TOF calibration Y. Karadzhov. Y. Karadzhov, MICE CM26 24 March Slide 2 TOF Calibration - Trigger TOF1 TOF 0 TOF 1 TOF 2 The blue line encloses the calibrated.

Slides:



Advertisements
Similar presentations
January 6. January 7 January 8 January 9 January 10.
Advertisements

Validation of SCIAMACHY using POLDER as a reference 25 April 2006.
Detector Systems Update MICO March 17, MICE Detector Systems  CKOV u Mississippi RAL  TOF0/1 u Hamamatsu PMT assemblies show an increasing.
KEK Test Beam Phase II Plan Makoto Yoshida (Osaka Univ.) MICE FT Daresbury 2005/8/30.
TOF0 calibration The resolution in a given pixel can be measured before the absolute time calibration (see the plot) The expected total resolution of the.
M. Bonesini - VC TOF status M. Bonesini Sezione INFN Milano Bicocca.
M. Bonesini - 3/10/061 M. Bonesini INFN Milano Some results from BTF testbeam on TOF.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
Analysis Meeting – – Slide 1 Beam momentum measurement using TOFs: progress report Analysis Meeting, February 2008 Mark Rayner.
1 Analysis of TOF data Yordan Karadzhov St.Kliment Ohridski University of Sofia.
11-FEB-2004 TJR1 MICE Beamline TOF Analysis Tom Roberts Illinois Institute of Techology February 11, 2004.
Y. Karadzhov MICE MICO First EMR Plots 1.EMR detector has been successfully incorporated in the MICE DAQ system. 2.First 3 days of data taking in MICE.
March 31, Status of the TOF, Ckov and Virtual Detector Packages in G4Mice Steve Kahn Brookhaven National Laboratory Mice Collaboration Meeting March.
Linda R. Coney – 24th April 2009 Online Reconstruction & a little about Online Monitoring Linda R. Coney 18 August, 2009.
MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Control/Monitoring and DAQ for PIDs Edda Gschwendtner.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
MICE CM17 Feb 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM16 o Detector DAQ software o Front End Electronics o Schedule Milestones o.
Progress and plans on PID simulation and reconstruction Yordan Karadzhov Sofia university St. Kliment Ohridski.
Y. Karadzhov, MICE Video Conference 25-feb TOF Calibration - Trigger TOF1 TOF 0 TOF 1 TOF 2 The blue line encloses the calibrated area in the TOF stations.
MICO 15 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - User Run Plans.
Detector Systems Update MICO March 10, MICE Detector Systems  CKOV u No update  TOF0/1 u Tests with laser injection system progressing. u Tests.
Progress and plans on PID simulation and analysis Yordan Karadzhov Sofia university St. Kliment Ohridski.
The Time-of-Flight system of the PAMELA experiment: in-flight performances. Rita Carbone INFN and University of Napoli RICAP ’07, Rome,
1 M. Bonesini - CM 25 RAL 5/11/09 PID status report M. Bonesini Sezione INFN Milano Bicocca.
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Online Summary o Detector DAQ o Controls And Monitoring o Online Data Base o Bottom Lines Jean-Sebastien.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
1M. Ellis - MICE Video Conference - 15th March 2007 Software Report  New G4MICE Users  TOF Simulation and Digitisation  SciFi Reconstruction  Tracker.
Physics Program and Runs: Autumn 2011 & Step IV V. Blackmore MICE Project Board, 08/03/12.
27/6/05 Frascati1 M. Bonesini INFN Milano MICE TOF stations updates.
Particle Production in the MICE Beamline IPAC10 Linda Coney, UC Riverside, Adam Dobbs, Imperial College London, Yordan Karadzhov, Sofia University The.
Tracker Timing and ISIS RF Edward Overton 1. At CM32… 2 Had done some preliminary checks on the ISIS RF. Was beginning to think about how to handle the.
Online Reconstruction 1M.Ellis - CM th October 2008.
MICE CM January 2009Jean-Sébastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM23 o Detector DAQ o Trigger o Online Software o Front End.
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
M. Bonesini - MICE RAL M. Bonesini INFN Milano PMTs tests in B field.
MICE CM39 St Catherine’s, Oxford, 26 June 2014 Paul Soler Instrumentation Global Commissioning Plan.
M. Bonesini – CM 291 PID detectors summary M. Bonesini Sezione INFN Milano Bicocca.
Fiber routing test Marc & Qian (We did not glue in any fibers and only used tape for temporary purpose. We routed four fibers.)
Analysis meeting: Beam momentum measurements using TOFs Tuesday, 22 January 2008 Slide 1 of 10 Beam momentum measurement using.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
M. Bonesini - CM 22 RAL October 081 TOF0 status M. Bonesini Sezione INFN Milano Bicocca.
MICE CM February 08Jean-Sébastien GraulichSlide 1 Report on DAQ & CAM o Detector DAQ Status Hardware Trigger Software o Controls and Monitoring (CAM) o.
MICE, Uni-Geneva and the transnational access to MICE (MICE-TNA)
30/March/2009SPD commissioning activities1 SPD status (1)Electronics tests (2)Control/clock cables problem (3)Plans Calo commissioning activities meeting.
親愛的吉姆舅舅: 今天吃完晚餐後,奶奶說,在家 裡情況變好以前,您要我搬到城裡跟 您住。奶奶有沒有跟您說,爸爸已經 好久沒有工作,也好久沒有人請媽媽 做衣服了? 我們聽完都哭了,連爸爸也哭了, 但是媽媽說了一個故事讓我們又笑了。 她說:您們小的時候,她曾經被您追 得爬到樹上去,真的嗎? 雖然我個子小,但是我很強壯,
Monte Carlo simulation of the particle identification (PID) system of the Muon Ionization Cooling Experiment (MICE) Mice is mainly an accelerator physics.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
VC98 March 07Jean-Sébastien GraulichSlide 1 DDAQ Status o DAQ Software o Front-End and Trigger o What will happen soon o Schedule Milestones Jean-Sebastien.
Mark Rayner – Analysis SessionCM25, 4 November The TOF detectors: Beyond particle identification Mark Rayner The University of Oxford MICE CM25.
TOF Update GlueX Collaboration Meeting Jefferson Lab May 12, 2009 Paul Eugenio & Alexander Ostrovidov Florida State University.
L. Coney UC Riverside MICE CM32 – Glasgow – June 2012
Jean-Sebastien Graulich, Geneva
High-Resolution Micromegas Telescope for Pion- and Muon-Tracking
Chris Rogers, ASTeC, Rutherford Appleton Laboratory
The interaction region for FIRST (status report)
continued on next slide
F.Guber, A.Ivashkin INR, Moscow
Chris Rogers, ASTeC, Rutherford Appleton Laboratory
February 12 – 19, 2018.
                                                                                                                                                                                                                                                
