PEP-II and BaBar DND Review M. Sullivan Mar 23-24, 2009Page 1 PEP-II Overview and MMS Status Michael Sullivan SLAC National Accelerator Laboratory.

Slides:



Advertisements
Similar presentations
April 6th 2009Olympus Meeting at DESY, F.Brinker1 Detector power supply Detector cooling Polarity switches Kicker pulser Preparation of the experimental.
Advertisements

PEP-II Ramp Down to a Minimum Maintenance State J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
SLAC Accelerator Department Super-B-Factory John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department Caltech Meeting.
PEP Super-B High Power RF Peter McIntosh SLAC Super-B Factory Workshop in Hawaii April 2005 University of Hawaii.
PEP-II B Factory Machine Status and Upgrades John T. Seeman for the PEP-II Staff SLAC DOE Site Review April 9, 2003.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
Accelerator Systems Division FACET Project Management John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
Page 1 PEP-II D&D Planning & Costing Exercises John Seeman Accelerator Systems Division SLAC National Accelerator Laboratory.
July 7, 2008SLAC Annual Program ReviewPage 1 PEP-II DND Engineering Planning S. DeBarger Accelerator Systems Division.
PEP-II Status and Outlook John T. Seeman For the PEP-II Team SLAC EPAC Meeting June 12, 2003.
Super-B Factory Workshop January 19-22, 2004 Super-B IR design M. Sullivan 1 Interaction Region Design for a Super-B Factory M. Sullivan for the Super-B.
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
PEP-II Overview & Ramp Down Plan J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
IR2 and IR4 Summary PEP-II meeting Jan. 23, 2006 M. Sullivan.
CLIC Kickers: Status and activities for 2013 in view of the budget discussions for 2013 CTC #65 M.J. Barnes CLIC Technical Committee, November M.J.
Future Very High Luminosity Options for PEP-II John T. Seeman For the PEP-II Team e+e- Factories Workshop October 13-16, 2003.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
The Tevatron Decommissioning Plans AEM 10/17/11 Paul C. Czarapata.
ANU Shutdown Status AEM meeting Cons Gattuso 6/3/2012.
Material Disposition Planning Olga Ligeti Radiation Protection Department MARCH 24, 2009.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 1 Undulator Complex Status LCLS Introduction.
IR summary M. Sullivan Nov. 3, 2011 JLAB MEIC IR workshop.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
26-October-2006 PEP-II MAC Session HOM measurement and analysis S. Weathersby, A. Novokhatski HOMs in LER region 4: overview, history Collimator wake fields.
4th BEPCII IMAC Meeting April , 2006 Status of BEPCII Storage Rings Ma Li April 26, 2006.
July 7, 2008SLAC Annual Program ReviewPage 1 PEP-II in Run 7 and Transition Planning John T. Seeman Assistant Director PPA/LCLS.
1 Tim Michalski October 6, 2015 Engineering Issues in MEIC.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
Program Risks Risk Analysis Fallback Plans for the PEP-II B-Factory John T. Seeman DOE PEP-II Operations Review April 26, 2006.
SKEKB Mini Work SKEKB Vacuum System – Arc Section – Contents Y.Suetsugu KEKB Vacuum Group 1.Beam Chambers 2.Pumps: Pump, Pressure,
B Factory D&D Review: March 23, 2009 Page 1 Overview of re-use requests and related issues D. MacFarlane Deputy Director, PPA.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
PIP Update Aug. 21 st Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: B Pellico.
D&D Review 6 August PEP-II Minimal Maintenance State Upkeep Stan Ecklund (J. Seeman, S. DeBarger, D. Kharakh, M. Zurawel)
B Factory D&D Review: March 23, 2009 Page 1 B Factory D&D: Strategy Overview S. Kahn Director, PPA.
February 17-18, 2010 R&D ERL Gary McIntyre R&D ERL ERL Status & Schedule Gary McIntyre February 17-18, 2010 ERL Status & Schedule.
9 October 2003S. DeBarger PEP-II Vacuum Status PEP-II Machine Advisory Committee.
S UPER B site status report S. Tomassini INFN-LNF On behalf of SuperB Collaboration SuperB general meeting– Frascati – December 1-5, 2009.
Cost Evaluation of Storage Ring Magnets Claudio Sanelli March 19, 2012.
November 16-18, 2004 Belle High Luminosity Workshop 1 M. Sullivan High Luminosity workshop (HL6) November 16-18, 2004 IR Vacuum Summary and Issues.
TDR and R&D Plans J. Seeman and M. Biagini For Super-B Staff.
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
Mini MAC II PEP-II hardware M. Sullivan Apr 23-24, 2009Page 1 PEP-II Hardware Status M. Sullivan SLAC National Accelerator Laboratory Mini-MAC II Frascati,
PS - SPS Day 18-Jan-2006 PS Ring by Ray Brown.. 2.
PEP- II Linac Accelerator Systems Department Status and Plans for PEP-II John Seeman SLAC Particle and Particle-Astrophysics DOE HEPAP P5 Review April.
ELENA installation progress F. Butin / ELENA collaboration.
November 12-13, 2007 Super-B Factory: Accelerator Costing, PEP-II Hardware and Schedule J. Seeman SLAC International Review Committee meeting November.
Report Technical Director Storage-Ring-Installation Completed
High energy beam transport.
John T. Seeman DOE PEP-II Operations Review April 26, 2006
SuperB Injection, RF stations, Vibration and Operations
DR Magnets & Power Supply System ILC-ADI Meeting March 14, 2012
Michael Sullivan and John Seeman SLAC National Accelerator Laboratory
3rd Workshop on SuperB SLAC June , 2006
Potential Use of PEP-II Magnets by Project X
The first shipment of SPEAR3 magnets (9 dipoles and 12 quadrupoles) arrived April 3. The second shipment (3 dipoles, 7 quadrupoles, and 6 sextupoles)
SuperB RF and Other Components
Accelerator R&D Results from the B-factory
J. Seeman Assistant Director for PPA/LCLS
Summary of Washington DOE Review
Super-B Accelerator Overview
LCLS Injector System Overview D. H
Electron Collider Ring Magnets Preliminary Summary
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
Presentation transcript:

