Internal Seismic Isolation (ISC) Overview Report for the August CDS meeting Ben Abbott Caltech
2 Picture from Joe Giaime’s Talk Jan, ’05 G050007
3 Sensor Electronics (one per pod)
4 Actuator Electronics for All 3 Pods
5 Digital Electronics Interface
6 ADC and DAC Signal Chains
7 Rack Layout at LASTI
8 Flange Feedthroughs Needed per BSC (9) 25-pin D-sub feedthroughs (3) for the six GS-13s (two per pod) (3) for the six L4Cs (two per pod) (3) for the three STS-2 Sensors (one per pod) (12) Coax Feedthroughs for the Capacitive position sensors (four per pod) (12) 3-pin power connectors (four per pod)