continued on next slide
continued on next slide
Solve: 1. 4<
Tracker Software Status
Forward TOF Anton A. Izotov, PNPI.
continued on next slide
continued on next slide
Transnational Access to the MICE facility
Presentation transcript:

TOF calibration Y. Karadzhov

Y. Karadzhov, MICE CM26 24 March Slide 2 TOF Calibration - Trigger TOF1 TOF 0 TOF 1 TOF 2 The blue line encloses the calibrated area in the TOF stations.

Y. Karadzhov, MICE CM26 24 March Slide 3 TOF Calibration - Trigger TOF1 Time resolution after the calibration : TOF0 – 51ps; TOF1 – 62ps; TOF2 – 52ps. Why the resolutions of TOF1 and TOF2 are different since the two detectors are identical?

Y. Karadzhov, MICE CM26 24 March Slide 4 TOF Calibration - Trigger TOF0 Time resolution after the calibration: TOF0 – 50ps; TOF1 – 63ps; TOF2 – 51ps.

Y. Karadzhov, MICE CM26 24 March Slide 5 Data quality February runstatustrigger 01467good bad good good good good good good good good bad good good bad good good bad1 March runstatustrigger 01507bad bad bad bad bad good bad1 We still suffer from the loss of synchronization between the crates of the DAQ. This problem is visible only in TOF2 and KL.

Y. Karadzhov, MICE CM26 24 March Slide 6 Conclusions 1.Calibration for trigger in TOF0 and TOF1 is available. 2.Why TOF1 resolution is worse? Puzzle that has to be solved. 3.Data quality is not good.