PEP-II and BaBar DND Review M. Sullivan Mar 23-24, 2009Page 1 PEP-II Overview and MMS Status Michael Sullivan SLAC National Accelerator Laboratory

PEP-II and BaBar DND Review M. Sullivan Mar 23-24, 2009Page 2 PEP-II Layout N Circumference 2200 m

PEP-II and BaBar DND Review M. Sullivan Mar 23-24, 2009Page 3 SLAC and PEP-II

PEP-II and BaBar DND Review M. Sullivan Mar 23-24, 2009Page 4 Tunnel Region 8 Region 7

PEP-II and BaBar DND Review M. Sullivan Mar 23-24, 2009Page 5 Tunnel Region 4

PEP-II and BaBar DND Review M. Sullivan Mar 23-24, 2009Page 6 Dipoles Support Buildings Region 8

PEP-II and BaBar DND Review M. Sullivan Mar 23-24, 2009Page 7 Support buildings Region 4

PEP-II and BaBar DND Review M. Sullivan Mar 23-24, 2009Page 8 Magnet Inventory *HER –194 main dipole magnets – 5.4 m long –202 quadrupoles – 0.56 m long –82 quadrupoles – 0.73 m long –284+ corrector magnets – 0.2 m long *LER –194 main dipole magnets – 0.45 m long –353 quadrupoles – 0.43 m long –353+ corrector magnets – 0.2 m long *HER/LER –188 sextupoles – various lengths

PEP-II and BaBar DND Review M. Sullivan Mar 23-24, 2009Page 9 HER magnets Arc dipole Corrector and quad

PEP-II and BaBar DND Review M. Sullivan Mar 23-24, 2009Page 10 LER magnets Arc dipole and quad

PEP-II and BaBar DND Review M. Sullivan Mar 23-24, 2009Page 11 Power supplies *HER –20 main magnet string supplies (chopper supplies) –81 Intermediate power supplies *LER –7 main magnet string supplies (chopper supplies) –131 Intermediate power supplies –6 solenoid winding power supplies *Miscellaneous HER/LER –6 final focus supplies (fairly big) –~6 Kicker magnet power supplies

