BLM Diagnostic Thursday June 19, 2008 Jeff Dooling 1 SLAC Redwood Room A/B, SLAC Thursday, June 19, 2008 BLM Testing at APS Jeff Dooling.

Slides:



Advertisements
Similar presentations
Lumi Analysis for HAPPEx III / PREX Presented by: Luis Mercado UMass - Amherst 5/18/2007.
Advertisements

June 14, 2007Pauli Kehayias1 Fast Ion Instability in CesrTA/ILC -Project extent –To study simulations of fast ion instability with CesrTA in mind -Progress.
05/03/2004 Measurement of Bunch Length Using Spectral Analysis of Incoherent Fluctuations Vadim Sajaev Advanced Photon Source Argonne National Laboratory.
Bingxin Yang 1/24/2008 Test and Calibration Plan for LCLS-BLM at the APS.
Geoff Pile FAC Review - Undulator 12 November 2008 LCLS Undulator System Overview and Fabrication Geoff Pile.
LCLS undulator diagnostics and commissioning workshop January 19-20, 2004 (UCLA) Zhirong Huang, SLAC 1 Linac Coherent Light Source.
Bingxin Yang High resolution effective K September 22-23, 2004 High-Resolution Effective K Measurements Using Spontaneous.
BLM Test Results 22 October SIC, Faraday cup and 2 cables mounted on Girder 5.
BLM PDR Thursday January 24, 2008 Jeff Dooling 1 SLAC Computer Building (Bldg 50, Room 115), SLAC Thursday, January 24, 2008 BLM Calibration—
William Berg Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor William Berg ANL/APS Diagnostics Group.
BLM review Mario Santana Leitner OUTLOOK ON FLUKA SIMULATIONS FOR UDULATOR DAMAGE AND BLM RESPONSE Mario Santana Leitner, Alberto.
Undulator Commissioning September 22, 2004 Heinz-Dieter Nuhn, SLAC / SSRL LCLS Commissioning Workshop Undulator / FEL Commissioning.
Luminosity Monitor Commissioning MICE Collaboration Meeting March 2010 Paul Soler, David Forrest Danielle MacLennan.
X-Ray Diagnostics for the LCLS Jan , 2004 UCLA.
LCLS Undulator Magnet Irradiation Sensitivity Workshop Thursday June 19, 2008 Jeff Dooling 1 SLAC Redwood Room A/B, SLAC Thursday, June.
Beam current4 A Beam pulse length1.5 ms Power input/structure 35 MW Ohmic losses (beam on)1.6 MW RF power to load (beam on) 0.4 MW RF-to-beam efficiency.
William Berg Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC William Berg ANL/APS Diagnostics.
Undulator Gap Increase Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
Josh Stein Beam Loss Monitor Control LCLS Undulator Systems Beam Loss Monitor Control Interface Josh Stein LCLS Undulator Controls.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
RF Systems and Stability Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
William Berg Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor William Berg ANL/APS Diagnostics Group.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
14/1/20097 January 2009MICE CM23 - Harbin - Beamline Session1 MICE Beamloss Data Adam Dobbs.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
K1.8 meeting Report from E05 group Toshiyuki Gogami 26 Dec 2014.
1.3 Using Formulas Geometry Perimeter Measures the distance around the edge of any flat object. To find the perimeter of any figure, ADD the lengths.
Areas involving rectangles and triangles For each rectangle you must be able to spot the length and width For each triangle you must be able to spot the.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
FP420/AFP Timing Two types of Cerenkov detector are employed: QUARTIC – two QUARTIC detectors each with 4 rows of 8 fused silica bar allowing up to a 4-fold.
Warm up for Section 4.8.
Xiao-Yan Zhao Beam Instrumentation Group Accelerator Center, IHEP BEPCII Background Issues: Beam Loss Measurement.
Experimenter Contributions to Booster Improvements Eric Prebys FNAL Accelerator Division.
Start Counter Collaboration Meeting September 2004 W. Boeglin FIU.
LHC 8:30 meetingEBH 1  Cryogenics recovery in point 8  Meanwhile a couple of accesses:  MKI investigation on noise in IP2  Insulation Vacuum.
1 TRD-prototype test at KEK-FTBL 11/29/07~12/6 Univ. of Tsukuba Hiroki Yokoyama The TRD prototype is borrowed from GSI group (thanks Anton).
Luminosity Monitor UKNF Meeting 7 June 2010 Paul Soler, David Forrest Danielle MacLennan.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
M. Körfer, DESY Salzau Light guide dosimeters and loss monitors H. Henschel, J. Kuhnhenn Fraunhofer-Gesellschaft INT M. Körfer, K. Wittenburg.
CERN November 22, 20041W.H.Trzaska HIP Jyväskylä T0 answers Meeting with LHCC referees CERN, November 22, 2004.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Second Harmonic capture in the IPNS RCS: Transition from SH to fundamental rf operation during the acceleration cycle using CAPTURE_SPC Jeff Dooling Presented.
NuMI Horn Alignment Cross-hair System NuMI Horn Alignment Cross-hairs Target Hall Instrumentation Review November 18, 2002 David Ayres Argonne National.
Area & Perimeter An Introduction. AREA The amount of space inside a 2-dimensional object. Measured in square units cm 2, m 2, mm 2 Example: 1 cm 2 cm.
Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 1 LCLS Undulator Diagnostics and Vacuum System Overview Dean R. Walters.
An electron/positron energy monitor based on synchrotron radiation. I.Meshkov, T. Mamedov, E. Syresin, An electron/positron energy monitor based on synchrotron.
Beam Loss Monitor Yoshinori Sato (KEK, IPNS) Target & Monitor Sub-Group.
ALICE setup: update on the installation 18/10/2010 Angela Intermite.
PERIMETER OF IRREGULAR FIGURES 2/26/16. WARM-UP FIND THE PERIMETER OF THE SQUARE 1 ¼ inches 1 ¼ + 1 ¼ + 1 ¼ + 1 ¼ = 5 inches or 4(1 ¼ ) = 5.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
Sergey BarsukElectromagnetic Calorimeter for 1 Electromagnetic Calorimeter for the LHCb experiment Perugia, Italy March 29 – April 2, 2004 ECAL CALO Sergey.
PPAC Parallel Plate Avalanche Counter Edwin Norbeck University of Iowa For meeting at SLAC June 2, 2004.
10 mm is the same as... 1 cm. 20 mm is the same as... 2 cm.
Q. What do we mean by finding the perimeter of a shape? Q. What strategies might you use for calculating the perimeter of a rectangle?
Lebanese Teacher Programme 18/04/2017
UNIT 8: 2-D MEASUREMENTS PERIMETER AREA SQUARE RECTANGLE PARALLELOGRAM
Alan Fisher APE Meeting
.., - I ':\ ' !' #
and their missing lengths
LCLS bunch length monitor utilizing coherent radiation
Forward TOF Anton A. Izotov, PNPI.
Overview Beam Position Monitoring Wire Scanners / Cherenkov Detectors
Placement of the LHC BLMIs around TI8 TED (Q9)
Area Of Composite Shapes
LCLS Injector Configuration
Undulator Physics Diagnostics / Commissioning Strategy Heinz-Dieter Nuhn, SLAC / SSRL August 11, 2004 Undulator Overview FEL Parameters Diagnostics and.
Rack Placement Chopper Workshop
PS-Booster Measurements for the LHC -BLM October 2002
ACCSYS Collaboration Board Triestre, 3rd october 2017
Presentation transcript:

BLM Diagnostic Thursday June 19, 2008 Jeff Dooling 1 SLAC Redwood Room A/B, SLAC Thursday, June 19, 2008 BLM Testing at APS Jeff Dooling Argonne National Laboratory

BLM Diagnostic Thursday June 19, 2008 Jeff Dooling 2 Measurements at APS What do they tell us?

BLM Diagnostic Thursday June 19, 2008 Jeff Dooling 3 Cerenkov Detector (CD) loss monitors in the APS SR Distributed around the SR, ~1 per sector Generally on the outboard side ~10 cm from the beam centerline Small fused-silica, cylindrical radiators (8-mm OD, 8-mm length), V=0.4 cc Close-coupled to small PMT

BLM Diagnostic Thursday June 19, 2008 Jeff Dooling 4 APS CD

BLM Diagnostic Thursday June 19, 2008 Jeff Dooling 5 CD Loss Signals during Top-UP

BLM Diagnostic Thursday June 19, 2008 Jeff Dooling 6 CD Loss Signals during Top-Up --with large signals the amplitude saturates but the width keeps growing

BLM Diagnostic Thursday June 19, 2008 Jeff Dooling 7 FO Beam Loss Position Monitor (BLPM)

BLM Diagnostic Thursday June 19, 2008 Jeff Dooling 8 BLPM Loss Signals during Top Up injection

BLM Diagnostic Thursday June 19, 2008 Jeff Dooling 9 Zooming in on the first injection loss case

BLM Diagnostic Thursday June 19, 2008 Jeff Dooling 10 Zooming in further on the first injection loss case

BLM Diagnostic Thursday June 19, 2008 Jeff Dooling 11 LCLS BLM

BLM Diagnostic Thursday June 19, 2008 Jeff Dooling 12 Prototype testing at APS

BLM Diagnostic Thursday June 19, 2008 Jeff Dooling 13 Prototype testing at APS —to go on in S35 and S9

BLM Diagnostic Thursday June 19, 2008 Jeff Dooling 14 Acknowledgments Bingxin Yang and Bill Berg have contributed many hours to this project Also need to thank Adam Brill, Matt Kasa, Lester Erwin, Tony Pietryla, Mike Merritt, Liz Moog, and C.Y. Yao