November 17, 2004Tracker1 Tracker November System Manager Meeting R.P. Johnson U.C. Santa Cruz.

Slides:



Advertisements
Similar presentations
Tracker Subsystem1 GLAST LAT Project FM8/14 PSR, Oct. 5, 2005 GLAST LAT Tracker Towers 8/14 Pre-Ship Review INFN-Pisa.
Advertisements

2005 LAT-COLLABORATION MEETING Gamma-ray Large Area Space Telescope A walk through the LAT Tracker towers alignment Nicola Omodei INFN-Pisa.
The Gamma-ray Large Area Space Telescope: UNDERSTANDING THE MOST POWERFUL ENERGY SOURCES IN THE UNIVERSE The GLAST LAT Silicon Strip Tracker-Converter.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Tracker Test Plan Overview.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 R.P. Johnson, UCSC 1 Silicon-Strip Tracker Converter Robert P. Johnson Santa.
GLAST LAT ProjectF-to-F, March, TrackerR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face March Meeting Robert Johnson.
GLAST LAT ProjectMay 20, 2003 LAT Engineering Meeting Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS Revisions to Tray Design.
November 17, 2004Tracker1 Tracker MRB Wire Bond Encapsulation from MCM to SSD R.P. Johnson U.C. Santa Cruz.
Tracker Subsystem1 GLAST LAT Project FM16 PSR, Nov. 4, 2005 GLAST LAT Tracker Tower16 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S August Status Meeting.
GLAST LAT ProjectMonthly Status Meeting, June 30, Cost/Schedule Reports for 4.1 LAT Presentation Presentation May 2005 Month End Gamma-ray Large.
GLAST LAT ProjectOctober 14, 2002 Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS Engineering Meeting Tracker Engineering-Model.
July GLAST Project Installation Review LATLAT 1 Tracker Tower Installation Review Peter Amnuaypayoat
GLAST LAT ProjectDOE/NASA Delta Baseline/Preliminary Design Review, July 30, 2002 Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS.
Tracker Subsystem1 GLAST LAT Project FM7/9 PSR, Sept. 9, 2005 GLAST LAT Tracker Tower7/9 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectMonthly Status Review – Sept. 1, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectMonthly Status Review – December 2, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Darren Marsh SLAC Performance & Safety.
GLAST LAT ProjectSubsystem Managers Face to Face, November 17, GLAST Large Area Telescope: Darren Marsh Stanford Linear Accelerator Center Performance.
Tracker Subsystem1 GLAST LAT Project FM4/5 PSR, May 31, 2005 GLAST LAT Tracker Tower-4/5 Pre-Ship Review INFN-Pisa.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
MRB on SLAC NCR 226 MCM Encapsulation Delamination R.P. Johnson January 3, 2005.
GLAST LAT Silicon Tracker Marcus ZieglerIEEE The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus Ziegler.
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V41 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S LAT.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT Project18 July GLAST Large Area Telescope: NCR 529 Systems Engineering R. Bright Gamma-ray Large Area Space Telescope.
Tracker Subsystem1 GLAST LAT Project FM6 PSR, July 21, 2005 GLAST LAT Tracker Tower6 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
GLAST LAT ProjectNovember 17, 2004 AntiCoincidnce Detector 1 GLAST Large Area Telescope: Face to Face Meeting November 17, 2004 AntiCoincidence Detector.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 GLAST Large Area Telescope: Tracker Subsystem MCM Production Readiness.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Robert P. Johnson 1 GLAST Large Area Telescope: Silicon-Strip Tracker/Converter.
1 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa GLAST:Gamma Ray Large Area Telescope Ladders, Trays and Towers Construction A.Brez.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 8 NCRs were generated during TMCM preproduction NCR #00029, CLOSED.
Tracker Production Overview Readout Cables UCSC, SLAC (Parlex) SSD Procurement, Testing SLAC,Japan, Italy (HPK) Electronics Fabrication, burn-in, & Test.
GLAST LAT ProjectMonthly Review, November 3, 2004 Tracker SubsystemP. S. Drell 1 GLAST Large Area Telescope: Tracker Subsystem WBS Persis S. Drell.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Engineering Model Tower.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Schedule Summary; Critical.
GLAST LAT Project DOE/NASA Review, March 31, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: EM Mini-Tower Robert Johnson.
GLAST LAT ProjectMonthly Status Review – June 30, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
MRB on SLAC NCR 226 Excess of Disconnected MCM Channels R.P. Johnson November 9, 2004.
AFE Meeting June 5, 2001 SIFT UPGRADE Marvin Johnson.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
M. Gilchriese Items from Talks U.S. Pixel Meeting Santa Cruz July 2003.
GLAST LAT ProjectMonthly Status Review – Nov 3, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS E: MCM Assembly Gamma-ray.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Electronic Parts & Materials.
GLAST LAT ProjectQuarterly Review, November 12, 2002 LAT-PR GLAST Large Area Telescope: Tracker Subsystem Robert Johnson Santa Cruz Institute for.
Project Closeout Report. Closeout Components Project Objective Results Deliverable Results Lessons Learned Summary and Team Feedback Final Project Organization.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 LAT QA has hired a full-time on-site representative (Donald Knaepple)
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Introduction Robert Johnson.
Cable MRB July 13, 2005 R.P. Johnson. July 13, 2005R.P. Johnson2 Cable Status Needed in Italy to support Tower 8,9 Environmental Testing July 19.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Parts and Materials Procurement.
PITCH ADAPTER NI & AU THICKNESS. PN: LAT-DS rev 6 CMI X-Ray Fluorescence Measurement ExpressTech Santa Clara, Ca.
GLAST LAT ProjectMRB 09/14/2005 L. Latronico1 Tower 14 – Layer Y0 malfunction MRB Meeting – 14 September 2005.
Tracker Timing Margin MRB R.P. Johnson U.C. Santa Cruz October 15, 2004.
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Lessons Learned and Earned Value Management System Assessment
GLAST Large Area Telescope:
Buyer’s Purchasing Power
Introduction and Overview
GLAST Large Area Telescope:
GLAST Large Area Telescope: Tracker Subsystem WBS 4.1.4
Presentation transcript:

