Task Management Software needlestack. Radial View Each process instance represented by a line Length of line indicates time on current task.

Slides:



Advertisements
Similar presentations
User Interfaces and Visualizations for Development-Time Program Analysis James Holley.
Advertisements

Interactive Reporting v3.2. Multiple Order By Option Set multiple order by options.
EXCEED® IEP Quick Start Card – Student Record/Events 1.Select the left vertical bar to close the student panel, giving more space for the student record.
Chapter 5 Creating an Image Map.
Microsoft Word A full-featured word processing program for Windows and the Macintosh from Microsoft, which is included in the Microsoft Office suite. What.
Kanban Task Manager Single‒ Introduction
QUALITY TOOLS Tree Diagram. WHAT IS ? The tree diagram is used to break-up complex problems into smaller subproblems. Helps understand the complexity,
Chapter Day 23. © 2007 Pearson Addison-Wesley. All rights reserved Agenda Day 23 Problem set 4 Due Problem set 5 Posted (Last one)  Due Dec 8 Capstones.
Introduction If a rigid motion or a series of rigid motions, including translations, rotations, or reflections, is performed on a triangle, then the transformed.
Scaffold Download free viewer:
Journyx Projectlink™ Timesheet™ integration with Microsoft Project ® ENTER.
By Ray Info Solutions (P) Ltd.. For hotel industry, we offer our easy to use hotel software. It is a comprehensive software suite consisting of integrated.
Kanban Task Manager for SharePoint ‒ Introduction
In the Sandbox Playing with SkillPort 7 for the first time.
ARIS TRAININGARIS TRAINING
Before you begin If a yellow security bar appears at the top of the screen in PowerPoint, click Enable Editing. You need PowerPoint 2010 to view this presentation.
OPIM 5894 ADVANCED PROJECT MANAGEMENT ARIBA IMPLEMENTATION IN MED-X CASE TEAM 1
Kanban Task Manager helps teams visualize task workflows and makes it easy to cooperate on projects. With the SharePoint version of Kanban Task Manager.
Presents computation Grid Harness the power of Windows, Unix, Linux and Mac OS/X machines.
Before you begin If a yellow security bar appears at the top of the screen in PowerPoint, click Enable Editing.
 This project is about developing a software on finance and production management of industry NOVA POLYTEK.  This project will help to make calculation.
This information is confidential and was prepared by Bain & Company solely for the use of our client; it is not to be relied on by any 3rd party without.
Case Study ProsperaSoft’s global sourcing model gives the maximum benefit to customers in terms of cost savings, improved quality, access to highly talented.
Cisco Confidential 1 © 2010 Cisco and/or its affiliates. All rights reserved. GTM Toolkit 2.0: Guide Me Wizard February 18 th 2013.
Upon entering the site a “pre-loader” will cache the contents of the site on the user’s computer. Visually, a “Zen Circle” brush stroke will animate to.
© 2008 General Parts International, Inc. Written permission is required to copy or forward to anyone other than the intended recipient. 1 © 2008 General.
Similarity-Based Object Metadata Browser Progress Report Rod McFarland CPSC 533C.
What is the area of the shaded region?
State of Michigan Learning Management System (LMS) Viewing Your Transcript Updated: 10/29/2015.
E5 Tips - Miscellaneous CommandDetail “ The transaction information will be copied to the line below. DThe transaction information will be deleted. DDtype.
SCHOOL AND DISTRICT AGGREGATE REPORTS AGGREGATE REPORTS Where are the reports? What information can be found there?
MINIATURE ENGINEERING SYSTEMS GROUP DEVELOPMENT OF GAS FOIL BEARINGS FOR MINIATURIZED RTB CRYOCOOLER – PHASE III MATHEMATICAL MODELING AND ANALYSIS - II.
Albany ePAY onLINE for Introducing the facility to make Bacs payments directly from within your accounting application… …the easy and efficient way!
LOGIN PAGE Login Page Support CRM:
TargetProcess - AGILE Project tracking tool Shashwat Gupta CS
Means of Egress Chapter 3 Part 1: Stairs ID 234 Building Codes
Breadth-first and depth-first traversal CS1114
Building Boxes What is the largest volume open top box that you can build from an 8 ½ by 11 inch sheet of paper?
Basic Navigation in Oracle R12 BY: Muhammad Irfan.
Folksonomies, Social Tagging, and Library Catalogs By: Niki Kranich Information Visualization (554) May 6, 2008.
Getting Started Guide for Students.
AERObics Presented by Dana Senn Mariya Krasny Joe Hiber.
Means of Egress Chapter 3 Part 1: Stairs ID 234 Building Codes
Vincent Yee, P.E., User Conference | October 19, 2016
Monitor Student Test Status and Item Progress
GLASS MEASURING GUIDE View Series.
Abraj Automation Process Tool
Kanban Task Manager for Outlook ‒ Introduction
Kanban Task Manager Single‒ Introduction
Scholarship America Dollars for Scholars: Completing the Student Profile All Dollars for Scholars scholarships are applied for online via the Dollars.
Quicken technical support number SDFGFFGGDF. QUICKEN TECHNICAL SUPPORT NUMBER QUICKEN TECHNICAL SUPPORT NUMBER
ISN Contractor Quick Check
Kanban Manager ‒ Introduction
Operating System Design
Admin & Teacher Dashboard
Home Clear Medium-Fi Prototype
Operating System Design
Assignment #8 on Chapter 11: Search Trees (Sorry No Code)
Two Point Perspective Widget Walkthrough.
Chapter 9: Sequence Diagrams Chapter 5 in Software Engineering Book
امتحانات میں شامل سوالات کے برے ،اچھے اور بہترین نمونے
Information Flow Metric
Operating System Design
Chapter 9: Sequence Diagrams Chapter 5 in Software Engineering Book
Getting Started Guide for Students.
Munsell Color System a color space that specifies colors based on three color dimensions: hue, value (lightness), and chroma (color purity). It was created.
Default coloring is average filter value
Light Up Toys
Scholarship America Dollars for Scholars: Completing the Student Profile All Dollars for Scholars scholarships are applied for online via the Dollars.
For More Details:
Presentation transcript:

Task Management Software needlestack

Radial View Each process instance represented by a line Length of line indicates time on current task

Radial View Inner tick and position along radial indicates progress of process instance

Radial View Color of line indicates current status of process

Filter View Each Node represents an inidividual task in specific process instance Search form and easy access filters Color coding to represent status of task

Filter View Specific task metrics available by hovering over node

Vertical View Vertical View for a specific process instance Current Task on top

Vertical View Detailed metrics on the right side

Filter View

Vertical View