Launch Readiness Review Team Name University/Institution Team Members Date.

Slides:



Advertisements
Similar presentations
Basic Overview of Project Management and Life Cycle ACES Presentation T. Gregory Guzik January 21, 2003.
Advertisements

Protocol & Test Review Spaceport America Student Launch University/Institution Team Members Date.
Proposal Analysis Review NMSGC Student Launch University/Institution Team Members Date.
Data Test Review Spaceport America Student Launch University/Institution Team Members Date.
Critical Analysis Review NMSGC Student Launch Program University/Institution Team Members Date.
Flight Readiness Review New Mexico Space Grant Consortium University/Institution Team Members Date.
Comments on this template -Leave time for questions -Leave time for demonstration (at the final LRR) -Use your actual hardware in the presentation -Practice.
RockSat-C 2012 LRR Launch Readiness Review University/Institution Team Members Date.
Colorado Space Grant Consortium Virginia Space Grant Consortium 1 University A University B Team # Logo 1 Logo 2.
RS-X 2011—LRR 1 Pushing the RockSat Concept to New E x tremes Colorado Space Grant Consortium Launch Readiness Review (LRR) 8 July, 2011.
RockSat-C 2012 SITR Full Mission Simulation Report University/Institution Team Members Date.
Individual Subsystem Testing Report Team Name University/Institution Team Members Date.
Launch Readiness Review SloshSAT University of Northern Colorado Sage Andorka Dan Welsh Maurice Woods III Motoaki Honda Zach Sears 6/11/2010.
RockSat-C 2011 SITR Payload Subsystem Integration and Testing Report University/Institution Team Members Date.
Team Name Final Presentation Team Members Date Fall 2010 Rev A
RockSat-C 2011 ISTR Payload Subsystem Integration and Testing Report Universities/Institutions Team Members Date.
Team Name Critical Design Review Team Members Date Fall 2011 Rev A
Full Mission Simulation Test Report Team Name University/Institution Team Members Date.
Launch Readiness Review JASMM Virginia Tech Team Members: Robbie Robertson Zack HarlowJeremiah Shiflet Daniel Martin Matt James Anthony Rinaldi Senior.
Comments on this template -Leave time for questions -Leave time for demonstration -Use your actual hardware in the presentation -Practice your presentation.
Team Name Launch Readiness Review Team Members Date Fall 2011 Rev A
Team Name Final Presentation Team Members Date Rev
Launch Readiness Review River Rock 2010 University of Puerto Rico June 9, 2010.
Team Name Final Presentation Team Members Date. User notes –You may reformat to fit your design but make sure you cover the following points –You may.
Payload Subsystem Integration and Testing Report Team Name 1 Team Name 2 Team Name N Universities/Institutions Team Members Date.
Launch Readiness Review MinnSpec University of Minnesota Bryce Schaefer, Chris Woerhle, Art Graf
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
Critical Design Review Team Name University/Institution Team Members Date.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
Miscellaneous Notes: This is a bare-bones template – make it fancier if you wish, but be sure to address at least the items listed here. Basically this.
Team Name Flight Readiness Review (this is a bare-bones template – make it fancier if you wish, but be sure to address at least the items listed here)
CS Tutorial 4 Frid. Oct 16 th, 2009 Prototype Tutorial.
Preparing Kindergarten Students for the i-Ready Math Diagnostic Assessment These slides were reproduced from the i-Ready Diagnostic and Instruction User.
Care Transitions- Easy as Child’s Play –Right? Bronwyn Bartle DNP, CPNP-AC/PC Duke Children’s Heart Center.
Critical Design Review Team Name University/Institution Team Members Date.
1 Insert Project Title Here Tech Group Michigan Project Kick Off Date Insert Team Picture Here Insert team member names here.
VOLUNTEER MANAGEMENT SITE VISIT DATE The Leadership Development and Strategic HR Practice Area is presented by American Express. This Service Grant design.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
Team Name Final Presentation Team Members Date. User notes –You may reformat to fit your design but make sure you cover the following points –You may.
Judges Score Card Overview Mark Turner NASA Ames Research Center.
Launch Readiness Review
Northwest Nazarene University Chad Larson, Ben Gordon, Seth Leija, David Vinson, Drew Johnson, Zach Thomas June 1 st, 2012.
RockSat-C 2013 FMSTR Full Mission Simulation Report University/Institution Team Members Date.
Section 1: Mission Overview Mission Statement Mission Objectives Section 2: The Payload! User’s Guide Compliance Beta Prototype Testing Section 3: Check-In.
Agile Working Group 07/15/2014 Facilitator: Robert McCarthy Scribe: TBD 1.
RequirementMethodStatus The payload must not exceed a weight of 1.45 Kgm.Design, Test The payload must conform to the WFF “no volt requirement”
RockSat-C 2012 LRR Launch Readiness Review University of Minnesota Alex Richman, Jacob Schultz, Justine Topel, Will Thorson 5/27/2012.
User Acceptance Testing The Hard Way Graham Thomas BCS SIGIST 10 th May 1996.
Notes on this template You may reformat this to fit your design, but make sure you cover the information requested in this template. Presentations should.
2016 FMSR Team Name Full Mission Simulation Review (FMSR) University/Institution Team Members Date 1.
2014 CoDR Team Name Conceptual Design Review University/Institution Team Members Date 1.
Preliminary Design Review Metro State College of Denver Matthew Hanley, Daniel Bass 14 November 2008.
ESA UNCLASSIFIED – For Official Use Experiment Development and Integration Process Philippe Schoonejans, Head of Robotics and Future Projects Office ESA.
Tethered Aerostat Program Concept Design Review Team Name Conceptual Design Review University/College Team Members Date.
Introduction to Project Management Project Closure and Transition Lecture a This material (Comp19_Unit11a) was developed by Johns Hopkins University, funded.
Tethered Aerostat Program Concept Design Review College of Menominee Nation Conceptual Design Review College of Menominee Nation Marilyn Madosh, Larry.
RockSat-C 2013 SITR Payload Subsystem Integration and Testing Report University/Institution Team Members Date.
Office 365 Security Assessment Workshop
Team S.H.I.E.L.D. Final Presentation
Critical Design Review Team Name
Instructions for Narration
Launch Readiness Review
Launch Readiness Review
Communication Plan PPT Template
Team Name Conceptual Design Review
FRIDAY SLIDES TEMPLATE
Name of Project Manager Date
University Template Sample Slides June 2017.
Launch Readiness Report West Virginia University
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Presentation transcript:

Launch Readiness Review Team Name University/Institution Team Members Date

User notes: –This template shall be followed as closely as possible. –Deviations from this template will make it hard to assess your flight readiness. Without an understanding of your level of flight readiness, your chances of being awarded a primary position will be decreased.

Show off your payload –Pictures of your payload –Pictures of your team with the payload –Pictures of anything else that you think would be good/fun to show off User Guide ComplianceFinal PayloadIntegration Update/PlanTesting Results Level Of ReadinessRequired ToolsInspectionsQ/A

User Guide ComplianceFinal PayloadIntegration Update/PlanTesting Results Level Of ReadinessRequired ToolsInspectionsQ/A Type of RestrictionRestrictionStatus Mass allotment:<= your allotment Volume allotment:<= your allotment The payload’s center of gravity (CG):In 1”X1”X1” envelope of centroid? Activation met under requirement: (either 1.SYS.1 or 1.SYS.2) Yes? Structure mounts:Top and bottom bulkheads. No mounts to sides of cans. Sharing:Fully developed?

Where are you at on integration? Do you have a plan –What is it? –What areas worry you? Mitigation? User Guide ComplianceFinal PayloadIntegration Update/PlanTesting Results Level Of ReadinessRequired ToolsInspectionsQ/A

Any updates on testing –Pictures, plots, etc (may not be required if your payload has been complete and presented prior to this reviews) User Guide ComplianceFinal PayloadIntegration Update/PlanTesting Results Level Of ReadinessRequired ToolsInspectionsQ/A

Most important slide! (or two or three) Are you ready? What is ready? What isn’t ready? Why aren’t certain areas ready (if applicable) User Guide ComplianceFinal PayloadIntegration Update/PlanTesting Results Level Of ReadinessRequired ToolsInspectionsQ/A

Action Items from now until June 17 th !! –If you aren’t ready, will you be ready? How are you going to ensure you are ready? User Guide ComplianceFinal PayloadIntegration Update/PlanTesting Results Level Of ReadinessRequired ToolsInspectionsQ/A

Are you ready for Wallops? –What tools do you plan to bring? –What tools are you assuming you have at your disposal? –Are you brining extra hardware? Come prepared! User Guide ComplianceFinal PayloadIntegration Update/PlanTesting Results Level Of ReadinessRequired ToolsInspectionsQ/A

Have you went through the procedure? Do you have questions? Will you come prepared to ACE it? User Guide ComplianceFinal PayloadIntegration Update/PlanTesting Results Level Of ReadinessRequired ToolsInspectionsQ/A

Do you have a clear idea of how the week of integration/launch will go? What other questions do you have? User Guide ComplianceFinal PayloadIntegration Update/PlanTesting Results Level Of ReadinessRequired ToolsInspectionsQ/A