November 17, 2004Tracker1 Tracker November System Manager Meeting R.P. Johnson U.C. Santa Cruz

November 17, 2004Tracker2 Tracker Estimated Cost at Completion Actual Cost of Work Performed (ACWP), end of September ‘04$15,155,000 September outstanding commitments$1,537,000 Professional Services still to go (COI, Parlex, Tackes, etc.)$230,000 Travel forecast$143,000 Budgeted Cost of Work Scheduled for Labor through July ’05$492,000 Stellar Solutions Manpower (CR 4837)$552,000 Estimated liens$2,467,000 Estimated cost at completion (sum of all lines above)$20,576,000 Current budgeted cost at completion$17,126,000 Estimated overrun (difference of the above 2 lines)$3,450,000

November 17, 2004Tracker3 Liens Tungsten tile etching and priming at GSFCQuote$138,000 Introduction of new processes at Teledyne (bakeout, ESD ionizers, etc) Quote$73,000 Payment to Teledyne for MIP-1 failures due to CFMQuote$40,000 Increase term for source inspector at TeledyneQuote$53,000 More pitch adapters for MCM productionEst.$42,000 More Omnetics connectorsQuote$127,000 Purchase surplus SSDs from HamamatsuPO$62,000 More carbon-carbon closeout materialEst.$30,000 Out-of-house work required because of safety stand-downEst.$50,000

November 17, 2004Tracker4 Liens Overrun on flex-circuit cables (incl. 2 nd source)Wag$290,000 Various GSE, and upgrade to the CMM area (next slide)Est.$34,000 TQCM for T/V testingQuote$27,000 Sidewall prepregQuote$16,000 EMI testingWag$50,000 Continuation of Stellar Solutions labor through Sept.Quote$330,000 Continuation of SLAC over-budget labor through Sept.Est.$855,000 Misc. parts and materials to support Italian productionWag$150,000

November 17, 2004Tracker5 GSE Items Tower support stand$10,000 TEM/PS support$1000 Dark box$1000 Lifting hoist$5000 Lift sling$1000 Cable bending tool$5000 Pitch-adapter test fixture$3000 Upgrade to CMM area for contamination control$8000

November 17, 2004Tracker6 Descopes Build only 16 or 17 flight towers? –Tower-0 used up a lot of flight material that we have to replace if we want to build the 18 th tower. –We are having yield problems with other parts, in particular the MCMs. This potentially could require painful actions such as making more ASICs in order to built 18 more towers. We are already going out to purchase more long-lead material such as the carbon-carbon for tray fabrication, and we are considering building more bottom-tray closeouts (all U.S. expense). –Tower-0 probably could be refitted to make an acceptable beam-test tower by replacing or reworking the layers that are dead using good, but non-flight parts. –Such a beam-test tower would not require environmental testing, resulting in some more savings.