PEP-II and BaBar DND Review M. Sullivan Mar 23-24, 2009Page 12 Intermediate Power Supplies Region 4

PEP-II and BaBar DND Review M. Sullivan Mar 23-24, 2009Page 13 IR magnet power supplies 2 of 6 final focus power supplies Breaker control center

PEP-II and BaBar DND Review M. Sullivan Mar 23-24, 2009Page 14 RF systems * MW CW klystrons – 476 MHz –12 Klystrons built by SLAC –3 klystrons built by industry (Philips) –One or two spares industry built (near end of useful operation) *16 Two MW DC power supplies – 80 kV, 25 A *16 high power RF circulators *36 RF cavities

PEP-II and BaBar DND Review M. Sullivan Mar 23-24, 2009Page 15 RF cavities Region 4

PEP-II and BaBar DND Review M. Sullivan Mar 23-24, 2009Page 16 Klystrons Region 4 circulator

PEP-II and BaBar DND Review M. Sullivan Mar 23-24, 2009Page 17 RF power supply There are 16 of these 2 MW power supplies. 15 are distributed around PEP-II, one is at the klystron test stand Region 8

PEP-II and BaBar DND Review M. Sullivan Mar 23-24, 2009Page 18 RF Power supplies 6 in region 4 6 in region 12 3 in region 8 Region 4 Region 12

PEP-II and BaBar DND Review M. Sullivan Mar 23-24, 2009Page 19 Inventory list of items removed *We maintain an up-to-date list of items removed from PEP-II *Requests are channeled through John Seeman and/or myself *Most of these items have so far been small and have gone to on site functioning accelerators *One exception has been some vacuum chambers and bending magnets that were a dedicated test site for electron cloud studies. These components were shipped to Cornell for further research into electron cloud amelioration.

PEP-II and BaBar DND Review M. Sullivan Mar 23-24, 2009Page 20 Inventory spreadsheets We have overall inventory lists of all the components in each ring

PEP-II and BaBar DND Review M. Sullivan Mar 23-24, 2009Page 21 Definition of the Minimum Maintenance State *Power supplies all locked off *Vacuum systems vented and all pumps turned off *Water systems –Magnet coils drained –Vacuum chambers drained –RF water systems drained –Water pumps off *Left functional, on and/or maintained –Tunnel lighting –Fire protection –Sump pumps –Exit lighting –Telephones *Tunnel access security *Regularly scheduled walk-throughs (monthly)

PEP-II and BaBar DND Review M. Sullivan Mar 23-24, 2009Page 22 Ring Status During the month of February, both rings have been carefully (a section at a time) vented to atmospheric pressure with dry N2

PEP-II and BaBar DND Review M. Sullivan Mar 23-24, 2009Page 23 Getting to MMS *Power supplies all locked off *Vacuum systems vented and all pumps turned off *Water systems –Magnet coils drained –Vacuum chambers drained –RF systems drained –Water pumps off Ready to start

PEP-II and BaBar DND Review M. Sullivan Mar 23-24, 2009Page 24 Organization J. Seeman M. Sullivan physicists ES&H C. Ferguson RP S. Rokni J. Vollaire O. Legeti A. Sabourov Engineering D. Kharakh S. Metcalf S. DeBarger B. Smith Area manager K. Burrows T. Galetto Inventory K. Burrows

PEP-II and BaBar DND Review M. Sullivan Mar 23-24, 2009Page 25 Budget

PEP-II and BaBar DND Review M. Sullivan Mar 23-24, 2009Page 26 Summary *PEP-II tunnel is in excellent shape *The hardware has been maintained in essentially running condition *We have vented the vacuum systems *We are ready to proceed with draining the water from the magnets and chambers as manpower becomes available *We plan to finish this in the next few months *This will put us into a minimum maintenance state with regularly scheduled inspections *The basic tunnel systems, lighting, sump pumps, fire protection, etc. will remain intact and maintained