics System NGAO Uptime Budget Keck NGAO Meeting.
NGAO High-Contrast Performance Budget (WBS aka Companion Sensitivity) Initial WFE budget and status report NGAO Team meeting #4, WMKO Kamuela.
NGAO Meeting #5 Introduction NGAO Meeting #5 Peter Wizinowich March 7, 2007.
Functional Requirements for NGAO Christopher Neyman W. M. Keck Observatory NGAO Team Meeting #9 August 24, 2007.
WMKO Next Generation Adaptive Optics: AO System Design Impact of Cost Savings Ideas Don Gavel December 19, 2008.
WBS Non-RTC Controls Erik Johansson, Jason Chin, Don Gavel, Marc Reinig Oct 31 th, 2007.
Trade Study Report: NGAO versus Keck AO Upgrade NGAO Meeting #5 Peter Wizinowich March 7, 2007.
Trying to connect WBSs with people and phases Relevant questions to my work: How the re 8 -planning will affect the work in progress? Priorities to capture.
AO Opto-mechanical System Design Status, Issues, and Plans Don Gavel UCO/Lick Observatory (for the opto-mechanical design team) Keck NGAO Team Meeting.
Design Team Report: AO Operational Tools (aka Acquisition and Diagnostics) Christopher Neyman W. M. Keck Observatory (for the Operational tools team) Keck.
NGAO System Design Phase Update Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max, Sean Adkins for NGAO Team SSC Meeting November 6, 2007.
NGAO Controls Team Kickoff Meeting August 5, 2008 Erik Johansson.
Keck AO Operations D. Le Mignant for the Keck AO team.
Hunt for Molecules, Paris, 2005-Sep-20 Software Development for ALMA Robert LUCAS IRAM Grenoble France.
MCAO Laser Coordination and SALSA Jacques Sebag / Corinne Boyer.
G. Maron, Agata Week, Orsay, January Agata DAQ Layout Gaetano Maron INFN – Laboratori Nazionali di Legnaro.
DOE Rev of Run IIb Sep 24-26, 2002  Silicon software and simulation Scope:  Design and/or modify software tools for Run IIb silicon tracker simulation.
GAYA Analyzer What Is It All About? GAYA Analyzer Medical Imaging - Gamma Medica Camera.
LSST Scheduler construction plan Francisco Delgado Sr. Software Engineer Telescope & Site.
1 MCAO at CfAO meeting M. Le Louarn CfAO - UC Santa Cruz Nov
Introduction CMS database workshop 23 rd to 25 th of February 2004 Frank Glege.
World Leaders in Combustion Management Solutions ModuleScreenshots Gas Setup Sampling The Mk7 E.G.A Cell Status Further Information.
Proposal: staged delivery of Scheduler and OpSim V1 (2016) meet most of the SRD requirements – Deliver a system that can be extended with an improved scheduler.
Mountaintop Software for the Dark Energy Camera Jon Thaler 1, T. Abbott 2, I. Karliner 1, T. Qian 1, K. Honscheid 3, W. Merritt 4, L. Buckley-Geer 4 1.
Keck Next Generation AO Next Generation Adaptive Optics Meeting #2 Caltech November 14, 2006 P. Wizinowich for NGAO Executive Committee.
Wants/Needs/Strategies for Observation Design Pipeline Processing Data Products User Tools Jessica Krick IRAC Instrument Support Team Spitzer Science Center.
WaterWare description
Interpixel Capacitance (IPC)
LGS Project Meeting December 21, 2006 Agenda SWIFT update - A. Bouchez
NGAO topical discussion: Observing Efficiency and Uptime Budgets
NGAO Uptime Budget Keck NGAO Meeting #2 Tuesday, November 14, 2006
Calibration Plan Chris Neyman W. M. Keck Observatory April 20, 2010.
Presentation transcript:

NGAO operations thoughts D. Le Mignant, E. Johansson, C. Neyman

Erik’s early draft

Top Observing Sequencer d-NIRI Inst. Sequencer NIR Inst. Sequencer Etc AO System Sequencer Laser System Sequencer Telescope & Acquisition Sequencer Data Sequencer Vis. Inst. Sequencer Sequencer = Control Laser Safety & LTCS Sequencer Atmospheric Tools Sequencer Simulation and PSF estimation Pre-observing tools DRPs, data analysis and display RTC Non- RTC Observing tools Calibrations tools Health Monitoring and System Optimization NGAO High-level Control Architecture? Etc.. RTC Non- RTC Etc..

Generic Action Flow for NGAO Control Interfaces Generic ActionsAO functions Laser functions Observing toolsEtc Simulation mode / Calibrate System Setup Run Modes Monitor Error handling Optimize Save Characterize